Killingworth
Established Member
It's going to be decades before HS2 East can be completed. MML electrifcation can't be completed within 10 years either, not at present construction speeds anyway. We can concentrate on decarbonising lots of what we've got in the next 20 years and there'll still be many miles to do.Your probably right but I think if the Eastern Side is not getting HS2 and just an upgrade to the existing TPE route and probably full Electrification of the Midland Line its not going to go down well that's for sure, when you can get to the North West in half the time, never mind the North South divide it will be the East West divide.
At the present rate of progress with HS2 all the limestone in the Peak District will be cement and Drax certainly won't be burning wood pellets by the time it's complete. All transport markets will have moved on by then.
I'll be up on a cloud watching completion of new baseline tunnels between Sheffield and Manchester, Manchester - Leeds and Leeds - Sheffield all offering fast passenger connections in 25 minutes or less. Those who, over 100 years ago, built the tunnels we're still using must be amazed at our lack of ambition and ability to get things done. How we can't shift many thousand more standard containers around the country when they managed to get small truck loads between thousands of pick up and drop off points using pen and ink to arrange it. Perish the thought, maybe it's an underground freight network we need, a bit like the national oil pipeline that takes oil products from refinery to airfield, but that's a speculative tangent too far.
.
