Construction of the roof was supposed to start in autumn, anyone know if it has commenced yet?
Construction of the roof was supposed to start in autumn, anyone know if it has commenced yet?
Which version of the programme was this?Construction of the roof was supposed to start in autumn, anyone know if it has commenced yet?
Agreed, seemed in a similar state to me. Unless we’re talking about the underground roof of the box as opposed to the GWML station/platform roofs?Unlikely. The last time I have passed the area (2-3 weeks ago) they were far from the stage where roof construction could start.
This document might help with work and timelinesConstruction of the roof was supposed to start in autumn, anyone know if it has commenced yet?
Construction of the roof was supposed to start in autumn, anyone know if it has commenced yet?
This video actually mentions the crane that's been brought in to lift the roof into place. So I think it is actually "on schedule", just that maybe the walls are considered part of the roof structure? I reckon in about 6 months time we'll be able to see proper walls and roofs from the GWML.
He did mention the "Y" columns supporting the roof of the GWML station as being built now. That's a simpler design of roof than the fancy HS2/upper deck one. I think I saw some of straight columns for that roof underway in the video or perhaps somewhere else. So if you think columns counts as roof, they have started it.This video actually mentions the crane that's been brought in to lift the roof into place. So I think it is actually "on schedule", just that maybe the walls are considered part of the roof structure? I reckon in about 6 months time we'll be able to see proper walls and roofs from the GWML.

He did mention the "Y" columns supporting the roof of the GWML station as being built now. That's a simpler design of roof than the fancy HS2/upper deck one. I think I saw some of straight columns for that roof underway in the video or perhaps somewhere else. So if you think columns counts as roof, they have started it.
Roofing over the some of the HS2 station box opening is much more likely to be happen first.I think I heard they will start those columns "soon", basically next year.
Unless I misheard something...
There is evidence of the new trackbed to the new surface platforms (but no new bridge to carry tracks over Old Oak lane yet) at western end of site too.
It would be bit earlier than that, would want all the tracks laid through the first five platforms a few weeks before, and ready for the connection to slewed track.There is surprisingly little progress regarding both bridges, the one over Old Oak Common Lane and the one over Central Line. I guess they have a year to build them, the big blockade to slew the tracks is next Xmas if I remember correctly.
The plans I understand it is to use tracks 2-5 (numbered from the north) as the temporary realignment with leaves the turnback sidings and track 1 the only through track to the north to do easily later. (The position of the new OHLE masts and bases in the video align with this being the case)It would be bit earlier than that, would want all the tracks laid through the first five platforms a few weeks before, and ready for the connection to slewed track.
There are obviously long lead junctions in there too, although initially would expect these to be clipped to be used as plain line.
The fifth track won't actually be connected initially, but because the new surface station is 4 islands, the 5th track (from the north) would be adjacent to a running line if first two islands get trains diverted through them, so better to install it whilst that area isn't live railway. Can then work on other side of third island and fourth island once trains diverted through the first two island platforms (even if nothing actually stops)
At least there is a reasonable number of people in that part of the site in the video.There is surprisingly little progress regarding both bridges, the one over Old Oak Common Lane and the one over Central Line. I guess they have a year to build them, the big blockade to slew the tracks is next Xmas if I remember correctly.

Location
Old Oak Common Station & Hitachi Depot
Duration
Wednesday 18 February – Wednesday 15 April 2026
What we are doing
Micro-tunneling under the existing Great Western Mainline (GWML) track to install a drainage pipe to connect Old Oak Common Station to the existing Thames Water network at the adjacent Hitachi depot.
Western Outfall Old Oak Common Launch shaft
We will be creating a small tunnel 20-metres underground using a small tunnelling machine. This is to connect into an existing maintenance hole in the Hitachi depot. Work activities will be 24/7, however all deliveries will take place during normal working hours (Monday – Friday 8am – 6pm) using the main site entrance.
As the tunnel is in progress, we will be working in the Hitachi depot to receive the small tunnelling machine. This will then be dismantled underground using a high-pressured water jet. Once this is complete the maintenance hole will be reinstated
At a guess, is it the 21st century term for a manhole?What is a maintenance hole?
That strikes me as a curious sentence…Says once done the tunnelling machine will be dismantled by water jet ??
A powerful enough jet of water can cut through steel. E.g. https://www.bbc.co.uk/news/business-66881323That strikes me as a curious sentence…
I guess after doing the run it’s not worth trying to dismantle in a way it can be reused, hence cutting it up. Water jet will be a bit safer than angle grinders or gas torches.A huge robotic arm, wielding a waterjet powerful enough to slice through steel, swings into action.
It is chopping up the hull of a large ship. The structure, which withstood the power of the sea for decades, yields easily to the cutting jet. Before long, the robot has sliced out a big rectangle of steel.
Ah, that makes sense. I was aware of using a water jet to cut steel but that sentence didn't bring the technique to mind for some reason!A powerful enough jet of water can cut through steel. E.g. https://www.bbc.co.uk/news/business-66881323
I guess after doing the run it’s not worth trying to dismantle in a way it can be reused, hence cutting it up. Water jet will be a bit safer than angle grinders or gas torches.
According to the article it's a mixture of water and sand, which makes more sense to me.Ah, that makes sense. I was aware of using a water jet to cut steel but that sentence didn't bring the technique to mind for some reason!