Tom B
Established Member
- Joined
- 27 Jul 2005
- Messages
- 4,681
He should be able to PM/reply to PMs now.
And you know this to be true because ????????
I bet Freighliner and probably DBS are waiting in the wings to nab the Fastline traffic, even though DBS gave up the Daw Mill flows that Fastline took over.
You really do talk crap don't you.....they have gone into administration......
As to the above question of what difference it would make, at least you would get a workforce who know how tough life is when they lose their job and are desperate to actually work to earn a living.
You really do talk crap don't you.
You have never worked for Jarvis, you know nothing about how they operated, how the treated their staff, frankly what you know could probably be written on the back of a postage stamp.
Yet you come on here with supercillious comments about a situation which affects an awful of friends and colleagues of mine.
Politeness causes me to refrain form saying any more.
If you knew even diddly squat, you would know that Jarvis had long term Contracts with Network Rail, and have been constantly assured that the work specified as available in those Contracts would be honoured.As for Jarvis, I reiterate. Badly managed, poor business model, administration, the end.
at least you would get a workforce who know how tough life is when they lose their job and are desperate to actually work to earn a living.
so you are basically advocating slave labour then, do as I say or you will be sacked! Nice.
Errrr NO. I don't know who told you that but it is wrong.Almost all of them will be rehired by rival companies to do the work that Jarvis was due to do.
Old Timers posts are the facts of how it is in the industry right now .
I say this as an EX industry employee of thirty years
The supermarkets are full of experienced railworkers stacking shelves and gathering trolleys! All Part time jobs as well!!!
Errrr NO. I don't know who told you that but it is wrong.
Network Rail have decimated the renewals workbank in totality, which means that for the past year ALL the Infrastructure Contractors have been carrying staff who have no work. The point has already been reached where considerable numbers of people have already been made redundant and many, many more have been warned that their jobs under threat.
Balfour Beatty and Babcock Rail, who are likely to take on the Jarvis work, are themselves shedding staff because of the reduced workbank they have. The extra Jarvis work just means that it will secure employment for their existing staff, with a small number of "top-up" staff coming in from Jarvis.
The view that 1100 will just TUPE over is a fallacy.
A further fallacy is that Network Rail will enagage them via TUPE. NR pay substantially lower rates, and the terms and conditions of employment are dramatically worse than Jarvis's.
If anything, NR will let them apply for jobs on the open market, but at a much lower level package than they have now. We don't hold ouit much hope however as NR favour the use of el-cheapo labourers provided by cost-cutting labour supply agencies over professional Infrastructure Contractotrs using experienced track renewals staff.
Jarvis have some very, very good people and what is being done is nothing less than a premeditated and vindictive act by an organisation which has failed at all levels.
To do what ?Its my understanding 800 are to be approached by other firms.
hate to say this guys but this has been happening in industry for some years just the same
British engineering companies are loosing out to eastern european companies and skills lost in industrial electrical, pipeline welding and now even software programers from India
All these will do the job for a much cheaper wage, sit around on site for hours on waiting time without pay, and dont want a hotel as they will kip in their car
A cynic would say NWR have made a perfect storm. Anyone not wanting their T&C changed can be replaced easily today
Errrr NO. I don't know who told you that but it is wrong.
Network Rail have decimated the renewals workbank in totality, which means that for the past year ALL the Infrastructure Contractors have been carrying staff who have no work. The point has already been reached where considerable numbers of people have already been made redundant and many, many more have been warned that their jobs under threat.
Balfour Beatty and Babcock Rail, who are likely to take on the Jarvis work, are themselves shedding staff because of the reduced workbank they have. The extra Jarvis work just means that it will secure employment for their existing staff, with a small number of "top-up" staff coming in from Jarvis.
The view that 1100 will just TUPE over is a fallacy.
A further fallacy is that Network Rail will enagage them via TUPE. NR pay substantially lower rates, and the terms and conditions of employment are dramatically worse than Jarvis's.
If anything, NR will let them apply for jobs on the open market, but at a much lower level package than they have now. We don't hold ouit much hope however as NR favour the use of el-cheapo labourers provided by cost-cutting labour supply agencies over professional Infrastructure Contractotrs using experienced track renewals staff.
Jarvis have some very, very good people and what is being done is nothing less than a premeditated and vindictive act by an organisation which has failed at all levels.
Sid you are right about the traveling i know of a certain otm company that send otm operators from the south coast to anglia london guys to the west country midland guys to the north east etc my opion and my opion only is that colas will work north of birmingham balfours south of birmingham both companys will come in line with pay and conditions then network rail will take them in house or so my crystal ball predicts.
hate to say this guys but this has been happening in industry for some years just the same
British engineering companies are loosing out to eastern european companies and skills lost in industrial electrical, pipeline welding and now even software programers from India
All these will do the job for a much cheaper wage, sit around on site for hours on waiting time without pay, and dont want a hotel as they will kip in their car
A cynic would say NWR have made a perfect storm. Anyone not wanting their T&C changed can be replaced easily today