• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

MML Electrification: progress updates

Status
Not open for further replies.

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,852
Location
Northampton
Only SPC3/34 (next to Braybrooke ATFS) I believe, but that's due to start imminently.
SPC3 bridges 42, 35, 28E, 28, 25, 24, 19 (done way back), 18, 10, 9, 8 (done way back), 7, 3 and possibly 2 have all had work to modify/demolish the bridge completed or underway.
SPC3 bridges 40, 39, 28D and 15 have all had track lowering completed or are in the midst of track lowering works.
SPC3 bridges 39, 38, 16B and possibly more are using surge arresters.

Someone I know is a retired bridge engineer and he mentioned to me that some of the bridges, not on electrified routes, he had been involved with had the clearance increased when rebuilt (to 'future-proof' for possible electrification) but this increased height would not be sufficient if the line under it was to be electrified now, because of the changed (EU???) legislation. I know he was involved with bridges around Oakham/Melton so he may have had ones on the MML in mind. Do you know if this is definitely not the case?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
Looks like the pile was driven just too wide for the portal- hence the adaptor, and the far pile is proud anyway.

WAO
 

380DC

Member
Joined
8 May 2023
Messages
11
Location
Derbyshire
Bizarre arrangement with that portal nearest the camera - the Down side leg seems to be sitting on a "chair"! (@Elecman and others in the OLE trade know what I mean ;) )
The UDS pile's gone in the wrong orientation, so they've used a pile orientation adapter bracket
 
Last edited:

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Off-topic, but what is the SE train doing on the MML??

Off for storage at Worksop, most likely. A few networkers are being stored due to displacement by 707s, and a severe lack of siding space on the SE network.

It’s good to see electric trains have made it to Kilby Bridge well ahead of schedule :).
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
Off for storage at Worksop, most likely. A few networkers are being stored due to displacement by 707s, and a severe lack of siding space on the SE network.

It’s good to see electric trains have made it to Kilby Bridge well ahead of schedule :).
Ha ha. But seems they have mucked it up on the MML - wrong kind of electrification :E.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,084
There are masts up further North than post 6782 shows, as they can be seen where the Welford road goes under the MML, no cantilevers there yet though.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,569
Location
Lancashire
Looks like the pile was driven just too wide for the portal- hence the adaptor, and the far pile is proud anyway.

WAO
I’d agree with that it’s more like a adaptor saddle to correct the height for the portal
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
I’d agree with that it’s more like a adaptor saddle to correct the height for the portal
It looks like the adapter is to compensate for slight error in centering the piles as the horizontal beam (crossbar) isn’t an adjustable length unlike the one behind. The difference in pile depths is likely to be to accommodate the adapter.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Maybe they’re transferring up to EMR-land to have a pantograph attached in order to supplement the shortformed 360 services :lol:

Let’s hope not. Given how much people moan about the 360s, I dread to think how they’d react if a Networker turned up! :lol:
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Another picture grabbed off Facebook - looking in the opposite direction (towards Leicester) at Cooks Lane, Kilby Bridge -

1698446384249.png
 

380DC

Member
Joined
8 May 2023
Messages
11
Location
Derbyshire
Are the piles not intended to be vertical?
Yes, but the bolts that are attached to the piles aren't evenly spaced around the circumference, but instead have a specific pattern. So the orientation of the foundation needs to be considered dependant on the mast and structure type
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,852
Location
Northampton
Is it the case that the adaptor (short piece with flanges at each end) is only used when there's been an error in pile position? On the G.W. electrification, they seem to be common. What's the reason for some piles having a much longer length showing above ground? Is that intentional?

I can remember the Euston - Birmingham/Manchester/Liverpool electrification, and there didn't seem to be the same problems with the augur method - all the structures very tidy and even. They certainly worked quickly then, too - but probably reflecting the pay structure, though.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Yes, but the bolts that are attached to the piles aren't evenly spaced around the circumference, but instead have a specific pattern. So the orientation of the foundation needs to be considered dependant on the mast and structure type
Thanks for the explanation. It was the word "heading" that made me wonder - I thought it meant the centreline of the pile was going in the wrong direction, but now you've made it clear.
 

380DC

Member
Joined
8 May 2023
Messages
11
Location
Derbyshire
Is it the case that the adaptor (short piece with flanges at each end) is only used when there's been an error in pile position? On the G.W. electrification, they seem to be common. What's the reason for some piles having a much longer length showing above ground? Is that intentional?

