So, what’s your big suggestion of a “new approach” to avoid engineering work closures (I take it you must have one?!) I’m sure NR will be keen to hear it.
I wouldn't say "new" but previous work on the Southern WCML resulted in Virgin running trains into Marylebone, or MML running HSTs from Manchester to St Pancras via the Hope Valley. Some smartarse will now pipe up with "only four platforms at STP" to which I respond that Project Rio involved terminating a Nottingham(?) service short to provide a path - not ideal for the Nottingham passengers who now have to change trains, but at least no one ended up on a bus. Spare units released by terminating a service short could allow the 222s to run as double sets.
So, you have a choice to plan your journey around the bustititions. I’m going out of my way to do so myself tomorrow, because I have no interest in sitting on an RRB for an hour and a bit…
Which is precisely what everyone else has done, they've all gone via different routes and those were overwhelmed.
Easter weekend, a but like the weekend before Christmas, isn't representative of the majority of weekends.
You don't keep an oversized fleet just to handle 2 weekends a year - the costs of doing so massively outweigh any benefits.
Many parts of the non-NSE railway struggle on any weekend, not just bank holidays.
The fleets are already sized to carry ordinary business, therefore they should not be withdrawing them without replacement.
I wouldn't even go that far. XC in particular can't cope with "ordinary business".
Easter weekend, Bank Holiday and the weekend before Christmas are not "ordinary business" - its a demand spike.
Ordinary business is what you'd have something like 70% of the time. And 70% of trains over a year don't run full and standing.
Full and standing for more than short periods of time should be unusual. Passengers left behind (other than during disruption or after major sporting events) should be exceptional.
Excluding London and airports what UK tourist destination is so busy these days you need relief trains?
Anywhere with a beach. Though to be honest, it's not relief trains that are needed, they just need to run proper length formations on the existing ones. If relief trains are run, they need to run just ahead of the booked ones, not behind.
Railways should be run professionally and cost effectively. There should be very little unnecessary slack or surplus stock.
GIven the small proportion of travellers in the UK that use the train network there's little reason for the taxpayers to be contributing more than is absolutely essential.
1. Treating passengers as cattle is not professional. 2. More people would use the trains if they weren't treated like cattle and charged handsomely for the "privilege"
The trend I’ve noticed is that stuff with is free or very cheap seems to attract numbers. Anything paid-for far less so.
I concur. Snowdonia was overwhelmed, North Wales Police were forced to close the A5 while they towed away 40 (that's not a typo) dangerously-parked cars. Shame the Conwy Valley didn't reopen until Saturday, if it ran more frequently and connected with a properly-integrated bus service it would really take the pressure off of the roads.
So, let’s get this straight … they spend some or all of the week at home, yet expect the railway to have infinite capacity to be ready and waiting for their once-a-week leisure journey, that might only happen if the weather is good. This model simply doesn’t work unless they’re prepared to pay absolutely shed loads of tax and/or very high fares.
As others have posted, there is enough capacity across the UK's fleet, it's just in the wrong places. Our poor rate of electrification and the fragmented nature of the railway means that it's all-but impossible to hire units between operators like we used to, the days of a DMMU being a DMMU or a Mk2 being a Mk2 are long one (no more GNER HSTs working XC services on weekends).