Nothing concrete yet in all this speculation. Well for some concrete. TPEXP are due to make an announcement on 1st April, 2016 re new trains. They are in discussion with 3 manufacturers to build the new trains and so cannot comment on any which trains they are to order until they have signed. The new CEO has been told by the legal boffins not to say anything about any new trains at the present time.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Viscount702

Member
Joined
7 Sep 2011
Messages
336
How many diagrams are required for CLE LDS and Hull. Is 29 185s enough for these bearing in mind that it has now been said that all if not most Sheffield trains will be 6 cars
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
How many diagrams are required for CLE LDS and Hull. Is 29 185s enough for these bearing in mind that it has now been said that all if not most Sheffield trains will be 6 cars

Probably only between Sheffield and Manchester (maybe Airport) and maybe as far as Doncaster but I cannot see 6 cars needing to operate to Cleethorpes.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
How many diagrams are required for CLE LDS and Hull. Is 29 185s enough for these bearing in mind that it has now been said that all if not most Sheffield trains will be 6 cars

Hull is 5 diagrams currently and they'll probably need 8 class 185 diagrams in total for North TPE by the time they'll be an additional hourly Manchester-Leeds only using 185s.

So if all the North TPE c.185 services will all be 3 car that would leave around 18 units for South TPE after maintenance and spares are allowed for.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,905
Location
North
Dave, don't ever use a bus, you'll have an aneurism if you see what's going off with floors on buses !

But not for the next 20-40 years unless the condition is familial. Most people don't develop an aneurism until post 60 and even then it is not always fatal. I would say not even 5% of deaths are due to a ruptured aneurism so statistically use as many buses with floors as you like.
 
Joined
2 Jan 2009
Messages
527
So the suggestion is that they're going to order Hitachi AT300s on the back of the Great Western order.

Which presumably means a build in Italy. That will go down *very* well in the North East...
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
The relevance of that particular date is not altogether lost on me.

What, that the rolling stock procurement exercise enacted by First was in fact a complete bluff, and that the plan all along was for Class 442/373/230 locomotive haulage? (delete as appropriate :lol:)
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
An internal e-mail from my manager suggests 5 car HST's will be used on LIV-EDB ECML work, however they also put 5 or 10 car which would preclude HST's as they lack any oomph when loaded higher than 8, plus with MEN also suggesting cascaded HST's this does lead to a possibility TPE will receive FGW's 180's when IEP comes on stream. This over the ridiculously oversubscribed HST cascade freed up by the late running IEP electrification program is of course pure speculation. We can read into stuff and try and guess but info coming out of the franchise is certainly lacking at the moment.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
An internal e-mail from my manager suggests 5 car HST's will be used on LIV-EDB ECML work, however they also put 5 or 10 car which would preclude HST's as they lack any oomph when loaded higher than 8, plus with MEN also suggesting cascaded HST's this does lead to a possibility TPE will receive FGW's 180's when IEP comes on stream. This over the ridiculously oversubscribed HST cascade freed up by the late running IEP electrification program is of course pure speculation. We can read into stuff and try and guess but info coming out of the franchise is certainly lacking at the moment.

It appears Charlotte Cox who wrote the MEN article was at the same TfGM presentation which has been posted on here and is known for getting her facts wrong and has apparently annoyed senior people at TPE by somehow coming up with a 125mph cast-off story out of thin air.

The 44 new 125mph capable trains which TPE are acquiring and hoping to have the first batch in service by December 2017 will all be 5 car formations.
 
Last edited by a moderator:

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
IF, and thats a big IF, the plan is to run 2x5car on some services, there will be a lot of platform lengthening to add to the route, unless some sort of selective door operation is used. HUD=9, CLS=5 at a pinch both spring to mind. Siemens were apparently not happy with UDB being used on 185's in passenger service.

An internal communication does indeed state that £7million will be spent on platform lengthenings. So knowing NR's costings that will be about 4 platforms or 2 stations! (Chester-le-Street and Yarm?...)
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
...this does lead to a possibility TPE will receive FGW's 180's when IEP comes on stream.

