The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,640
This appeared on various Twitter/X feeds after the Panorama programme the other night, may quell some of the "why didnt they look there" I am assuming its real even if someone has just pasted an old HS2 logo on it.
20240917_182532.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
It’s the second most populous area in the country after London? Why wouldn’t you prioritise going directly to it rather than an indirect one?
Birmingham to London principally needs extra capacity, extra speed not so much. It's the longer distances that benefit more from higher speeds, hence the mention of Manchester and Leeds. Plus, don't forget that Leeds to Manchester and Birmingham are already MUCH slower than Birmingham to London, so these routes would benefit particularly from investment and passenger growth. Why do we need to stimulate growth on the London to Birmingham route when what it really needs is just catering properly for the existing demand?
If you’re stopping at all these intermediate locations, isn’t it better to do that on the existing railway that goes through them? And take off all the expresses that current whip past onto their own dedicated line?
These intermediate stops weren't intended to be a priority, I only mentioned them in the context that if there was ever spare capacity on a new route, then why not use it. After all, HS1 wasn't designed to benefit Kent, but once it was there, an opportunity was taken to introduce the Javelin services.
 

may032

Member
Joined
17 Nov 2023
Messages
92
Location
London
It's the longer distances that benefit more from higher speeds, hence the mention of Manchester and Leeds. Plus, don't forget that Leeds to Manchester and Birmingham are already MUCH slower than Birmingham to London, so these routes would benefit particularly from investment and passenger growth.
The HSUK route doesn’t appear to provide a direct or dedicated high speed line between Manchester/Leeds and Birmingham, so HS2 is far better on this key requirement.
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,362
This appeared on various Twitter/X feeds after the Panorama programme the other night, may quell some of the "why didnt they look there" I am assuming its real even if someone has just pasted an old HS2 logo on it.
View attachment 165740
I didn't find the source of that specific image, but I did find a later report from HS2 written in early 2012 that reviewed the choice of routes between London and Birmingham:
Reading the report, two things stick out at me. The first is that routes passing through/nearby urban areas between London and Birmingham is talked about solely in terms of negative impacts; HS2 was clearly completely uninterested in the possibility of serving cities like Milton Keynes. See, for instance, this quote about the M1 route:
As with the M40 corridor, a surface alignment along the M1 route would encounter a much greater number of major population centres than the consultation route would, including in this case Hemel Hempstead, Milton Keynes and, in particular, Luton. These three locations have a combined population of over 480,000 people. This would result in unacceptable impacts on communities through major demolitions, severance and noise impacts and therefore this route would require substantial sections of tunnelling. This makes it a substantially more complicated and expensive option than the consultation route.
The second is that HS2 placed a great emphasis on speed - for all the talk of capacity, HS2 themselves considered speed extremely important./ The report claims that a reduction in speed to 186mph, despite only increasing travel time by four minutes, would result in a reduction of the BCR by 15%:
The 186mph route has a journey time that is four and a half minutes longer than the consultation route between London and Birmingham, at 53 and a half minutes as opposed to 49 minutes. This would reduce the BCR by just under 15%.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
The HSUK route doesn’t appear to provide a direct or dedicated high speed line between Manchester/Leeds and Birmingham, so HS2 is far better on this key requirement.
That's a small part of the story, HSUK was better from London to both. HS2 has failed both too.
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,017
Location
UK
  • The UK population was always divided about EU membership long before the Brexit vote in 2016
  • This was nothing to do with HS2, and yet HS2 appears to have been developed on an assumption that the UK would never get closer to Europe
I don't think either of these are true. Maybe you have to understand the obsession for Heathrow to unlock that subsequent chain of thoughts. I don't get it either, please share what you find.
It would have much better if the high speed line ran all the way to Edinburgh (even if only eventually), rather than running HS2 trains on the existing and much slower lines.
How do you reach Edinburgh without running HS2 on the slower lines, at least temporarily. Do you build the entire line at once? Even though the northern half has a poor bcr?
 

may032

Member
Joined
17 Nov 2023
Messages
92
Location
London
That's a small part of the story, HSUK was better from London to both. HS2 has failed both too.
Improving the 1.5-2hr journey time between the midlands and northern cities was a considerable benefit of any high speed network. The scheme was practically sold on the concept of northern powerhouse and rebalancing the economy away from London.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,620
Why the West Midlands?

