I read it as the delay was too long rather than the train. Now you've said it its obvious!Whats not to understand? From where ever the train was, because of its length the rear was blocking the mainline.
Strange for it to happen at Hereford though - the loop there is one of the longer ones on the line. It's a regular enough occurrence to be unable to pass freight trains because they're too long for the other loops, but they've always been able to fit into the through lines at Hereford.
Whats not to understand? From where ever the train was, because of its length the rear was blocking the mainline.
We wouldn't have so many of these problems if we had a railway fit for the 21st Century on the North and West! A route well used by freight should have some long loops in multiple locations in both directions, and we really shouldn't still be using ancient signalling technology either!
No sign of a thorough modernisation of the route in the next few years, so we could see this sort of issue pop up for a long time yet.
According to Twitter and ATW things are back to normal now but still...
Already planning how ill use my delay repay compensation from tomorrow's trip on the Marches p![]()
Thanks!
Nice to see such heartfelt support for us signallers on this line!!![]()
I am wondering why is all this signalling in the future being centred on Cardiff,I understand it will reach far into North Wales main line.
As we are in the North why is the signalling being taken away from say Chester which is more local, no political reason for me asking this, just out of interest.
Good to hear the North and West is going to get done up to modern standards, long overdue!
I am wondering why is all this signalling in the future being centred on Cardiff,I understand it will reach far into North Wales main line.
As we are in the North why is the signalling being taken away from say Chester which is more local, no political reason for me asking this, just out of interest.
Did ATW actually advise passengers that they could get compensation? Do they tell them to keep the tickets as proof of travel - or do they lose their tickets when they are 'gobbled up' at exit gates? Are compensation forms given out?
Already planning how ill use my delay repay compensation from tomorrow's trip on the Marches p![]()
Because Notwork Rail have this big plan of running the whole country (UK) from several large Signalling Control Centres, and Cardiff is just one of them. It doesn't really matter where they are, but it does mean that lots of us are facing redundancy in the future.
Cardiff already controls the Shrewsbury - Crewe line.
--- old post above --- --- new post below ---
Thank you for your kind support (again) NOT!!
Yes progress has to happen, but it does mean that people will end up being made redundant as there is little to no chance of redeployment on the modern railway (as I well know!), and yet you seem to ignore that fact and almost revel in it.
Ah, but the key word missing there is that NR see lots of operational expenditure gains...No operational gains will be made, just as there weren't on the Crewe - Shrewsbury.
In support of Llanigraham and having worked with the line for many years, the so called ancient signalling has many more operational advantages with eyes and ears on site and people actually being located near the trains that they are signalling. The North & West line once had many loops especially on the Down but none were of particularly long length to accommodate trains of 2000ft +.
NR's latest modular signalling proposals for the line have slipped (as I always said they would early on) and are pretty much like for like replacement of the existing signalling including retaining the long sections that are currently AB. No operational gains will be made, just as there weren't on the Crewe - Shrewsbury. I concede that reversible signalling on the North & West would be of a great benefit but if they don't go for that option then they may as well just leave things as they are. Three aspect MAS (or equivilent) with evenly spaced signals is the only way forward in my opinion. Resignalling it with second rate modular will guarantee that the line will be restricted in capacity with no options for growth for another generation.
Making Hereford fully bi-di from Shelwick Jn would've got them out of the 6V51 fiasco.
Ah, but the key word missing there is that NR see lots of operational expenditure gains...
Ah, but the key word missing there is that NR see lots of operational expenditure gains...
Because Notwork Rail have this big plan of running the whole country (UK) from several large Signalling Control Centres, and Cardiff is just one of them. It doesn't really matter where they are, but it does mean that lots of us are facing redundancy in the future.
Cardiff already controls the Shrewsbury - Crewe line.
redundancy is an awful weight on everyone's mind,I have been there myself.
--- old post above --- --- new post below ---
Modern computerised signalling does not need to be controlled from local locations - it can be controlled from central locations resulting in much lower costs.
Taking Ireland for example, apart from a small number of remaining lines and locations controlled locally, the entire Iarnród Éireann network signalling is controlled from a single signalling centre at Connolly Station in Dublin.
Does Dublin Tower control the DART?,
It would take them years and years to break even if ever.
redundancy is an awful weight on everyone's mind,I have been there myself.
