Manchester - Liverpool Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,914
Location
Mold, Clwyd
WOWOWOWOWOWOW? Hold up.

2018? not 2016 as originally planned?

Sorry, Dec 2016 as you say. I was looking at something called Core Stage 2 which includes the Piccadilly/Oxford Road work.
Dec 2016 assumes a start on site Nov 2014.
But the planning permission rider still applies.
 

ironstone11

Member
Joined
3 Jan 2013
Messages
217
How long will it be till they start on the chord?
The Transport & Works Act Order application was submitted to the DfT in September 2013. These can take a long time before the Order is granted.

See:-http://www.transportbriefing.co.uk/news/storyadx?id=9623

So the NR start date of the end of 2014 may be optomistic!
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Sorry, Dec 2016 as you say. I was looking at something called Core Stage 2 which includes the Piccadilly/Oxford Road work.
Dec 2016 assumes a start on site Nov 2014.
But the planning permission rider still applies.

Thank god or that ruins all the current plans for TPE !
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
TWAO's can take 18 months or more to get permission however NR have already done the statutory consultation in this instance so how fast its granted is purely dependent on how idle the Secretary of State is.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
Thatto Heath Station on the 18th December with Northern Belle headed by 47501. Note the cutting of all the trees/bushes in and around the tunnel entrance.

11487081594_9dc884d89a_z.jpg


Also noted complete masts and overhead stanchion in situ on Prescot Station along with complete cutting back of trees/bushes in Olive Mount Cutting as seen from Rathbone Rd Bridge.
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
And tomorrow, the blockade at Manchester Victoria begins.

Well, it is essential that a time had to be found for lowering the trackwork under the bridge carrying Cheetham Hill Road over the running lines in order to prepare the way for the future line electrification through Manchester Victoria railway station.
 
Last edited:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,632
Location
Rochdale
I was there today, a few supports now bolted into the roof over the lines through 3 and 4, no tracks removed at all although plenty of white paint. One yellow piece of plant on the lines. More work at the Ordsall Lane end with supports now about 35% of the way towards Salford Central.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,632
Location
Rochdale
They haven't finished building the foundations yet!

when I talked to the workers a few weeks ago they said the supports should be going up in the spring time, they are going to put the new link bridge to the arena in first, as it would be a bit difficult doing it with the roof up!
 

BantamMenace

Member
Joined
2 Dec 2013
Messages
573
Out of interest will stations such as Preston, Lancaster and Carlisle have 4car and 8car class 350 stop boards fitted/have they already been fitted?
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside

STANDISH

Member
Joined
10 Jun 2013
Messages
228
Fingers crossed no problems with the weather and wires tomorrow ,with the storm coming in tonight.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Wasnt any at Wigan a couple of days ago, the 3 car 185 TPE services were using the Voyagers 5 car stop rather than shorter stop boards.
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
A bit of information for those going to see the first run, it is a pair of 350/4 units and they left Piccadilly 5 minutes late.
 