Because it is the second largest area of economic activity in the country, and is 2/3rds the way between London and the third largest area of economic activity.

You seem to have ignored my point that if as much tunnelling had been considered for an M1 corridor route as has been done for the Chiltern route, then the "towns in the way" would have been a lot less so.

I didn’t miss it. There will be 23 miles of tunnel between Park St and Gt Missenden. A similar length of tunnel out of Euston to the M1 corridor would bring it out just south of the built up area of Luton, and short of the Chiltern Ridge there. So more tunnel required. Both for the ridge and to get under Luton / Dunstable without widespread demolition (accepting that widespread demolition there may be quite acceptable to many). And it wouldnt serve a massive area for regeneration, plus a simlle connection to another makn line and link to Europe’s busiest airport as a by product.


I have heard the opposite claim, e.g. this from Alon Levy:

I hadnt seen that. I based my thoughts on what i read at the time, which was the official SNCF position.


I think you overestimate the time penalty a stop on a HSR service has.

typically 7 mins from 300kph. 8 from 350.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
I don't think either of these are true. Maybe you have to understand the obsession for Heathrow to unlock that subsequent chain of thoughts. I don't get it either, please share what you find.
You don't think that the UK has always been divided about EU membership? You mean you believe that the UK was united about EU membership at some point? Care to explain?
Could you also explain a bit more about the Heathrow obsession? You seem to be suggesting that it should be obvious ...
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,017
Location
UK
There’s a Brexit thread for the first part. I don’t know the answer for the Heathrow question, I want to know what you find.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
Because it is the second largest area of economic activity in the country, and is 2/3rds the way between London and the third largest area of economic activity.
I thought I'd answered that? London to Birmingham needed capacity improvement and HSUK benefitted Birmingham with additional capacity, but the high speeds were just a by-product of the new line.
High speeds per-se are more beneficial on the longer routes, from London to Manchester/Leeds and hopefully further north later on. Meanwhile, any speed improvements would have been beneficial Leeds to Manchester and Leeds to Birmingham.
HS2 should really not have been focussing primarily on London to Birmingham.

== Doublepost prevention - post automatically merged: ==

There’s a Brexit thread for the first part. I don’t know the answer for the Heathrow question, I want to know what you find.
I don't know why Heathrow was so paramount to HS2, That's why I keep asking.
 
Last edited:

Grimsby town

Member
Joined
4 Apr 2011
Messages
852
These intermediate stops weren't intended to be a priority, I only mentioned them in the context that if there was ever spare capacity on a new route, then why not use it. After all, HS1 wasn't designed to benefit Kent, but once it was there, an opportunity was taken to introduce the Javelin seservices.
What's the point in introducing Javelin services to places like Milton Keynes? They're not going to improve the journey time much because of the short distance. There won't be much need for capacity to Milton Keynes because HSR line frees up capacity on WCML. It makes far more sense to use an additonal capacity serving more destinations in the north to maximise journey benefits and released capacity on existing lines. Kent is really a special case because there's nowhere else to go on HS1 unless you go into France and that is limited by passport and security restrictions.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,620
I thought I'd answered that? London to Birmingham needed capacity improvement and HSUK benefitted Birmingham with additional capacity, but the high speeds were just a by-product of the new line.
High speeds per-se are more beneficial on the longer routes, from London to Manchester/Leeds and hopefully further north later on. Meanwhile, any speed improvements would have been beneficial Leeds to Manchester and Leeds to Birmingham.
HS2 should really not have been focussing primarily on London to Birmingham.

But this is flawed logic.

We need more capacity London - W Mids - Manchester. The easiest way is to build a new line (given that the WCML upgrade did all the available cpacity upgrades on the existing, without building more line). If you are building a new line, it may as well be fast. Ergo, fast line London - W Mids - Manchester. It’s really simple.


I don't know why Heathrow was so paramount to HS2, That's why I keep asking.

