Grumpy Git
On Moderation
769456 has been fettled back into life after men with tools attended to it. Southport's longest station ornament is no more.
Best tools for that job would be some big gas bottles and a cutting torch.
769456 has been fettled back into life after men with tools attended to it. Southport's longest station ornament is no more.
Southport’s longest station ornament is a lost property toy dog wearing a face mask which can be found on top of the staff cabin next to the ticket barriers.769456 has been fettled back into life after men with tools attended to it. Southport's longest station ornament is no more.
There haven’t been many out for a while have there. 458 was running ok when I went on it yesterday. When did a 769 last reach Stalybridge?424/31/58 out today on Alderley edge diagrams
769456 has been fettled back into life after men with tools attended to it. Southport's longest station ornament is no more.
424 was on stalybridge diagram last ThursdayThere haven’t been many out for a while have there. 458 was running ok when I went on it yesterday. When did a 769 last reach Stalybridge?
I did 424 yesterday evening. It fair shot through to Bolton on electric and I was pleasantly surprised it kept time on diesel At least through to Hindley where it arrived early.
Got to admit, I’m more impressed than I had expected to be.
This evening Southport also happened be holding the British Musical Fireworks Championships, with hundreds of visitors from Wigan and beyond stranded after the last train to Wigan was cancelled at a moments notice and the last, a 2 car 156, left at 22:18, without a single spare seat and with passengers standing in the aisles for the full length of the train, with an empty 150 sat in the adjacent platform! Running 2 carriages to Southport should be outright banned as dangerous and so should cancelling the last train of the night!Evening service completely wrecked on the Southport line tonight, 769450 sat down between Gathurst and Wigan after one engine went caput at Meols Cop and the other went after leaving Gathurst. Lucky it didn't fail where all the level crossings are or it would've been even more of a headache to assist. As it was it needed assistance from the front (by another 769 obviously) - the only things behind it were 150/156 units.
Running a two car train (presumably instead of a 4-car in this case) might not be comfortable but it is not "dangerous". If it was 'banned', (by whom I don't know), you could have had no train running, would most passengers prefer that? There are often cases of trains in the south-east scheduled as 8 or even 12-car where a shortage of a suitable unit reduces it to four-car, and this happens on lines where crush loading is the norm with the programmed stock. Cancelling the last train is more problematic, however the TOCs have defined responsibilities when that happens in terms of assisting passengers to complete their journeys and should be held to account if they don't.This evening Southport also happened be holding the British Musical Fireworks Championships, with hundreds of visitors from Wigan and beyond stranded after the last train to Wigan was cancelled at a moments notice and the last, a 2 car 156, left at 22:18, without a single spare seat and with passengers standing in the aisles for the full length of the train, with an empty 150 sat in the adjacent platform! Running 2 carriages to Southport should be outright banned as dangerous and so should cancelling the last train of the night!
Presumably 769450 was rescued by 769458. Fortuitously 458 was working the 1750 Alderley Edge to Southport and was terminated short at Wigan Wallgate at 1859, shortly after the failure of 769450 (which was last recorded on RTT departing Parbold eastbound at 1849, 14L).Evening service completely wrecked on the Southport line tonight, 769450 sat down between Gathurst and Wigan after one engine went caput at Meols Cop and the other went after leaving Gathurst. Lucky it didn't fail where all the level crossings are or it would've been even more of a headache to assist. As it was it needed assistance from the front (by another 769 obviously) - the only things behind it were 150/156 units.
Fully agree.Clearly no lessons learnt from May 2018.
Adding to that the 37 at rhymney is probably having the time of their life769's are not fit for purpose. If there was a fleet of 500 or even 100 it would be bad enough with the quantity if failures, but they are nothing but a pile of junk.
Just stick a 37 the front permanently and be done.
Adding to that the 37 at rhymney is probably having the time of their life
About once a fortnight
Apparently the Blackpool fireworks last train suffered a similar problem.Running a two car train (presumably instead of a 4-car in this case) might not be comfortable but it is not "dangerous". If it was 'banned', (by whom I don't know), you could have had no train running, would most passengers prefer that? There are often cases of trains in the south-east scheduled as 8 or even 12-car where a shortage of a suitable unit reduces it to four-car, and this happens on lines where crush loading is the norm with the programmed stock. Cancelling the last train is more problematic, however the TOCs have defined responsibilities when that happens in terms of assisting passengers to complete their journeys and should be held to account if they don't.
