• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Porterbrook to create Pacer demonstrator (now unveiled)

Status
Not open for further replies.

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
The regulations attach to the engine not the train. So you can carry on reconditioning the old engine indefinitely and even fit it to a new train, but if an existing train gets a new engine it will have to comply with the new regulations.
This does beg the question of how extensive the "reconditioning" can be before the "old" engine is regarded as a newly manufactured one that must be Stage IIIB compliant. If virtually all the original parts are replaced, i.e. new cylinder block and head, crankshaft, pistons etc., does the engine still retain its grandfather rights?

I guess the bottom line is that there can be no net increase in the number of non-compliant engines in service, so a new train can only get an old engine if it was originally fitted to a carriage that has now been scrapped.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

class 9

Member
Joined
18 Nov 2010
Messages
1,080
That was the 150s (the oldest) after a Northern one was sent for heavy maintenance which finished up taking 18 months due to serious corrosion issues being found.

Angel trains 142s and 150s are in the process of having their floors replaced due to corrosion.
The 150s are being done at Wabtec Doncaster and the 142s at Holbeck.
They are Newton Heath sets, as they are returned there when done by Freightliner HH drivers.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
As an aside, I'm not sure how the SWT & Poterbrook plans are currently progressing with the trial re-geared SWT 158 - It has been back out in service recently, but the ZF Self Changing Gears seem to be giving it a much jerkier ride than the original Voith T211 set up, and the talk about re engining the fleet with newer fuel efficient engines seem to have gone quiet.

Interesting, as the Class 172s, while they sound like modern buses rather than trains[1], don't seem to ride particularly jerkily.

[1] What's new? The Class 101s sounded (and rattled) like classic buses.

Neil
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Interesting, as the Class 172s, while they sound like modern buses rather than trains[1], don't seem to ride particularly jerkily.

[1] What's new? The Class 101s sounded (and rattled) like classic buses.

Neil

The Leyland National buses sounded like trains - the someone had the idea of creating a train based on the Leyland National bus. :roll:
 

Murph

Member
Joined
16 Feb 2010
Messages
728
Interesting, as the Class 172s, while they sound like modern buses rather than trains[1], don't seem to ride particularly jerkily.

[1] What's new? The Class 101s sounded (and rattled) like classic buses.

The 101s had a BUT (AEC / Leyland) engine, which was basically a contemporary bus engine. Not certain, but it may well have been a Leyland O.680 in the 101s, which you would find in many Leyland buses.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,741
Location
Nottingham
To clarify, if an existing train gets a new engine, the new regulations that apply to engines apply, or the whole train becomes governed by the new regulations?

The regulations I am referring to are the European emissions rules, which apply to engines used in off-road equipment. So the new engine would have to meet the stricter emissions limits, which might involve providing extra equipment to clean up the exhaust. It wouldn't affect the compliance of the rest of the train with Group Standards etc.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Which is why GBRf and EMD did the silly thing where they built loads of engines for the 66s, shipped them here, sent them back and are now fitting them, because technically the engine is still fine. Does that mean that you could in theory design a new DMU compliant with latest group standards, but use an old engine that can be obtained in large quantities to power it - or do the latest group standards prohibit that?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,741
Location
Nottingham
This does beg the question of how extensive the "reconditioning" can be before the "old" engine is regarded as a newly manufactured one that must be Stage IIIB compliant. If virtually all the original parts are replaced, i.e. new cylinder block and head, crankshaft, pistons etc., does the engine still retain its grandfather rights?

I guess the bottom line is that there can be no net increase in the number of non-compliant engines in service, so a new train can only get an old engine if it was originally fitted to a carriage that has now been scrapped.

I don't know that level of detail. You'll have to dig through the regulations to answer that one - good luck!
--- old post above --- --- new post below ---
Which is why GBRf and EMD did the silly thing where they built loads of engines for the 66s, shipped them here, sent them back and are now fitting them, because technically the engine is still fine. Does that mean that you could in theory design a new DMU compliant with latest group standards, but use an old engine that can be obtained in large quantities to power it - or do the latest group standards prohibit that?