You keep asking, but evidently not listening. Heathrow was not ’paramount’ to HS2, it was a by product. Then when the more detailed studies were done, it was dropped. If it was ‘paramount’ HS2 woudl serve Heathrow. It doesn’t.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
You keep asking, but evidently not listening. Heathrow was not ’paramount’ to HS2, it was a by product. Then when the more detailed studies were done, it was dropped. If it was ‘paramount’ HS2 woudl serve Heathrow. It doesn't.
HS2 needed political support, and at the time that it was developed (following the 2006 Eddington report), who better to enlist than Boris (and others close to him). He was charismatic, he was the aspiring London Mayor and was really going places at the time. But add to this, he was closely linked to the Heathrow area (later becoming the MP and indeed the PM of course, representing Uxbridge), and he was very keen for Heathrow not to have a third runway. So if HS2 could offer a nearby alternative transport hub taking the pressure off Heathrow, then this was a fabulous selling point for it. Later, when Heathrow was assessed more thoroughly, it was dropped as you say. But by then, the Chiltern route had already had so much commitment that it would be too politically embarrassing to change it. For this reason, maybe, just maybe the studies which later dismissed other routes had an unwritten agenda not to upset the applecart on this, and underline that the Chiltern route really was the best option, but these studies were years afterwards, when they should have been done at the outset.
Ah well, those invested in the Chiltern route will never acknowledge this, it might be embarrassing . But just maybe this is where the truth is hidden ...
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,017
Location
UK
Johnson was MP for Henley from 2001 to 2008. He was a big promoter of closing Heathrow in favour of a new airport on-ish the Isle of Sheppey.

The decision to keep the Chiltern route might not have been politically embarrassing, but if you think of it as an unacknowledged hidden secret that's hard to disprove.

On the map at the top of this page, no routes east of Milton Keynes lasted beyond the first cull. Does that fit into the timeline?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,327
Location
Nottingham
On the map at the top of this page, no routes east of Milton Keynes lasted beyond the first cull. Does that fit into the timeline?

That map appears in
High Speed Rail: London to the West Midlands and Beyond (2009)
A Report to Government by High Speed Two Limited PART 5 of 11


It's also in HS2 railway, UK: route optioneering in the HS2 Learning Legacy archive

which may be of interest to some.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
That map appears in
High Speed Rail: London to the West Midlands and Beyond (2009)
A Report to Government by High Speed Two Limited PART 5 of 11


It's also in HS2 railway, UK: route optioneering in the HS2 Learning Legacy archive

which may be of interest to some.
Yes, interesting and thanks for posting, but I always wondered where were the route optioneering maps that showed London to Leeds, with Birmingham and Manchester running off the main route (not unlike the HSUK routeing). They would of course be served, but without Birmingham dominating the entire project.
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,428
I always wondered where were the route optioneering maps that showed London to Leeds, with Birmingham and Manchester running off the main route
Why do you think they would exist? As has been pointed out many times to you, it was the need for more capacity on the London-Birmingham route that created the entire project. HS2 - formed to find a suitable route between London and the West Midlands - would hardly have been doing their job if they suddenly decided "actually, we're going to Leeds! - here's some options for that instead".
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,327
Location
Nottingham
Yes, interesting and thanks for posting, but I always wondered where were the route optioneering maps that showed London to Leeds, with Birmingham and Manchester running off the main route (not unlike the HSUK routeing). They would of course be served, but without Birmingham dominating the entire project.
The original brief for HS2 was to design a high speed line from London to the West Midlands, with consideration of access to Heathrow Airport, with recommendations on later extensions. Birmingham was baked in from the start.

The brief was emphatically not what it should have been - something like "design a rail network fit for the twenty-first century, including high-speed running where appropriate, with a phased implementation starting with London to the West Midlands".
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,233
That map appears in
High Speed Rail: London to the West Midlands and Beyond (2009)
A Report to Government by High Speed Two Limited PART 5 of 11


It's also in HS2 railway, UK: route optioneering in the HS2 Learning Legacy archive

