OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.At a guess, there could be some kind of giant concrete mixer turning to keep the concrete fresh?
No apology required, I probably had an inkling it wasn't quite right but didn't set (!) it out clearly enough. I guess there could still be a "concrete mixer" running continuously, just not for quite the reason I suggested.OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.
Concrete mixers turn to stop the aggregate from settling out of suspension.
Other aside, the curing reaction never actually finishes. While concrete reaches (for example) 90% of it's final strength in six hours, the reaction rate just gets asymptotically slower. So there is Roman concrete that's stronger today than it was when Caesar was alive.
(With apologies if I'm explaining the obvious).
Also no apology required, it's something I'd never thought about and didn't know and is rather interesting. Thanks!OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.
Concrete mixers turn to stop the aggregate from settling out of suspension.
Other aside, the curing reaction never actually finishes. While concrete reaches (for example) 90% of it's final strength in six hours, the reaction rate just gets asymptotically slower. So there is Roman concrete that's stronger today than it was when Caesar was alive.
(With apologies if I'm explaining the obvious).
Very nice photos, can anybody help me get my bearings as to what I'm seeing please?A couple of aerial views around Interchange and Curzon Street works
I've been struggling with the images of "Interchange", I thought it was the Interchange Station site, but as it has becomes clearer what is being constructed, the Station site it's self is out of view. The Station buildings will be around 100-120 metres south.Very nice photos, can anybody help me get my bearings as to what I'm seeing please?
The interchange ones are looking north towards the Delta Jn. They need to get the roads changed so they can demolish the roundabout over the M42 and build the HS2 bridge.I've been struggling with the images of "Interchange", I thought it was the Interchange Station site, but as it has becomes clearer what is being constructed, the Station site it's self is out of view. The Station buildings will be around 100-120 metres south.
I think this links to the Interchange Area:-
C224-ARP-CV-DPP-040-321300-FPD-Sheet A1H (publishing.service.gov.uk)
Thank you, I'd finally managed to work out what was being shown. Have they started to clear the site of the actual Station buildings etc? or is that work due to start later?The interchange ones are looking north towards the Delta Jn. They need to get the roads changed so they can demolish the roundabout over the M42 and build the HS2 bridge.
The two bridges on the new roundabout, spanning the HS2 track as shown above, are visible on the aerial photo. They need to get the roundabout finished so they can close and demolish the existing roundabout (just about visible in grey above ), which makes way for a very highly skewed crossing of HS2 over the M42. This sequence of events is probably why activity here is going ahead faster than in some other places - the new road bridge over the M42 went in as early as summer 2020.It looks like it's the highway work rather than for the station itself as you say.
View attachment 106779
I think we can expect Florence to reach the first vent shaft(Chalfont st peter) in the next few weeks/month. I'm guessing they are waiting for the TBMs to go past before they dig into the same depth as the tunnels.HS2 Ltd has updated the TBM positions today for December 15.
In the Chiltern tunnels, Florence is at 2604m, Cecilia is at 1970m.
If the data is correct, the rates of both have picked up to 15m+/day for the last 3 weeks.
No figure for new TBM Dorothy at Long Itchington, though we know it started boring on December 2.
So presumably this is the last update for 2021.
I've no idea if they continue unchecked through the Christmas/New Year period, or take a break
You can do either, but that would be the sensible expectation in this case.I'm guessing they are waiting for the TBMs to go past before they dig into the same depth as the tunnels.
Interesting. Reminiscent of people who said they would never use a horseless carriage.I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else.
Route plans for Birmingham section are here.I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HSP route. If that is the case then there is a great deal of demolition coming up around parts of the city.
He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.
Cheers,
Dave
The vast majority of any demolition has already happened. Most of it was industrial or brown field sites.I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HSP route. If that is the case then there is a great deal of demolition coming up around parts of the city.
He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.
Cheers,
Dave
What's the P in HSP?and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HSP route.
Edited.What's the P in HSP?
It's going nowhere near Liverpool Street so the bus garage isn't being demolished for HS2. As others have said most of the demolition has already been carried out.I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HS2 route. If that is the case then there is a great deal of demolition coming up around parts of the city.
He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.
Cheers,
Dave
Interesting. Reminiscent of people who said they would never use a horseless carriage.
You have lost me there?There are many people for whom HS2 will be inconvenient, rather like using the Glasgow underground is when you are trying to cross London.
"This line won't be useful to me" is completely different to "I have decided I am not going to use this line".There are many people for whom HS2 will be inconvenient, rather like using the Glasgow underground is when you are trying to cross London. It's a fair statement for the poster to have made.
"This line won't be useful to me" is completely different to "I have decided I am not going to use this line".
"It's not useful to me" is a good response. "I have decided that I am never going to use this line" (note the bolded words) is not."I have decided not to use it" is a good response.
Let's agree to differ - and return to the thread "HS2 Construction Updates"."It's not useful to me" is a good response. "I have decided that I am never going to use this line" (note the bolded words) is not.