I do wonder if it isn't worth a gentle prod though just to point out that whatever information they've been given, I'm sure in good faith, appears to clash with what Network Rail are actually talking about seeing built in their application documents with the relevant planning authority. Which you would hope would be accurate considering who they're being put in front of!Well that’s the official unit plan for when it opens. I trust the person implicitly who has done the detailed work on this (since the start of the planning for this around 3 years ago).
I wonder if perhaps there has been some level of disconnection here between the engineering side that Network Rail are working on in terms of getting the facility build, and the planning side of Northern who are doing the unit plan? I feel as if perhaps that has happened to end up in the situation where planning seem to be coming up with a plan for the depot which the documentation shows physically cannot accommodate the number of units suggested. Feels like all it needs is someone in Northern to ping an email over to Network Rail just to clarify the usable length of the various depot roads that Network Rail are building?
But then I'm just a humble passenger...