which may be of interest to some.
Thanks for the links. I wish I’d seen your post before spending half an hour finding other similar examples of that diagram… :'(
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,831
Why do you think they would exist? As has been pointed out many times to you, it was the need for more capacity on the London-Birmingham route that created the entire project. HS2 - formed to find a suitable route between London and the West Midlands - would hardly have been doing their job if they suddenly decided "actually, we're going to Leeds! - here's some options for that instead".
There were several reports in the lead-up to HS2, but the OP doesn't seem to be able to do their own research and find this. Unfortunately some of it seems to be buried in the National Archives where it would cost money to extract, but with a few minutes searching I found the following:
https://webarchive.nationalarchives....uk/pgr/rail/pi/highspeedtwo/highspeedtwo.pdf is essentially the initial proposal for needing HS2, which includes on page 16:
35. The West Coast main line carries heavy commuter and freight loads –
40% of all freight trains in the country use the line at some stage on their
journey. It is also exceptional in that even in off-peak periods it handles nine
inter-city express trains per hour in each direction. This compares with five per
hour between London and Peterborough on the East Coast main line.
36. Unlike the East Coast main line, apart from the planned introduction of
longer trains and in-cab signalling there are no significant capacity
enhancements to the West Coast route possible without incurring major
disruption to passengers and freight services. While it might be possible to
provide extra tracks alongside the existing route, the complexity and cost of
construction on a ‘live’ railway would be considerable; and, in any case, parts
of the existing Victorian route are tortuous and unsuitable for high-speed
running. Whilst Network Rail’s work is due to conclude shortly, initial
conclusions suggest it would be possible to provide significant additional
capacity, while minimising disruption, by developing a new rail line on an
alternative alignment between London and the West Midlands.
37. Accordingly, we have identified the corridor between London and the
West Midlands as the first stage of any new rail line between London and
Scotland.
So the East Coast was clearly considered.

https://stophs2.org/wp-content/uploads/2013/01/Because-Transport-Matters.pdf is an Atkins report on high speed rail, mostly acting as an update to a previous 2003 review performed for the SRA. It references various previous reports which I haven't been able to find from a quick search.
Government is understandably taking a more
cautious position. Following Sir Rod Eddington’s
report it has produced a number of sensible
proposals for increasing the capacity of the
existing conventional network over the next ten
years or so before looking at any new lines.
In the light of all this, Atkins has undertaken
some research of its own to update the business
case for a North - South high speed line, building
on the work we undertook for the Strategic Rail
Authority (SRA) between 2001 and 2003, and
more recently in support of the Eddington study.
I would draw attention to page 16 which has maps of various options, including one that goes London-Peterborough-Nottingham-Leeds. Page 18 also has forecast passenger increases, with the WCML showing the highest percentage increase.

Ultimately I agree, by the time HS2 were appointed, there had been 5-10 years of studies and reports which had led to the decision that London-Birmingham was where to start.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,620
The brief was emphatically not what it should have been - something like "design a rail network fit for the twenty-first century, including high-speed running where appropriate, with a phased implementation starting with London to the West Midlands".

I disagree. The brief was to resolve an anticipated problem (lack of capacity at the south end of the WCML). It was not to be an exercise in crayoning with no chance of being realised.
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,362
That map appears in
High Speed Rail: London to the West Midlands and Beyond (2009)
A Report to Government by High Speed Two Limited PART 5 of 11


It's also in HS2 railway, UK: route optioneering in the HS2 Learning Legacy archive

which may be of interest to some.
The first section of the first report, on intermediate stations, is very interesting - it ignores the heavy presence of intermediate stations on the first HSR network, the Shinkansen, and demonstrates just how much HS2 was designed as a complete network with Phase 1 not intended to stand on its own. Perhaps things would have been better if Phase 1 was designed to make sense on its own.
 

Transilien

Member
Joined
10 Mar 2024
Messages
728
Location
Ayrshire
The first section of the first report, on intermediate stations, is very interesting - it ignores the heavy presence of intermediate stations on the first HSR network, the Shinkansen, and demonstrates just how much HS2 was designed as a complete network with Phase 1 not intended to stand on its own. Perhaps things would have been better if Phase 1 was designed to make sense on its own.
It’s probably one of the main reasons so much of it was cancelled. The phased approach is problematic for getting something completed. In my opinion phase 1 should have been London to Manchester and the Goldbourne link. The eastern leg could have been designated phase 2 or even HS3 rather then having an over ambitious project that was an easy target for cancellation. HS2 was designed to be a complete network crossing the country not a 100 mile long white elephant that can’t even properly release capacity on the WCML.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
Why do you think they would exist? As has been pointed out many times to you, it was the need for more capacity on the London-Birmingham route that created the entire project. HS2 - formed to find a suitable route between London and the West Midlands - would hardly have been doing their job if they suddenly decided "actually, we're going to Leeds! - here's some options for that instead".
You (and others) have indeed pointed out things about HS2 many times, but have you given ANY thought to the points I’m making? As I’ve said previously, high speed routes work best for longer distances, London to Birmingham was primarily about capacity, with high speed being a by-product.