It was some kind of get-round of the emissions regulations. I think there was also a concession to allow a limited number of 66s to be built after they came into effect.

Yes you could put an old engine into a new unit. It would count as a new unit in terms of Group Standards but the emissions rules are a separate thing and the ones that would apply would be the ones that applied to the engine when it was built.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,651
Location
Hampshire
Has it been doing the Lymington branch or the Waterloo-Exeter route?

Initially it was being kept to the Salisbury 6 route, but it has been noticed working singly on the Salisbury to Waterloo stopping services and is now on the Lymington Branch as of this week.

The 101s had a BUT (AEC / Leyland) engine, which was basically a contemporary bus engine. Not certain, but it may well have been a Leyland O.680 in the 101s, which you would find in many Leyland buses.

Indeed they were, there is little difference between a rail mounted and bus mounted Leyland O.680 Engine and initially the earlier DMUs were powered by BUT (British United Traction - a joint venture between AEC & Leyland) engines, before the parternership was bought out by Leyland Motors who continued production until the advent of the TL11 Engine - Which also found use in buses such as the Leyland Tiger and the Class 140-144 Pacers.

Which is why GBRf and EMD did the silly thing where they built loads of engines for the 66s, shipped them here, sent them back and are now fitting them, because technically the engine is still fine. Does that mean that you could in theory design a new DMU compliant with latest group standards, but use an old engine that can be obtained in large quantities to power it - or do the latest group standards prohibit that?

That said, GBRf & EMD were at one stage looking into the possibility of constructing more 66s over here at Doncaster Roberts Road, and having the engines over here would be useful in case of a 66 requiring a spare engine before finding the loophole and sending the spare engines back to EMD.

Going back to the this thread though, I'm surprised RVEL are carrying out the work, I'd have thought Porterbrook would be working with Wolverton or WABTEC on this as apposed to RVEL who as of yet, have had little passenger rolling stock work.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Which is why GBRf and EMD did the silly thing where they built loads of engines for the 66s, shipped them here, sent them back and are now fitting them, because technically the engine is still fine. Does that mean that you could in theory design a new DMU compliant with latest group standards, but use an old engine that can be obtained in large quantities to power it - or do the latest group standards prohibit that?

It was some kind of get-round of the emissions regulations. I think there was also a concession to allow a limited number of 66s to be built after they came into effect.

Yes you could put an old engine into a new unit. It would count as a new unit in terms of Group Standards but the emissions rules are a separate thing and the ones that would apply would be the ones that applied to the engine when it was built.
I suspect that the DfT would look critically at any scheme that was a blatant attempt to evade the regulations on a large scale. For example, refurbishing the engines from Pacers as they are withdrawn and using them to power a new Class of DMU. Any minor modification to suit the new installation, for example in the interfaces or control systems, might be used as an excuse to regard it as a new type design of engine, which would therefore be subject to the latest regulations.
 

Murph

Member
Joined
16 Feb 2010
Messages
728
I suspect that the DfT would look critically at any scheme that was a blatant attempt to evade the regulations on a large scale. For example, refurbishing the engines from Pacers as they are withdrawn and using them to power a new Class of DMU. Any minor modification to suit the new installation, for example in the interfaces or control systems, might be used as an excuse to regard it as a new type design of engine, which would therefore be subject to the latest regulations.

Why would DfT do that? The regs in question are not DfT's regs, and are actually just as much of a PITA to them as to the industry. There's absolutely nothing gained for DfT by meddling with fake-enforcement of regs that are not theirs. If anything, the EU competition regs would probably prohibit the DfT from grossly misinterpreting the EU emissions regs like that.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
Why would DfT do that? The regs in question are not DfT's regs, and are actually just as much of a PITA to them as to the industry. There's absolutely nothing gained for DfT by meddling with fake-enforcement of regs that are not theirs. If anything, the EU competition regs would probably prohibit the DfT from grossly misinterpreting the EU emissions regs like that.