Modern computerised signalling does not need to be controlled from local locations - it can be controlled from central locations resulting in much lower costs.
Taking Ireland for example, apart from a small number of remaining lines and locations controlled locally, the entire Iarnród Éireann network signalling is controlled from a single signalling centre at Connolly Station in Dublin.
Does Dublin Tower control the DART?,
I'm not sure when Track Circuit Block first came on the scene, but it was certainly around 60 years ago, and since then everyone working in a manual box must have realised that many of their jobs would eventually disappear. You would have thought that in that time all signalling would have been modernised in some way, but thanks to the disjointed way in which British railway modernisation has happened, there are still areas which many people would see as working museums, and Network Rail has had to recruit new people to work in these boxes because of the lack of progress. I worked for 40 something years as a train planner, and obviously we saw the advent of new technology as a potential threat to our jobs, but fortunately for us, and unfortunately for the industry the technology did not work as well as those who promoted it were hoping.Not sure how I'm revelling in it all mind, but it would be nice to have a mainline railway in the modern day not needing to use such things as Absolute Block signalling, and having bi-di along the North and West would be immensely useful all year round, there would be a chance to have less reliance on rail replacement coaches during engineering work.
Llanigraham:2114147 said:Sorry, but your choice of words most certainly came across as you were reveling in the scrapping of AB and the Boxes on the Marches.
Saturday night is the only night that any maintenance can be done in any reasonable amount on that line, so the line often is closed, which is why I presume the bus is used. I just pull levers so wouldn't know the details.
In that case I do apologise. Clearly I should learn to post less during the interval before work, or while waiting for the bus home!
Clearly NR have faith in the boxes lasting quite some time, as they're apparently after a signaller in Hereford.
As for the reason on the block, I suppose that makes sense. Didn't know about the Manchester to Chester one, it's not a regular event across the network by the looks of it though. Is Shrewsbury to Hereford considered that badly in need of a block on Sunday mornings though?
I'd agree with this - but unfortunately the railway (like every other industry) is not immune from technological advances, and with any such changes there will be an inevitable loss of staff. It's awful for the staff involved, and I do sympathise with them.
Yes, DART is controlled from the Centralised Traffic Control (CTC) at Connolly.
CTC at Connolly controls the entire Irish railway network in the country except for:
Thanks for the information,I wonder if the new centre is still known as Dublin Tower,this was the name given to it.when I travelled a lot in Ireland.
I mention the Dart, as I happened to arrive at Dun L on the day it was launched and got free rides all afternoon, I must have caught a late morning ferry, as I will always remember a member staff at at Dun L station making a tanoy announcement, "The next Bray train is at three,and its free".
I had to quiry the message and was told it was launch day for the Dart,all trains are free for the day, enjoyed the experience.
Llanigraham:2114212 said:In that case I do apologise. Clearly I should learn to post less during the interval before work, or while waiting for the bus home!
Clearly NR have faith in the boxes lasting quite some time, as they're apparently after a signaller in Hereford.
As for the reason on the block, I suppose that makes sense. Didn't know about the Manchester to Chester one, it's not a regular event across the network by the looks of it though. Is Shrewsbury to Hereford considered that badly in need of a block on Sunday mornings though?
No problem.
Re the block;
Yes, as said previously, as that is really the only time that they can get full possession, and because of the way things are laid out it is easier to close between the 2 biggest centres than to split it up into the various signalling sections, which don't fit with the stations.
Sections:
Hereford - Moreton - Leominster - Woofferton - Bromfield - Onibury - Craven Arms - Marshbrook - Dorrington - Sutton Bridge Junc - Severn Bridge Junc.
Stations:
Hereford, Leominster, Ludlow, Craven Arms, Church Stretton.

Thanks for the information,I wonder if the new centre is still known as Dublin Tower,this was the name given to it.when I travelled a lot in Ireland.
I mention the Dart, as I happened to arrive at Dun L on the day it was launched and got free rides all afternoon, I must have caught a late morning ferry, as I will always remember a member staff at at Dun L station making a tanoy announcement, "The next Bray train is at three,and its free".
I had to quiry the message and was told it was launch day for the Dart,all trains are free for the day, enjoyed the experience.