There is a trap here which many people have fallen into (even Eddington), ie the compromise approach. Were we really right to just blindly follow a belief that a new scheme had to start with London to the West Midlands?

A properly conceived new railway would have focussed on time savings between London and Sheffield / Manchester / Liverpool / Leeds / Newcastle / Scotland. It would ALSO have provided additional capacity between London and Birmingham, as well as improving journey times on this shorter route. Phase One should have been London to Sheffield, to (first and foremost) show commitment to the North and that primary objective of rebalancing the UK economy. Phase Two would then have been onward to Manchester and Leeds.

But the short-sighted approach of running the whole thing via (outer) Birmingham is what led to a mistaken belief (in the early stages) that Heathrow was so important, then all of the Chiltern route problems, and the debacle that exists now. Running a new railway from London to Birmingham does NOT rebalance the UK economy.

People (before HSUK existed) were saying that a route not unlike the HSUK route, was what was needed (see the HSUK map as an aide memoire). In case I need to spell this out, this HSUK map is just to show the basics, I've never disagreed that HSUK was highly optimistic, and I'm only asking for focus on London to the Liverpool/Leeds section here. However, the principles for this part of their project were far better than HS2. This would have provided a London to Birmingham service in marginally over an hour (the additional savings provided by HS2 for this bit are just not worth much) with London to Manchester or Leeds (both via Sheffield) in around 80 minutes each. All of this would have freed up the much needed capacity on the WCML. And look at the excellent links between between Liverpool / Manchester / Sheffield / Leeds.

Birmingham to Sheffield / Leeds would also have had direct benefit, Birmingham to Manchester is the only part that would have needed to be looked at separately, it is only part that is significantly less well off than with HS2, but then HS2 abandoned Manchester anyway.

It's all just a theoretical exercise now of course, but it’s still interesting, and the way we think is still worth discussing, for the sake of the future. My main concern is that so many people just don't get that HS2 was a compromised approach from the outset. Successive UK Governments have always been scared of thinking properly about Transport, as was so well observed by the comedy "Yes Minister" right back in the early 1980s. I could go on, but that's enough for now. Happy to listen to responses as always, but please do give a bit of thought to this, rather than just automatically defaulting to a contrary position!
 

Attachments

  • K01 HSUK system map.pdf
    425.5 KB · Views: 22

may032

Member
Joined
17 Nov 2023
Messages
92
Location
London
You (and others) have indeed pointed out things about HS2 many times, but have you given ANY thought to the points I’m making? As I’ve said previously, high speed routes work best for longer distances, London to Birmingham was primarily about capacity, with high speed being a by-product.

There is a trap here which many people have fallen into (even Eddington), ie the compromise approach. Were we really right to just blindly follow a belief that a new scheme had to start with London to the West Midlands?

A properly conceived new railway would have focussed on time savings between London and Sheffield / Manchester / Liverpool / Leeds / Newcastle / Scotland. It would ALSO have provided additional capacity between London and Birmingham, as well as improving journey times on this shorter route. Phase One should have been London to Sheffield, to (first and foremost) show commitment to the North and that primary objective of rebalancing the UK economy. Phase Two would then have been onward to Manchester and Leeds.

But the short-sighted approach of running the whole thing via (outer) Birmingham is what led to a mistaken belief (in the early stages) that Heathrow was so important, then all of the Chiltern route problems, and the debacle that exists now. Running a new railway from London to Birmingham does NOT rebalance the UK economy.

People (before HSUK existed) were saying that a route not unlike the HSUK route, was what was needed (see the HSUK map as an aide memoire). In case I need to spell this out, this HSUK map is just to show the basics, I've never disagreed that HSUK was highly optimistic, and I'm only asking for focus on London to the Liverpool/Leeds section here. However, the principles for this part of their project were far better than HS2. This would have provided a London to Birmingham service in marginally over an hour (the additional savings provided by HS2 for this bit are just not worth much) with London to Manchester or Leeds (both via Sheffield) in around 80 minutes each. All of this would have freed up the much needed capacity on the WCML. And look at the excellent links between between Liverpool / Manchester / Sheffield / Leeds.

Birmingham to Sheffield / Leeds would also have had direct benefit, Birmingham to Manchester is the only part that would have needed to be looked at separately, it is only part that is significantly less well off than with HS2, but then HS2 abandoned Manchester anyway.

