The dead straight, 32 mile, stretch of track from Northallerton to York disagrees with you.
I disagree, it isn't dead straight. No curves tight enough to hinder 140mph running, but still not dead straight. Just saying.
The dead straight, 32 mile, stretch of track from Northallerton to York disagrees with you.
Yes, my mistake - the 135 miles is actually all south of Darlington.
That's an assumption that has some validity for the WCML, but not really the ECML south of York as HS2 provides no significant journey time improvement for the likes of Peterborough and Doncaster.I think we can safely assume that, when HS2 is up and running, the "classic" lines will be reduced to 100/110mph operation in order to increase line capacity and reduce competition.
That's an assumption that has some validity for the WCML, but not really the ECML south of York as HS2 provides no significant journey time improvement for the likes of Peterborough and Doncaster.
It's not just those two, it's all the towns and cities south of York who will find it a bitter pill to swallow that their train service is made worse because (and not even 'so that') *other* towns and cities get a better service.Unfortunately, neither Peterborough or Doncaster are important enough to justify high speed services in their own right.
It's not just those two, it's all the towns and cities south of York who will find it a bitter pill to swallow that their train service is made worse because (and not even 'so that') *other* towns and cities get a better service.
I don't deny that any of what you've written is true, but l give you the challenge of explaining why brand-new, 140mph-capable trains on a 140mph-capable railway are running *slower* as a result of someone else getting faster journey times and making it sound like a good thing.The only city south of York is Peterborough. Other places may actually find that the train service is better than now as it will be more frequent.
I don't deny that any of what you've written is true, but l give you the challenge of explaining why brand-new, 140mph-capable trains on a 140mph-capable railway are running *slower* as a result of someone else getting faster journey times and making it sound like a good thing.
Doubly so if you're proposing additional stops and stations.
Not to mention that some locations offer important interchange opportunities rather than being destinations per se.
Unfortunately, neither Peterborough or Doncaster are important enough to justify high speed services in their own right. They just happen to benefit from being on a line that goes to somewhere more important. The economic case for reducing speed will be irresistible. More track capacity, reduced maintenance cost and reduced energy usage (it costs a lot of money to go fast).
I would have thought so. They might not retain enough structural integrity to permit them to be used as passenger vehicles but parcels arent passengers.
Unfortunately, neither Peterborough or Doncaster are important enough to justify high speed services in their own right. They just happen to benefit from being on a line that goes to somewhere more important. The economic case for reducing speed will be irresistible. More track capacity, reduced maintenance cost and reduced energy usage (it costs a lot of money to go fast).
Another bit of simple maths...
140mph is 12% faster than 125mph. If you reduce the current Edinburgh-London time by 12% (which assumes that speeds are increased along the whole route) you get a journey time of 3h 52m - which is still longer than the 3h 40m that HS2 gives you.
If I'm wrong I'd appreciate a pointer to the correct information.
I mean, Peterborough, Doncaster, Newark, Retford, Grantham all behave as their area's "parkway" for the ECML, both for people driving to a major station and for people changing trains for places like Lincoln, Hull, Cleethorpes, Cambridge, Leicester etc. as well as Sheffield for people not coming from London. In that capacity I would suggest that Peterborough and Doncaster do justify those services. Now some of Doncaster and Retford's traffic will probably be taken away by "Sheffield Parkway" on HS2, but Grantham, Newark and Peterborough won't lose anything.
True. If you ignore the fact that only 135m of the 390m route is suitable for any significant speed increase.3hrs 52mins down from 4hrs 20mins. However in theory the Flying Scotsman if you assumed 10% for ease of maths should save 24 minutes. (10% of 240mins or 4hrs). A journey time of 3hrs 38 minutes. Isn't this what HS2 proposes to Edinburgh upon Stage 2B opening?
I never said it was not possible for HST sets to be used for parcels.
What I and others have said is sticking roller shutter doors 325 style or in the middle of a MK3 is a no go without major, major structural problems.
While not impossible to overcome, you would want very, very deep pockets.
The whole body side would need reskined, the number of horizontal and vertical tophat sections doubled, floor and roof reinforced etc,etc.
A MK4 would be simpler to reinforce but the opening in the side could be no wider than a window.
The existing doors could be widened with ease to a point.
And yes, I have experience in such matters![]()
Mk3s are easy to strip out, you'd just need to to have a strong floor with internal restraints in, which brings me to one possible issue which would be weight: a carriage of fully of laden Yorks would weigh more than if fully loaded with passengers, but if you subtract the lost seats I suspect the difference would be minimal, if anything.