There's zero chance this government would cancel the eastern leg (as exists in the current plans) as the Tories would be decimated across the East Midlands
But the north-eastern arm to Leeds (probably also Church Fenton?) and the Golborne link are both continuing to be safeguarded until something is decided to replace them. Will probably be for many years, especially the NE arm.Planning blight I would imagine. If the route is announced and safeguarded the planning blight continues until it is cancelled or built. As HSTEd has just written, by cancelling it now there is a political benefit of keeping the people happy who don't want the building work to happen.
It's already got beyond Birmingham. It's fully under construction to Handsacre, 20 miles north of Birmingham. The Act to take it to Crewe was passed in Feb 2021 and advance works are in progress.Its a disappointing view to hold, but I dont think its ever going beyond Birmingham, and worse still, i genuinely think that was the plan all along.
Given the advancing headwinds, that appears to be an inevitability.
Its a disappointing view to hold, but I dont think its ever going beyond Birmingham, and worse still, i genuinely think that was the plan all along.
Given the advancing headwinds, that appears to be an inevitability.
It's already got beyond Birmingham. It's fully under construction to Handsacre, 20 miles north of Birmingham.
Yes, between Lichfield and Rugeley.Is that the Trent Valley connection for Phase 1 that allows full relief of the south WCML?
Yes, between Lichfield and Rugeley.
If they're about to drop phase 2a, why have they just reaffirmed their intention to introduce a Bill for phase 2b?
I agree.Its a disappointing view to hold, but I dont think its ever going beyond Birmingham, and worse still, i genuinely think that was the plan all along.
Given the advancing headwinds, that appears to be an inevitability.
That's only a stated intention. It might not happen... however it might impress electorate in the meantime. A complex bill taking up lots of parliamentary time might actually be a godsend if it distracts from other issues. Scrapping it and downsizing other projects will be easy. All they have to do is do a full economic review in the light of covid, wfh, and Ukraine on nations finances and bingo!If they're about to drop phase 2a, why have they just reaffirmed their intention to introduce a Bill for phase 2b?
This won’t be Johnson’s decision to make soon enough.Q: How do you know Boris Johnson is lying?
A: Because his mouth is moving.
I believe things when I see them actually happen at the moment.
particularly at the London end of phase 1 have meant that work north of Birmingham will be poverty spec or cancelled.
Its a disappointing view to hold, but I dont think its ever going beyond Birmingham, and worse still, i genuinely think that was the plan all along.
Given the advancing headwinds, that appears to be an inevitability.
Has work actually started on Curzon Street station? If so, and phase 2b was cancelled in full, can anyone explain what the benefit of Curzon Street will actually be anymore? It’ll just be the station you go to if you want a train to London, but nothing connecting it there. At least with a 9 tph timetable, the fact that it served the majority of the country somewhat mitigates its poor connectivity within Birmingham.
Don't give the Treasury ideas...Cancel phase 2a and you end up with a massively diminshed case for Crewe renodelling. Would probably revert to like for like.
Has work actually started on Curzon Street station? If so, and phase 2b was cancelled in full, can anyone explain what the benefit of Curzon Street will actually be anymore?
So it would just serve 3 tph to London with nothing else. What a waste that would be. I maintain, that Birmingham needs phase 2b to be completed.The biggest benefit of Curzon St is that it enables 400m long services!
If Phase 2a is completed you could also put Manchester-bound crowdbuster trains into it.So it would just serve 3 tph to London with nothing else. What a waste that would be. I maintain, that Birmingham needs phase 2b to be completed.
You can’t because there is no capacity to run Birmingham-Manchester services from Crewe to Manchester via Wilmslow.If Phase 2a is completed you could also put Manchester-bound crowdbuster trains into it.
Extend the Crewe-Manchester stopping service to Birmingham over HS2.
You can’t because there is no capacity to run Birmingham-Manchester services from Crewe to Manchester via Wilmslow.
If people were determined to find a way of running Birmingham Manchester via HS2, something would get moved to allow it between Crewe and Wilmslow.You can’t because there is no capacity to run Birmingham-Manchester services from Crewe to Manchester via Wilmslow.
Isn't there the Crewe-Manchester via Styal stopping service that you could extend to Birmingham?
Even with the slow slog through south manchester it is likely to be competitive with the classic service.
What service would you take out? Who loses?If people were determined to find a way of running Birmingham Manchester via HS2, something would get moved to allow it between Crewe and Wilmslow.
No idea, but someone would.What service would you take out? Who loses?
So the plan would be to mix a stopping service with HS2, or remove the stopping serve entirely? That particular stopping service takes roughly 75 minutes to get to Crewe from Piccadilly (and it originates from Liverpool), using a 3-car 323! The classic service takes 90 minutes Manchester to Birmingham.
No idea, but someone would.
Like 395 services on southeastern, it would run as a stopping service as far as crewe, then run fast to Birmingham.
Also I got the service mixed up - but there is also a Manchester-Crewe stopping service via Stockport that currently terminates at Crewe and takes ~50 minutes that can be extended to Birmingham.
Also doesn't particularly matter what stock uses it now, it could be run by classic compatibles with SDO.
Hs2 has to be integrated anyway or it doesnt work. What do you think is going to happen when phase 1 opens?In a nutshell, it’s a non-starter. There wouldn’t be any significant gains and it would involve complete integration of HS2 with the existing network. The funny thing is that HS2 is intended to increase capacity, which is true in the south but removing capacity in the north.
Is there anything published which gives the full details of the proposed remodelling of Crewe, assuming HS2 goes through to Manchester but Golborne link is abandoned?Cancel phase 2a and you end up with a massively diminshed case for Crewe renodelling. Would probably revert to like for like.
I can never find stuff with the search function, but Im sure there is a youtube of a presentation to the PWI by the Crewe team. Not sure if the Crewe North spaghetti junction is on it though.Is there anything published which gives the full details of the proposed remodelling of Crewe, assuming HS2 goes through to Manchester but Golborne link is abandoned?
I've been searching but can't find anything yet.
Thanks in advance.
I think this is the presentation you mean. I haven’t watched it through so won’t attempt a summary:I can never find stuff with the search function, but Im sure there is a youtube of a presentation to the PWI by the Crewe team. Not sure if the Crewe North spaghetti junction is on it though.
Phase 1 and 2a are temporary solutions while 2b is built. I do acknowledge that there will be services to Liverpool and Scotland that use the existing network, but they will be a small proportion of the whole. Based on trend, the HS2 east and NPR projects are nothing but pipe dreams.Hs2 has to be integrated anyway or it doesnt work. What do you think is going to happen when phase 1 opens?