Marches blocked yet again by A Broken Down Freight.

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
To avoid any ambiguity, maybe we should ban any references to unofficial names for routes such as the Marches, and insist that every reference to a route is by its ELR? After all, who can definitively say what is on the Marches line and what isn't, and what is on the WCML and what isn't, and so on...

Noting also that what a particular route or feature is informally but universally known as by signalmen and other ops staff can often vary from what infrastructure staff call it, and again from what traincrew consistently call it.

Whereas we would have no clue to what the ELR was if you quoted it to us, we use the LOR numbers in the Sectional Appendix such as MD101 etc...
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Engineers' line reference (i.e. three letters, sometimes with a numeric suffix) as shown in the sectional appendix.

Which as has been said means nothing to us signallers.
We rarely look at the Sectional Appendix as we have no need to. We know our own sections and possibly a bit of the sections either side.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,206
My father worked this route as a driver for nearly twenty years; I was in the train planning office at Crewe for twenty years. Never heard it referred to as The Marches Line {isn't that a recent marketing name?}. North and West was used sometimes .....

Not sure it really matters .....
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
My father worked this route as a driver for nearly twenty years; I was in the train planning office at Crewe for twenty years. Never heard it referred to as The Marches Line {isn't that a recent marketing name?}. North and West was used sometimes .....

Not sure it really matters .....

How about 'Borders Railway' - oops, now hang on!
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Which as has been said means nothing to us signallers.
We rarely look at the Sectional Appendix as we have no need to. We know our own sections and possibly a bit of the sections either side.
Maybe not over there, but the various routes are routinely referred to, informally and formally, by their ELRs over here - most importantly when a location is being referred to by its mileage or bridge number. At one of my boxes, with a junction (and each route from the junction having a bridge 58, with a fairly regular history of strikes in each case, all within the area of control of the same box), it's by far the least ambiguous way of uniquely identifying each! Yes, I know that it's really not that important on here, but my point was that it's a bit daft arguing endlessly over what is and what isn't the Marches line, when there's no single definitive answer anyway.
 
Joined
27 Feb 2007
Messages
276
Can we have a bit of perspective here please?! Whether or not Crewe to Shrewsbury is part of the core Marches route, both freight trains which were delayed yesterday near Whitchurch were heading south from Shrewsbury, which is without doubt part of the Marches route and therefore relevant to this thread. For what it's worth, the Marches Gen group describes itself as:

the Welsh Marches Rail Route, all sightings and any information for the Welsh Marches area is welcome. Lets keep each other informed of whats going on and where its at. Areas covered include Chester, Crewe, Shrewsbury, Hereford to Newport(S.Wales) including the Central Wales and Cambrian Routes

My understanding is that, to many people, the Marches route is Chester to Newport via Wrexham. However, what happens between Shrewsbury and Crewe has such an effect on the 'proper' Marches route that it is often combined under the same heading. Is that unreasonable?
 

herschell

Member
Joined
22 Aug 2014
Messages
118
I consider Crewe to Newport the Marches also the DEV from Video 125 starts at Newport and finishes Crewe, hope that helps?
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Truth be told I think all of the freight operators who use the route have had at least 1 failure on the route so maybe Network Rail should bang some heads together.

All the freight operators who use the route should put money into the pot which can then pay for a loco & driver to be put on standby duties at say Hereford
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Today - AGAIN - the Marches is blocked.

Why is nothing being done to resolve this on-going problem? Because there clearly is one.

As has been pointed put before, as long as the Freight Companies pay Track Access charges, there's not much can be done,especially in these of fragmentation.
--- old post above --- --- new post below ---
The culprit this morning was 56087 (Colas) working 6V54 Chirk to Teigngrace Logs between Woofferton and Leominster. It would have failed at approx. 07 00 and left assisted at approx. 11 15. The assisting loco (66957) came from Stoke Gifford leaving there at 08 30.
 
Last edited:

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,331
Location
Herts
NR are allowed to "commandeer" any loco to clear the line - (for which payment is made to the relevant operator) - it is in the Network code - however 4 and a quarter hours is an incident which would have led to a serious interview with the Divisional Manager in my day ...(personally)
 

a good off

Member
Joined
2 Jul 2010
Messages
372
Location
Control Room
During the day for example 0700-2100 (2 x 7hr shifts) there is definitely a case for having a thunderbird loco stabled in the bay platform at Hereford with spare driver stabled nearby. It would pay for itself not just in reducing delay minutes but actually providing the general public with a service in the fact that the job would get moving a lot quicker!
 

Legzr1

Member
Joined
19 Mar 2010
Messages
581
NR are allowed to "commandeer" any loco to clear the line - (for which payment is made to the relevant operator) - it is in the Network code - however 4 and a quarter hours is an incident which would have led to a serious interview with the Divisional Manager in my day ...(personally)


After a couple of recent incidents I can confirm this.

Maddening as hell when the companies loco which failed on one particular occasion had LE's passing me in either direction as I was 'asked' to stable my train and go assist.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
NR are allowed to "commandeer" any loco to clear the line - (for which payment is made to the relevant operator) - it is in the Network code -
I'm not sure it's quite as simple as that, I'd like to see them commandeer the loco off the Royal Train for that purpose:)
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,331
Location
Herts
I'm not sure it's quite as simple as that, I'd like to see them commandeer the loco off the Royal Train for that purpose:)

Yes sir - as a young Operations Manager I commandeered the "Royal Train Standby loco" from a place "somewhere in East Anglia" to run a trainload of military vehicles from a port to Nottingham. (the 2 x 31 had no fuel)

It was a very clean class 47 from Stratford - the train crew had new uniforms and so on.

Course in those days we had a railway where decisions could be made - the train I ran with the 47 was a "royal train" really. On her behalf.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
During the day for example 0700-2100 (2 x 7hr shifts) there is definitely a case for having a thunderbird loco stabled in the bay platform at Hereford with spare driver stabled nearby. It would pay for itself not just in reducing delay minutes but actually providing the general public with a service in the fact that the job would get moving a lot quicker!

Yes. Good idea. Then you come to the question of who's going to pay for it.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
One of the class 60's operated by Colas failed at the Pencoed loop on Tuesday night so a class 70 was sent yesterday to recue it.

So failures can happen anywhere but as others have said it is happening all too often on the marches line
 

Pacerpilot

Member
Joined
7 Jun 2010
Messages
347
You may be interested to know that a loco and driver have been on standby at Stoke Gifford between 0900 and 1500, and again between 2200 and 0600 all last week and rostered again next week. I don't know if it's for the foreseeable future but I shall keep you informed. It was that very loco and driver that rescued 6V54 on Thursday.
 
Joined
27 Feb 2007
Messages
276
You may be interested to know that a loco and driver have been on standby at Stoke Gifford between 0900 and 1500, and again between 2200 and 0600 all last week and rostered again next week. I don't know if it's for the foreseeable future but I shall keep you informed. It was that very loco and driver that rescued 6V54 on Thursday.

Interesting, although inevitably the failure occurred outside the times at which the standby loco was available. No doubt everyone involved did what they could to clear the line, but four hours is still a long time on a fairly busy route!
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
When one wishes to take his good lady wife to Hereford from our area of Cheshire as a treat to visit the cathedral there, a reading of this thread does not exactly fill one with confidence of a trouble-free long rail journey.

I've averaged maybe 25 trips a year down the Marches the last few years and there's only the one occasion when a freight has messed things up really badly.
They tend to be in the northbound direction predominantly when they happen so you'll get to Hereford come what may. You'll have the option of escaping via Worcester if it's really bad!