Especially when compared to services to Manchester/ Liverpool etc.
I have heard that they are proposing flights from Harwarden to Cardiff soon!
Especially when compared to services to Manchester/ Liverpool etc.
I have heard that they are proposing flights from Harwarden to Cardiff soon!
Of course, it might make a huge difference if they built a railway station at Hawarden airport.They used to, but lack of interest killed it off, but if WG throw £2M at it like the Anglesey tourist flight to keep Cardiff Airport open, then that would be a different kettle of fish, but I don't see that occurring, ...
Of course, it might make a huge difference if they built a railway station at Hawarden airport.
Not to mention the flat junction in Wrexham and the freight which uses the line in Wales. I'm pretty sure all of the studies were into OHLE anyway, with the assumption that Merseyrail would acquire a few dual voltage trains from somewhere before a through service began.I was led to belive that no new "3rd Rail" installments were permitted. The cost of the security and fencing alone will be huge. I cannot ever see it happening anywhere between Wrexham and Bidston. It should really go light rail with overheads but then you have the link to Liverpool.
Things have moved on since 2007. In particular, Aviation Park Group (who own Hawarden Airport) are building a terminal building, and are looking around for anyone who wants to use it. No Labour politicians are currently willing to comment on whether they're happy to subsidise such flights, going by the story here.They used to, but lack of interest killed it offI have heard that they are proposing flights from Harwarden to Cardiff soon!
Not to mention the flat junction in Wrexham and the freight which uses the line in Wales. I'm pretty sure all of the studies were into OHLE anyway, with the assumption that Merseyrail would acquire a few dual voltage trains from somewhere before a through service began.
Things have moved on since 2007. In particular, Aviation Park Group (who own Hawarden Airport) are building a terminal building, and are looking around for anyone who wants to use it. No Labour politicians are currently willing to comment on whether they're happy to subsidise such flights, going by the story here.
Oh, and a railway station would make little difference to anyone. There are already frequent 'buses which pass the stop on the other side of the airport site, so anyone travelling there by public transport should have few difficulties. The owner's web site currently seems to assume that everyone will drive there, but I'm sure this will change once it becomes operational. Maybe even without input from the WAG.
On an unrelated note, does anyone know what's happening with the Wrexham-Bidston line at the moment? According to NRE, the last train each way is being cancelled each day for the foreseeable future, and replaced by a 'bus which reaches Wrexham an hour later than the original train did. The timetable shows it being cancelled until 22/3, but NRE doesn't show it returning to normal at all.
As this train is convenient for anyone who wants to go from Chester to Wrexham after the last direct train has left, it would be nice to know where the mistake is.
Well it is a frontier station...
Actually, one of the practical reasons is that 3rd rail electrification is incompatible with steel sleepers.
And predictably, NR have recently relaid much of the line with steel sleepers.
Then there's the NR "no more 3rd rail" posture.
Anyway, the business case is the critical thing and I can't see it working.
If there was a 2tph DMU service it might test the water a bit more.
Is there some unsurmountable obstacle to running diesels into Birkenhead North?Perhaps OHLE when Merseyrail get the dual voltage trains, that line would be a hell of a lot more useful if it went all the way to Liverpool. Getting it one more stop to Birkenhead north would be a huge improvement.
Not to mention the flat junction in Wrexham and the freight which uses the line in Wales. I'm pretty sure all of the studies were into OHLE anyway, with the assumption that Merseyrail would acquire a few dual voltage trains from somewhere before a through service began.
Things have moved on since 2007. In particular, Aviation Park Group (who own Hawarden Airport) are building a terminal building, and are looking around for anyone who wants to use it. No Labour politicians are currently willing to comment on whether they're happy to subsidise such flights, going by the story here.
Oh, and a railway station would make little difference to anyone. There are already frequent 'buses which pass the stop on the other side of the airport site, so anyone travelling there by public transport should have few difficulties. The owner's web site currently seems to assume that everyone will drive there, but I'm sure this will change once it becomes operational. Maybe even without input from the WAG.
