The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,681
If you were a betting man that would be well worth a punt...
Why not extend a Euston to Piccadilly service through to Liverpool Lime Street.
I think you need a shunt to reach Edge Hill depot from the Huyton direction, or run via Lime St.
Currently there are several overnight ECS runs from Preston/Lancaster to Longsight/Edge Hill, all running via Crewe (reverse) except one which uses a 57 and runs via Ordsall Lane.
Potentially the Longsight ones could all run direct via Chat Moss, or Bolton when finished.
The Edge Hill one might have to continue via Crewe because of the shunt.
There don't appear to be any regular ECS runs between Longsight and Edge Hill.
There will inevitably be VT passenger services Liverpool-Euston via Earlestown during engineering diversions (via Manchester or Warrington).
If one ran from Preston to Edge Hill via Huyton after electrification then it would end up in reverse formation. This would probably be a real pain if for any reason it couldn't start out from Preston in the morning, as there are few places it can be reversed during the day.
Yes I'd forgotten that.
Conversely, Crewe-Earlestown-Longsight becomes a route on which you can turn Pendolinos trains if needed, without having to go to Birmingham or Glasgow.
If it ran via Golborne rather than via St Helens Central, then there is the opportunity to reverse direction on either the Lowton / Parkside / Newton le Willows junction triangle, or the Earlestown triangle before it got to Edge hill. If it then ran back to preston direct, it would be in the correct formation.If one ran from Preston to Edge Hill via Huyton after electrification then it would end up in reverse formation. This would probably be a real pain if for any reason it couldn't start out from Preston in the morning, as there are few places it can be reversed during the day.
If it ran via Golborne rather than via St Helens Central, then there is the opportunity to reverse direction on either the Lowton / Parkside / Newton le Willows junction triangle, or the Earlestown triangle before it got to Edge hill. If it then ran back to preston direct, it would be in the correct formation.
What is wrong with having First Class at the north end, surely that is better than no service?
Oh no, sorry, I forgot, it would be the end of the world if all the posh 1st classers actually had to walk anywhere at Euston....
Easily handled by a platform announcement notifying the change in formation for that service.
The new TPE electric trains appear to be out in force (I'm guessing for staff training) - I saw a couple while travelling between Oxenholme and Preston yesterday. If anyone's interested I got a couple of pictures of one at Preston, with the new gray livery.
I'm also quite curious to know what the internal furnishing in the 3rd pic and the external structure in the 4th pic are?
The fourth one looks like a filler for some kind of liquid.
No, you were closer with your first suggestion: Unless I'm very much mistaken, it'll be a catering storage cupboard.perhaps even a mini-buffet? Is the bit to the right a counter that someone can stand behind?
It's where they connect the toilet tank emptying hose. As seen on 444, 450, 350 Desiros, but they were delivered with a covering flap, many of which have been removed. I'd expect it is also present on the 185s surely?
No, you were closer with your first suggestion: Unless I'm very much mistaken, it'll be a catering storage cupboard.
Could well be. I've never looked at a 185 that closely - they don't have the novelty value
--- old post above --- --- new post below ---
I did wonder if it might be something like that - but if so, it seems surprising to me that it's out in the open right next to passenger seating.
Travelled over the Parkside-Golborne curve today for the first time, on a 185.
With the 60mph dawdle over the Moss, approach control at Parkside (conflicting with an eastbound ATW service) and the 15/20mph crawl between the two junctions, it's not what you would call an "electrifying" () ride.
Predictably there were some incredulous Bolton types on board, despite very clear announcements on the platform and on board that it would not stop at either Bolton or Chorley.
They were told to change at Wigan, but in fact they stayed on for Preston!
A 350/4 was waiting on the Up Fast at Golborne for us to pass.
I see this was on a Carnforth-Crewe test run.
There is no doubt Wigan gets a good uplift with this service.
My train was to Barrow rather than Scotland.
Must be a while since there were through trains Wigan-Barrow.
Nothing new to report on Phase 2 into Liverpool, but bases and masts continue to multiply.
Going into Manchester this morning, I noticed a fair amount of activity around Salford Central.
Would one care to elaborate on that? NR teams sizing things up for wiring? Thanks.
That'll be the speed upgrade that should have been done by this December then?