• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Marches blocked yet again by A Broken Down Freight.

Status
Not open for further replies.

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
No excuse for that one. There were delays to the early passenger trains. It should never have started out on the journey.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Westnat

Member
Joined
23 Mar 2015
Messages
148
I don't recall saying I wanted jobs to go on the railway regarding signallers on the North and West. Quite, I've had concerns about job security lately too so I understand the redundancy worries.

Not sure how I'm revelling in it all mind, but it would be nice to have a mainline railway in the modern day not needing to use such things as Absolute Block signalling, and having bi-di along the North and West would be immensely useful all year round, there would be a chance to have less reliance on rail replacement coaches during engineering work. Newport to Shrewsbury is a fair ol' trek as it is by rail, by road it'Il be even more of an endurance! Speaking of...

Is Shrewsbury to Hereford the only route that's had a permanent replacement bus, on the first service of the day (0750 Shrewsbury to Hereford), on Sundays for several years? I don't recall a time when it hasn't been the case, so at least 10 years now. I don't know of anywhere else like it in the country!

I don't think this is a replacement bus service in the normal sense, I seem to recall that it was a subsidised bus provided by the local council to link into the first train of the day from Hereford on a Sunday.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,448
Location
A typical commuter-belt part of north-west England
I don't think this is a replacement bus service in the normal sense, I seem to recall that it was a subsidised bus provided by the local council to link into the first train of the day from Hereford on a Sunday.

With the thread matter in mind, you don't often see all that many reports of a rail-replacement bus service being disrupted by a broken-down HGV.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I don't think this is a replacement bus service in the normal sense, I seem to recall that it was a subsidised bus provided by the local council to link into the first train of the day from Hereford on a Sunday.

ATW I understand pay for it,in previous years it ran from Crewe on Sundays.

Another rail replacement run by ATW is the connection to Holyhead from Llandudno Junction,runs every Saturday around 11pm.
The Cardiff/Holyhead terminates at Llandudno Junc,due I understand to boxes been shut.
Not sure if ATW recoup any money from NR.
 
Last edited:

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
With the thread matter in mind, you don't often see all that many reports of a rail-replacement bus service being disrupted by a broken-down HGV.

You'd be surprised - quite often when rrb's are running we'll receive emails about trains being delayed awaiting the arrival of a bus held up in traffic.....
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Would agree, the length limit on the route is based on the Hereford loops which at 2163ft/659m on the down and 2310ft/704m on the up isn't too shabby. Someone was obviously a bit naughty though considering 6V51 was running at 2182ft so its butt would have hung out.
I saw this Arpley - Portbury automotive train on Tuesday morning at Temple Meads. For some reason it was routed to the up rather than the down through to wait for a path towards Parson Street, and the end of the train completely blocked Bristol East Jn, causing my train from Bristol Parkway to use the Filton Main Line from Dr Days Jn to access the station. I believe it detaches traffic for Barry at AD Jn, so it must be a real monster of a train on the Marches route. Has the FOC been asked by Network Rail at a senior level as to the risks involved with running such a train at a time when a problem could cause disruption to peak services into Cardiff?
 

trainophile

Established Member
Joined
28 Oct 2010
Messages
6,980
Location
Wherever I lay my hat
ATW Journey Check:

12:30 Manchester Piccadilly to Milford Haven due 18:31

This train has been delayed between Pyle and Port Talbot Parkway by 48 minutes, has been further delayed between Port Talbot Parkway and Swansea and is now 69 minutes late.
This train will be terminated at Haverfordwest.
This train will no longer call at Johnston and Milford Haven.
This is due to a broken down freight train.


Even on a Bank Holiday :( .
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
ATW Journey Check:

12:30 Manchester Piccadilly to Milford Haven due 18:31

This train has been delayed between Pyle and Port Talbot Parkway by 48 minutes, has been further delayed between Port Talbot Parkway and Swansea and is now 69 minutes late.
This train will be terminated at Haverfordwest.
This train will no longer call at Johnston and Milford Haven.
This is due to a broken down freight train.


Even on a Bank Holiday :( .

Not actually on the Marches but on a Marches route train.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Had one today which seems to be a Test Train 1Q20 W14 09 08 07 48 Crewe to Derby RTC via Newport and returning back up the Marches thence via Crewe. Should imagine would have been a short train and, of course, not an actual freight as such.
On return 67018 sat down at Marshbrook and eventually assisted by 2x66 on rear. 1W14 09 08 Milford Haven to Manchester delayed 115 minutes. No more details at the moment but the assist would have had to have got to the rear somehow. If more info, will post.
--- old post above --- --- new post below ---



It was a Network Rail Test Train formed 67018, 2 vehicles and DVT 82111. At Sutton Bridge the 2x66s left and 67007 appeared from somewhere ? and attached to front of 67018
 
Last edited:
Status
Not open for further replies.

Top