On an unrelated note, does anyone know what's happening with the Wrexham-Bidston line at the moment? According to NRE, the last train each way is being cancelled each day for the foreseeable future, and replaced by a 'bus which reaches Wrexham an hour later than the original train did. The timetable shows it being cancelled until 22/3, but NRE doesn't show it returning to normal at all.
As this train is convenient for anyone who wants to go from Chester to Wrexham after the last direct train has left, it would be nice to know where the mistake is.
Is there some unsurmountable obstacle to running diesels into Birkenhead North?
Is there some unsurmountable obstacle to running diesels into Birkenhead North?
you'd need to introduce a 3rd DMU into the diagrams to maintain an hourly schedule.
How do you get to that conclusion?
Check out the turnaround times in the working tt at Wrexham Central and Bidston - theirs no slack whatsoever. Its arrive and change ends straightaway- going to Birkenhead North is too much for 2 units.
Check out the turnaround times in the working tt at Wrexham Central and Bidston - theirs no slack whatsoever. Its arrive and change ends straightaway- going to Birkenhead North is too much for 2 units.
Grabbing another 150 from South Wales to allow running through to Birkenhead North seems a lot, lot cheaper than installing 3rd rail / OHLE.....
Is there some unsurmountable obstacle to running diesels into Birkenhead North?
I think electrification and integration into the Merseyrail network would be better in the long term for passengers and should help secure the future of the line
DMU's used to run to Birkenhead North from the Wrexham - Bidston line, years back, using island platform as te turnaround. Also, there was a time that the service from Wrexham ran up the 3rd rails to New Brighton, using the Bidston West triangle towards Wallasey Village.

Running into Birkenhead north would have need the track reorganising to bring all three platforms back into use I don't see how you would do it without conflicting movements.
But the benefit would be quite substantial for connectivity instead of 2tph Liverpool and 2tph west Kirby as connections you have 4tph Liverpool and 2tph New Brighton. Not to mention the shiny new park and ride.
Acquiring a new DMU isn't worth it though if the money has to be spent get line speed improvements in where possible and build the case for electrification.
Ideally we would have this getting electrified in time for Merseyrail's train order and the two current units cascaded down to south Wales. But that would be joined up thinking which isn't allowed, also money.
750vDC overhead light rail has to have significant attractions. On day interworking with the hoped-for Birkenhead "Streetcars" scheme.1-the condition of track
2-the severe gradients
3-the stations are really close together
4-the curves
The ongoing renewal campaign will improve the quality of track between Shotton and Wrexham but the stop start service remains the same.
1-the condition of track
2-the severe gradients
3-the stations are really close together
4-the curves
The ongoing renewal campaign will improve the quality of track between Shotton and Wrexham but the stop start service remains the same. By the time the unit accelerates to 40 its on the brakes again for the next stop!
Increasing the linespeed means increasing the wear and tear on the already unreliable 150's. linespeed enhancements will probably happen but where and when is anyone's guess!!!
I would have thought other electric trains would be a bigger potential problem than diesel-hauled freight. I know the Wrexham - Bidston passenger service is pretty well isolated, but I do have concerns that installing OHLE other than the standard 25kvAC on parts of the national rail network may lead to future problems with extensions of 25kvAC (eg. a frieght route entirely electrified, but run with diesel traction because part is electrified using the wrong sort of electricity for the electric locos).750vDC overhead light rail has to have significant attractions. On day interworking with the hoped-for Birkenhead "Streetcars" scheme.
The problem is - how to coexist with diesel hauled freight.
Do you reckon an EMU would cope better with the timings, or is the answer to skip certain stops?
The real attraction of light rail to Rock Ferry is the longer term possibility of dual voltage long distance passenger trains there after (hah!) Crewe-Chester is electrified.... Not sure if there would be any point running one around the haymarket tunnel and into central maybe even to rock ferry would be more in the centre but that's a dam old tunnel.
Our current proposal would run through the planned development, ensuring that no new building is more than a short stroll from a tramstop. We will then upgrade the existing Wirral Tramway alignment and share it with the heritage operation to reach interchanges at Hamilton Square Merseyrail station and at Woodside Ferry. We expect the line to become an integral part of the Wirral Waters development and the natural way for those living and working in the area to travel. As it says on an apartment building in Portland come by Streetcar