It's all just a theoretical exercise now of course, but it’s still interesting, and the way we think is still worth discussing, for the sake of the future. My main concern is that so many people just don't get that HS2 was a compromised approach from the outset. Successive UK Governments have always been scared of thinking properly about Transport, as was so well observed by the comedy "Yes Minister" right back in the early 1980s. I could go on, but that's enough for now. Happy to listen to responses as always, but please do give a bit of thought to this, rather than just automatically defaulting to a contrary position!
I understand the appeal of the HSUK route, especially given the position we've found ourselves in now with HS2 ending up as just Phase 1, but it is important to remember what HS2 was meant to be. However, I am struck by the lack of consideration for Birmingham, the second largest UK city, in the HSUK plans. Given you're kind of going that way anyway, to intentionally skip such a large conurbation as the West Midlands, seems careless. And this is all ignoring the elephant in the room that the original specification was for capacity relief of London-Birmingham.

Maybe it's a ideal vs practical thing, if the spec had been to design a High Speed UK Network in full, with a specific focus on connecting the northern cities together and with London, then the HSUK route may be the better initial concept. But if the requirement is capacity relief on the UK network, then ignoring the most capacity constrained part of the intercity network in the WCML really doesn't make sense. HS2 (as originally planned) would have relieved the WCML, MML and ECML. It was an excellent design for capacity relief.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
I understand the appeal of the HSUK route, especially given the position we've found ourselves in now with HS2 ending up as just Phase 1, but it is important to remember what HS2 was meant to be. However, I am struck by the lack of consideration for Birmingham, the second largest UK city, in the HSUK plans. Given you're kind of going that way anyway, to intentionally skip such a large conurbation as the West Midlands, seems careless. And this is all ignoring the elephant in the room that the original specification was for capacity relief of London-Birmingham.

Maybe it's a ideal vs practical thing, if the spec had been to design a High Speed UK Network in full, with a specific focus on connecting the northern cities together and with London, then the HSUK route may be the better initial concept. But if the requirement is capacity relief on the UK network, then ignoring the most capacity constrained part of the intercity network in the WCML really doesn't make sense. HS2 (as originally planned) would have relieved the WCML, MML and ECML. It was an excellent design for capacity relief.
Perhaps you should re-read my post, which included comment that capacity relief on the WCML would have been provided as part of the scheme I was suggesting. I also commented that Birmingham would have benefitted from faster trains, just a few minutes slower than with HS2. I wasn't ignoring Birmingham, and I don't really think that HSUK was either. But one thing is for sure, Sunak certainly WAS ignoring just about everywhere else.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,024
You (and others) have indeed pointed out things about HS2 many times, but have you given ANY thought to the points I’m making? As I’ve said previously, high speed routes work best for longer distances, London to Birmingham was primarily about capacity, with high speed being a by-product.

There is a trap here which many people have fallen into (even Eddington), ie the compromise approach. Were we really right to just blindly follow a belief that a new scheme had to start with London to the West Midlands?

A properly conceived new railway would have focussed on time savings between London and Sheffield / Manchester / Liverpool / Leeds / Newcastle / Scotland. It would ALSO have provided additional capacity between London and Birmingham, as well as improving journey times on this shorter route. Phase One should have been London to Sheffield, to (first and foremost) show commitment to the North and that primary objective of rebalancing the UK economy. Phase Two would then have been onward to Manchester and Leeds.

But the short-sighted approach of running the whole thing via (outer) Birmingham is what led to a mistaken belief (in the early stages) that Heathrow was so important, then all of the Chiltern route problems, and the debacle that exists now. Running a new railway from London to Birmingham does NOT rebalance the UK economy.

People (before HSUK existed) were saying that a route not unlike the HSUK route, was what was needed (see the HSUK map as an aide memoire). In case I need to spell this out, this HSUK map is just to show the basics, I've never disagreed that HSUK was highly optimistic, and I'm only asking for focus on London to the Liverpool/Leeds section here. However, the principles for this part of their project were far better than HS2. This would have provided a London to Birmingham service in marginally over an hour (the additional savings provided by HS2 for this bit are just not worth much) with London to Manchester or Leeds (both via Sheffield) in around 80 minutes each. All of this would have freed up the much needed capacity on the WCML. And look at the excellent links between between Liverpool / Manchester / Sheffield / Leeds.