Given that the DfT allow the blatent mickey-take that is "connectional" bus services that aren't in the slightest bit connectional other than in the timetable, in order for them to be eligible for domestic hours, I suspect they'd turn a blind eye to this too.

Neil
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Not if it was a DfT authorised and sanctioned scheme by A British train manufacturer to build more DMUs for very low prices. Especially if said DfT was part of a eurosceptic goverment.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Why would DfT do that? The regs in question are not DfT's regs, and are actually just as much of a PITA to them as to the industry. There's absolutely nothing gained for DfT by meddling with fake-enforcement of regs that are not theirs. If anything, the EU competition regs would probably prohibit the DfT from grossly misinterpreting the EU emissions regs like that.

Not if it was a DfT authorised and sanctioned scheme by A British train manufacturer to build more DMUs for very low prices. Especially if said DfT was part of a eurosceptic goverment.
As I understand it, the DfT is responsible for enforcement of EU Directive 97/68/EC in the UK. The Directive is implemented into UK law. This is not some dastardly Brussels plot to cripple the UK's railways - these emissions standards are widely accepted internationally (not just in the EU) as necessary to protect public health from the harmful effects of particulates.
 

Murph

Member
Joined
16 Feb 2010
Messages
728
As I understand it, the DfT is responsible for enforcement of EU Directive 97/68/EC in the UK. The Directive is implemented into UK law. This is not some dastardly Brussels plot to cripple the UK's railways - these emissions standards are widely accepted internationally (not just in the EU) as necessary to protect public health from the harmful effects of particulates.

You were proposing that the DfT invent arbitrary rules which were not a part of the actual directive, to prevent people from being able to carry out business in ways permitted by the directive. I'd be surprised if such behaviour by them wouldn't end up being illegal, or at least the subject of significant backlash, public inquiries, etc. There's no benefit to the DfT from grossly misrepresenting the EU regs, so why on earth would they do such a thing?
 

Brian Aylott

Member
Joined
11 Oct 2012
Messages
262
Angel trains 142s and 150s are in the process of having their floors replaced due to corrosion.
The 150s are being done at Wabtec Doncaster and the 142s at Holbeck.
They are Newton Heath sets, as they are returned there when done by Freightliner HH drivers.

I presume that these are part of the planned C6 overhauls
Brian
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
You were proposing that the DfT invent arbitrary rules which were not a part of the actual directive, to prevent people from being able to carry out business in ways permitted by the directive. I'd be surprised if such behaviour by them wouldn't end up being illegal, or at least the subject of significant backlash, public inquiries, etc. There's no benefit to the DfT from grossly misrepresenting the EU regs, so why on earth would they do such a thing?
No, I was merely suggesting that the DfT might want to ensure that the business proposal is fully compliant with the letter of the regs before permitting old polluting engines to stay in service for another 30 years or more. Otherwise it could come under fire from environmentalists and health campaigners.
 

class 9

Member
Joined
18 Nov 2010
Messages
1,080
I presume that these are part of the planned C6 overhauls
Brian

Apparently not, although I'm not 100% about the 150s at Wabtec, the 142s being done at Holbeck are just have there floors replaced, they are not even replacing the seats, the bus style bench seats are going straight back in!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Stick a 153 in the middle of a 150/1 which is compliant to make a 3 coach unit, job done.

Been suggested before but apparently that would effectively create a new class of train due to 153s not being cleared for all routes 150s are cleared for and not all crews who sign 153s sign 150s and vice versa.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Been suggested before but apparently that would effectively create a new class of train due to 153s not being cleared for all routes 150s are cleared for and not all crews who sign 153s sign 150s and vice versa.

They are both existing designs so I dont see a problem, they would only work where they do now so what clearance and crew knowledge has to do with it I dont know!