And yet it is stated unambiguously in the GW franchise agreement that the 180s are going to be leased by GC from Dec 2016, with 4 sets temporarily sub leased back until their IEP replacements arrive.

It is rather surprising that they keep cropping up in other cascade theories.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
IF, and thats a big IF, the plan is to run 2x5car on some services, there will be a lot of platform lengthening to add to the route, unless some sort of selective door operation is used. HUD=9, CLS=5 at a pinch both spring to mind. Siemens were apparently not happy with UDB being used on 185's in passenger service.

I doubt they'll be any regular 10 car workings but maybe there might some when special events are on such as the Edinburgh Festival.
--- old post above --- --- new post below ---
And yet it is stated unambiguously in the GW franchise agreement that the 180s are going to be leased by GC from Dec 2016, with 4 sets temporarily sub leased back until their IEP replacements arrive.

It is rather surprising that they keep cropping up in other cascade theories.

I don't think the Hull Trains have been secured by a future operator but then they are going to with HT for a few years yet.
 

pjm0512

Member
Joined
29 Jul 2015
Messages
46
The pictures of the blandish interior is very similar to the renders of the 800/1/2s, which I think strengthens the chances of AT300s.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
The pictures of the blandish interior is very similar to the renders of the 800/1/2s, which I think strengthens the chances of AT300s.

The interior shots in the TPE presentation are undoubtedly based on Desiro interiors.
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
Having agreements and a working reputation and experience with siemens already would put siemens in a competetive advantage. Being able to work in multiple with the existing 185 fleet for service recovery or rescue purposes would also be an advantage although not a necessity, however Siemens dont have hybrid experience that hitachi do. Having said that, theres no reason why Siemens couldnt employ a hitachi traction package, just as Bombardier use an Alsthom traction package in the voyagers.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Being able to work in multiple with the existing 185 fleet for service recovery or rescue purposes would also be an advantage although not a necessity

Siemens haven't exactly got a reputation of coming up with new designs which are compatible with their old designs.

The Turbostars are compatible with Sprinters, the 323s are compatible with 31xs, while an Alstom Pendolino can rescue a failed Bombardier Voyager (as you suggested) so a different manufacturer doesn't automatically mean the trains can't be compatible.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
The Turbostars are compatible with Sprinters, the 323s are compatible with 31xs, while an Alstom Pendolino can rescue a failed Bombardier Voyager (as you suggested) so a different manufacturer doesn't automatically mean the trains can't be compatible.

And vice versa, which is in many ways all the more impressive!
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
An internal e-mail from my manager suggests 5 car HST's will be used on LIV-EDB ECML work, however they also put 5 or 10 car which would preclude HST's as they lack any oomph when loaded higher than 8, plus with MEN also suggesting cascaded HST's this does lead to a possibility TPE will receive FGW's 180's when IEP comes on stream.
The Edinburgh services aren't due to start until December 2019, at which point TPEs' whole new fleet of trains will be in place. Transpennine don't need HSTs during the timescales which they will become available, and as has also now been mentioned the FGW 180s are already earmarked for use by Grand Central.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Siemens haven't exactly got a reputation of coming up with new designs which are compatible with their old designs.

is that just down to where some have got the electrical block on the top of the coupling and others have got it on the underneath of the coupling?
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
I suppose the other entanglement is that First Groups AT300 contract was 29 for GWR plus options on 30 more. Since when it seems Hull Trains have taken 5, leaving 25 options - is 32 suitably close to continue in a way that 44 isnt? Is that a reason for the 12 WCML units to be ordered from elsewhere?
 

Brian Aylott

Member
Joined
11 Oct 2012
Messages
262

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
Old news - that is from a 2014 press release
They lease these extra 5 but they are sub-leased back to GWR at present
The GW franchise agreement gives the date of 12/2016 for the current lease end date, after which four of them will be subleased back to GW. Your explanation is correct but early... :D
 