Birmingham to Sheffield / Leeds would also have had direct benefit, Birmingham to Manchester is the only part that would have needed to be looked at separately, it is only part that is significantly less well off than with HS2, but then HS2 abandoned Manchester anyway.

It's all just a theoretical exercise now of course, but it’s still interesting, and the way we think is still worth discussing, for the sake of the future. My main concern is that so many people just don't get that HS2 was a compromised approach from the outset. Successive UK Governments have always been scared of thinking properly about Transport, as was so well observed by the comedy "Yes Minister" right back in the early 1980s. I could go on, but that's enough for now. Happy to listen to responses as always, but please do give a bit of thought to this, rather than just automatically defaulting to a contrary position!

By bypassing Birmingham, how would it provide new capacity?

One of the things about HS2 was that by providing 400m platforms (the ideal would have been closer to New Street, but being needy to Moor Street Station it does give some better onwards connections and some which would be no worse) it frees up capacity at New Street which can then be used by other services, or at the very least allow existing services to be longer.

That's before you consider the best doubling of seating capacity the HS2 trains were due to have at 400m long.

HSUK don't appear (at least not easily to find) to define what trains lengths would run, and so it's unlikely that they would be proposing 400m platforms at existing stations (as doing so would likely blow their budget).

Therefore, building a line to Sheffield is only going to get you half what you need and you'll need to, at the very least, build or extend platforms to allow longer trains in Birmingham.

As such, unless there's something which I've missed (and I'll be happy for someone to point out what I've missed so I can be better informed about the HSUK proposal) it looks like Birmingham isn't likely to see the capacity increases that HS2 is likely to deliver.

One thing which is potentially a negative for HS2 is that it's not been able to give some working examples of other services/draft future timetable which could exist in the future for non HS2 services. As such, it could well be that the released capacity could be quite useful.

I understand why this hasn't been done, as you don't want to say X will get 3tph when 15 years later it would be better for Y to have those services as demographics have changed.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
By bypassing Birmingham, how would it provide new capacity?
WCML has 3tph from London to Manchester, plus one to Liverpool for a start, which could all use the new route thus freeing up 4 paths per hour on the existing WCML.

The new route also runs two-thirds of the way from London to Birmingham, so this trip would already benefit from time savings. What additional capacity does Birmingham really need, given that 3tph have already run between London and Birmingham for many years? (express that is, in addition to 2 via Northampton plus 2 to Birmingham from Marylebone).
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,024
WCML has 3tph from London to Manchester, plus one to Liverpool for a start, which could all use the new route thus freeing up 4 paths per hour on the existing WCML.

Most of those don't go through Birmingham, so wouldn't benefit it.

The new route also runs two-thirds of the way from London to Birmingham, so this trip would already benefit from time savings. What additional capacity does Birmingham really need, given that 3tph have already run between London and Birmingham for many years? (express that is, in addition to 2 via Northampton plus 2 to Birmingham from Marylebone).

So we're running new express services via HSUK, so (unlike HS2) you then you need to find extra paths for the Avanti services which call at Watford, that or miss that stop out.

Then of course there's the services with Milton Keynes stops (which are most of the Birmingham services) which would likely reduce the length of the HSUK line they could run on. That or you need to find more paths into New Street.

Also, I'm not sure how much extra capacity (say) an allowance of 2.5% growth year on year would need to provide, as running 12 coach 80x trains isn't going to cut it.

30 years of growth of 2.5% means that for every 100 passengers in 2009 we need to carter for 210 passengers in 2039.

Whilst we are currently below the target for 2023 for London /West Midlands regional rail travel(should have been 141 but was 123), if we ever get close to pre COVID passenger numbers we'd be at 170 passenger (so as long as that's before 2031 we'd be in track again).

Also if you look at the data for Avanti for the year to March 24 it's up 23% compared to the March 23 data (which was the last quarter of the 23 Regional data), if that's the case across the year for the regional data, rather than being behind the predicted value it'll be ahead as the prediction would be 145 and the flow would be 151.

As such not only works the network be carrying 50% more passengers than in 2009, but it would be in track to be carrying 110% more passengers in 2039 than 2009.

Even if we're off by a bit, it'll still be about sickle what it was in 2009. As I said 12 coach 80x's aren't going to cut it, and even that's more than HSUK appear to be thinking of providing.
 