I don't want to put words into the OP's mouth, but perhaps part of his irritation stems from.the way aome other posters on here reacted to.a fairly.legitimate complaint. It is not 'whinging' to point out that, for 2 hours in the morning peak, services on one of the main lines between 2 of England'a biggest cities were reduced to a single 2 car DMU, whose operator neither acknowledged, nor apoligised for, nor attempted to explain the problem.
These events, which seem to have arisen from.the chronic lack of resilience on the local network becoming acute during the Lime Street blockade, illustrate a deeper problem which has been underlined by the Lime Street works. Which is that no-one in a position of responsibility seems to.care much about whether.Liverpool temains connected to the outside.world or not. Was it really necessary for Network Rail to close the whole? or virtually the whole station for.2 months ? Have TPE really no.alternative to running nothing west of Victoria, given they stop at 2 intermediate stations between there and Liverpool ? Is an hourly 319 really an adequate substitute for the 2 TPE and 2 Northern services which usually run per hour over all or part of Chat Moss ? The people who run the railway often seem to treat Liverpool as a bothersome appendage which can't drop into the sea fast enough for them, and some on here seem to share the same attitude.