I would hope that those crying kids were accompanied by responsible adults at the sort of times last traisn are run.Apparently the Blackpool fireworks last train suffered a similar problem.
![]()
Kids crying, station rammed as last train out of Blackpool cancelled
Blackpool Council warned that the popular event was likely to lead to increased congestionwww.lancs.live
Whilst I acknowledge that this thread is about the Northern 769s, the TfW fleet are apparently in a similar failure prone condition. TfW have nine units for five or six diagrams and these are pure DEMUs with no traction changeover. Yesterday TfW managed to produce three out of the nine and employed four single 2 car 150s on the other diagrams / part diagrams.But have we yet established the specific reasons why 769s are having such a bad time? Many of us support the bi-mode concept.
The failures of the service must be down to multiple factors, not all attributable to any particular type of train. None are deliberate and some involve combinations of incidents far away from Southport or Alderley Edge.
Significantly altering a 30 year old train was bound to bring challenges. To travellers who aren't as immersed in all things railway as members of this forum the trains are little different from any other 150 or 319, but they are all getting old.
Parts fail, spares may be hard to get, small classes mean fewer with experience and skills to fix them. It all builds up.
The concern seems to be greatest around the change from electric to diesel. If that's so why hasn't it been fixed? The diesel engines are new, so why are they breaking down? It won't be simple and will be commercially sensitive.
Having travelled the line on a unit that was working just fine I'm saddened to hear of the problems. I'm also saddened by the tone of glee that each failure seems to raise among some of the sceptics. Let's concentrate on getting the problems analysed and addressed, as I'm sure those responsible are desperately trying to do.
For me they've proved the bi-mode's worth. But we need to be ordering new stock that's proven in service and can't be ready for at least 2 years Maybe like 755s? They should have shaken out any introductory issues by now.
I'm one of the 769's biggest critics, but I take no pleasure whatsoever in their unreliability. I'm simply putting myself in the shoes of anyone who relies on them to commute.
There must come a point where the customer says to the vendor enough is enough?
You could have put wires up from Wigan to Southport for the cost of these scrapheaps.Totally understand where you're coming from, and they should have established what's wrong and got it fixed by now. Ordering new trains is the real answer. These are too old to be more than a stopgap, but it shouldn't be so difficult to establish exactly why they keep failing.
Still a good idea, as well as Oxenholme - Windermere.You could have put wires up from Wigan to Southport for the cost of these scrapheaps.
But have we yet established the specific reasons why 769s are having such a bad time? Many of us support the bi-mode concept.
The failures of the service must be down to multiple factors, not all attributable to any particular type of train. None are deliberate and some involve combinations of incidents far away from Southport or Alderley Edge.
Significantly altering a 30 year old train was bound to bring challenges. To travellers who aren't as immersed in all things railway as members of this forum the trains are little different from any other 150 or 319, but they are all getting old.
Parts fail, spares may be hard to get, small classes mean fewer with experience and skills to fix them. It all builds up.
Having travelled the line on a unit that was working just fine I'm saddened to hear of the problems. I'm also saddened by the tone of glee that each failure seems to raise among some of the sceptics. Let's concentrate on getting the problems analysed and addressed, as I'm sure those responsible are desperately trying to do.
For me they've proved the bi-mode's worth. But we need to be ordering new stock that's proven in service and can't be ready for at least 2 years Maybe like 755s? They should have shaken out any introductory issues by now.
Do you know how much they have cost Northern?You could have put wires up from Wigan to Southport for the cost of these scrapheaps.
It is, as you imply, the rosco that is likely taking the hit for these issues.Do you know how much they have cost Northern?
I always thought that, after all the trains are a technology demonstrator (waits for barrage of quips about demonstrating faults etc.) information gained from running will guide the railway when it has to break the current mad rush to buy cheap 'polluting only' DMUs from CAF.It is, as you imply, the rosco that is likely taking the hit for these issues.