It wasnt a problem when 153399 was formed up!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
They are both existing designs so I dont see a problem, they would only work where they do now so what clearance and crew knowledge has to do with it I dont know!

150s work to Buxton now. 153s don't as they aren't cleared for Hazel Grove-Buxton and Buxton crews don't sign them. Even if the 153s were cleared and Buxton crews did sign them there would still be the issue of peak time services on the Buxton line needing to the 4 car 150s due to the level of usage and platform lengths.

Similar situations apply to other lines as well. Just because it wasn't an issue to do it with 1 x 153 in the South West doesn't mean you can create 70 x hybrid trains and not have any issues.

Another technicality - would it require Porterbrook to buy 150s off Angel, or Angel to buy 153s off Porterbrook to be able to do that with all the 153s?
 
Last edited by a moderator:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,367
Location
Yorkshire
If the 153s were becoming centre cars in 150s or in any other units, signing them shouldn't be an issue for drivers at the very least, as the cabs won't ever be leading, surely?
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
If the 153s were becoming centre cars in 150s or in any other units, signing them shouldn't be an issue for drivers at the very least, as the cabs won't ever be leading, surely?

The cab equipment would be removed or isolated surely?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
Does it not make more sense just to double them up and make them into 155s? I thought the point was that adding a proper wheelchair space (there is one, but it's small and at the opposite end to the bog) and large bog will just reduce capacity to the point a single-car unit is not a sensible concept, particularly in these days of significant growth where there are very few services for which one is suitable even without the modifications?

Could there be a workaround with a chance for some kind of formal derogation if they are used for strengthening only, and never on their own? The wheelchair user would use whatever the other unit was.

Neil
 
Last edited:

Murph

Member
Joined
16 Feb 2010
Messages
728
Could there be a workaround with a chance for some kind of formal derogation if they are used for strengthening only, and never on their own? The wheelchair user would use whatever the other unit was.

It might not even need a derogation, as it seems like the regs already look at the train as a whole and not individual carriages. Reforming them into 155s (with the same PRM-TSI mods used for 156s) is probably the better option though, as you then retain the ability to run them alone, so probably easier for fleet management (can't end up with an unusable by regs unit stuck in a place where you really want to use it).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
It might not even need a derogation, as it seems like the regs already look at the train as a whole and not individual carriages. Reforming them into 155s (with the same PRM-TSI mods used for 156s) is probably the better option though, as you then retain the ability to run them alone, so probably easier for fleet management (can't end up with an unusable by regs unit stuck in a place where you really want to use it).

Probably. I think we're getting to the point where single units on their own are of very little use anyway. Though if demand continues to increase 3-car 155s might be worthy of consideration (and cheaper, as you'd only have to do all the modifications to one of them - only minor ones on the other two).

Where there is a line that merits only a single coach, such as a branch line (though even these are getting busier - I was amazed to read of trains full and standing on Ormskirk-Preston), as someone else said upthread the modified Pacers would be fine.

Neil
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,272
Location
Isle of Wight
Does it not make more sense just to double them up and make them into 155s? I thought the point was that adding a proper wheelchair space (there is one, but it's small and at the opposite end to the bog) and large bog will just reduce capacity to the point a single-car unit is not a sensible concept, particularly in these days of significant growth where there are very few services for which one is suitable even without the modifications?

Might be easier just to run them without any toilet at all, restricting them to shorter distance services on their own or in multiple with another unit which does have toilet facilities.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,367
Location
Yorkshire
The cab equipment would be removed or isolated surely?

One would think so- I was assuming a bargain basement conversion (just lock the cabs OOU), but either way, drivers wouldn't need to update their traction knowledge... Other than remembering the extra 23m!
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,039
Given that there maybe some need for single units why not keep a few a single units and convert a load into 3 coach sets for use on lines where 2 coach units are too busy?
 
Status
Not open for further replies.

Top