I can remember the Euston - Birmingham/Manchester/Liverpool electrification, and there didn't seem to be the same problems with the augur method - all the structures very tidy and even. They certainly worked quickly then, too - but probably reflecting the pay structure, though.
That adaptor is specifically for rotating the bolt positions through 90° for the transfer plate that the mast attached to

There's a few reasons some of the piles end up high, but mainly it's due to the ground being too hard. With the 300DC type portals (the portal shown in the picture with the adaptor), there's less adjustment available so sometimes a pile may end up higher as a function of the structure type.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,852
Location
Northampton
That adaptor is specifically for rotating the bolt positions through 90° for the transfer plate that the mast attached to

There's a few reasons some of the piles end up high, but mainly it's due to the ground being too hard. With the 300DC type portals (the portal shown in the picture with the adaptor), there's less adjustment available so sometimes a pile may end up higher as a function of the structure type.

Thanks, informative.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,084
There seem to be all the masts in place around the Braybrooke Supply site, but many are still missing the cantilevers or portals (cross beams?) so there are no catenaries or wires for about 1/2 a mile.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
And another press release


Network Rail is urging passengers travelling between London and the East Midlands in November and December to check their journey before they travel as major engineering work means journeys will be disrupted on weekends throughout the months.

Lines between Leicester and Kettering will be closed to trains as Network Rail lowers sections of track and demolishes some bridges to enable overhead electric lines to be installed.

Engineering work will mean no trains will operate between the stations on Saturday 4 and Sunday 5 November, and then on subsequent Sundays for the remainder of the month.

As a result, rail replacement bus services will be in operation between Kettering, Market Harborough and Leicester which will shuttle passengers through the closed section.

East Midlands Railway’s (EMR) ‘Connect’ services will also start and terminate at Wellingborough, rather than Kettering or Corby.

The work is part of the ongoing Midland Main Line Upgrade project which is electrifying the line between London St Pancras and the East Midlands, allowing for the introduction of bi-mode trains in the future, delivering greener, faster, and smoother journeys for passengers.

Also on Saturday 4 and Sunday 5 November, 670 yards of old track will be being replaced close to Leicester, with teams adding new sleepers, ballast, and rails allowing for a smoother, more reliable journey for passengers.

Elsewhere on the Midland Main Line, work will be carried out on selected dates in November and December between Luton and Bedford to upgrade overhead line equipment which will enable the new fleet of trains to run at speeds of up to 125mph.

Until 08.05 on the mornings of Sunday 5 and 26 November and 3 December, buses will replace Thameslink services between Luton and Bedford, with a revised timetable in operation between London St Pancras and Luton.

Passengers are being encouraged to check their journey before they travel via National Rail Enquiries or their train operator.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Still some vegetation removal works needed between the ‘Down’ line (line towards Leicester) and the freight line, leading to the spur for the Nuneaton line, but piles are pretty much all in at this point.
 

jfowkes

Established Member
Joined
20 Jul 2017
Messages
1,266
From @snowball 's post above:
East Midlands Railway’s (EMR) ‘Connect’ services will also start and terminate at Wellingborough, rather than Kettering or Corby.

Is this somehow related to the OHLE works, or something else happening at the same time? Can't imagine how EMR Connect services are affected by works north of Kettering North junction...
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
From @snowball 's post above:


Is this somehow related to the OHLE works, or something else happening at the same time? Can't imagine how EMR Connect services are affected by works north of Kettering North junction...
EMR Intercity services are, I believe, making additional calls at Wellingborough, Kettering and Corby (which is crying out for a second platform). Everything northbound calling at Corby has to switch from the Down to the Up, and then back to the Down again!

Plus, everything on the Fasts at Wellingborough (the ICs) can only switch to/from the Slows at Wellingborough North or Kettering South Jns; it's impossible to reach the Corby lines from the Fasts once you pass Kettering South Jn.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,476
Interesting to see some OLE 125 works will be done during the usual overnight Sunday shutdowns; I thought we'd have to wait until the next full day/weekend closure for further progress.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
Interesting to see some OLE 125 works will be done during the usual overnight Sunday shutdowns; I thought we'd have to wait until the next full day/weekend closure for further progress.
Headspan refurbishment would have to be done over the weekend shutdowns, true enough; Balance Weight Anchor upgrades (to an anti-fall system) can be done in the standard overnight possessions.
 
Status
Not open for further replies.

Top