There is the system for pumping out the slurry, and pumping the water back in. That will be going 24/7.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,590
Location
Scotland
At a guess, there could be some kind of giant concrete mixer turning to keep the concrete fresh?
OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.

Concrete mixers turn to stop the aggregate from settling out of suspension.

Other aside, the curing reaction never actually finishes. While concrete reaches (for example) 90% of it's final strength in six hours, the reaction rate just gets asymptotically slower. So there is Roman concrete that's stronger today than it was when Caesar was alive.

(With apologies if I'm explaining the obvious).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,601
Location
Nottingham
OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.

Concrete mixers turn to stop the aggregate from settling out of suspension.

Other aside, the curing reaction never actually finishes. While concrete reaches (for example) 90% of it's final strength in six hours, the reaction rate just gets asymptotically slower. So there is Roman concrete that's stronger today than it was when Caesar was alive.

(With apologies if I'm explaining the obvious).
No apology required, I probably had an inkling it wasn't quite right but didn't set (!) it out clearly enough. I guess there could still be a "concrete mixer" running continuously, just not for quite the reason I suggested.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
OT, I know, but you can't keep concrete fresh. Once the water hits the cement the reaction starts and cannot be stopped. You can slow it down by cooling the concrete, but it's irreversible. Concrete will quite happily cure underwater if there's no current to disturb it.

Concrete mixers turn to stop the aggregate from settling out of suspension.

Other aside, the curing reaction never actually finishes. While concrete reaches (for example) 90% of it's final strength in six hours, the reaction rate just gets asymptotically slower. So there is Roman concrete that's stronger today than it was when Caesar was alive.

(With apologies if I'm explaining the obvious).
Also no apology required, it's something I'd never thought about and didn't know and is rather interesting. Thanks!
 

city dweller

Member
Joined
17 Apr 2019
Messages
104

A couple of aerial views around Interchange and Curzon Street works

FGQQxkyXoA4Ga8h



FGQIasbXoAY_kmU
 
Last edited:

TBY-Paul

Member
Joined
9 Feb 2013
Messages
340
Very nice photos, can anybody help me get my bearings as to what I'm seeing please?
I've been struggling with the images of "Interchange", I thought it was the Interchange Station site, but as it has becomes clearer what is being constructed, the Station site it's self is out of view. The Station buildings will be around 100-120 metres south.

I think this links to the Interchange Area:-
C224-ARP-CV-DPP-040-321300-FPD-Sheet A1H (publishing.service.gov.uk)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,638
I've been struggling with the images of "Interchange", I thought it was the Interchange Station site, but as it has becomes clearer what is being constructed, the Station site it's self is out of view. The Station buildings will be around 100-120 metres south.

I think this links to the Interchange Area:-
C224-ARP-CV-DPP-040-321300-FPD-Sheet A1H (publishing.service.gov.uk)
The interchange ones are looking north towards the Delta Jn. They need to get the roads changed so they can demolish the roundabout over the M42 and build the HS2 bridge.
 

TBY-Paul

Member
Joined
9 Feb 2013
Messages
340
The interchange ones are looking north towards the Delta Jn. They need to get the roads changed so they can demolish the roundabout over the M42 and build the HS2 bridge.
Thank you, I'd finally managed to work out what was being shown. Have they started to clear the site of the actual Station buildings etc? or is that work due to start later?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,601
Location
Nottingham
It looks like it's the highway work rather than for the station itself as you say.

View attachment 106779
The two bridges on the new roundabout, spanning the HS2 track as shown above, are visible on the aerial photo. They need to get the roundabout finished so they can close and demolish the existing roundabout (just about visible in grey above ), which makes way for a very highly skewed crossing of HS2 over the M42. This sequence of events is probably why activity here is going ahead faster than in some other places - the new road bridge over the M42 went in as early as summer 2020.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,900
Location
Mold, Clwyd
HS2 Ltd has updated the TBM positions today for December 15.
In the Chiltern tunnels, Florence is at 2604m, Cecilia is at 1970m.
If the data is correct, the rates of both have picked up to 15m+/day for the last 3 weeks.

No figure for new TBM Dorothy at Long Itchington, though we know it started boring on December 2.
So presumably this is the last update for 2021.
I've no idea if they continue unchecked through the Christmas/New Year period, or take a break.

Edit: Yes, they do have a break for Christmas and Easter.
 
Last edited:

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
297
HS2 Ltd has updated the TBM positions today for December 15.
In the Chiltern tunnels, Florence is at 2604m, Cecilia is at 1970m.
If the data is correct, the rates of both have picked up to 15m+/day for the last 3 weeks.

No figure for new TBM Dorothy at Long Itchington, though we know it started boring on December 2.
So presumably this is the last update for 2021.
I've no idea if they continue unchecked through the Christmas/New Year period, or take a break
I think we can expect Florence to reach the first vent shaft(Chalfont st peter) in the next few weeks/month. I'm guessing they are waiting for the TBMs to go past before they dig into the same depth as the tunnels.
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,569
Location
England
I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HS2 route. If that is the case then there is a great deal of demolition coming up around parts of the city.

He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.

Cheers,
Dave
 
Last edited:

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
405
Location
UK
I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HSP route. If that is the case then there is a great deal of demolition coming up around parts of the city.

He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.

Cheers,
Dave
Route plans for Birmingham section are here.


The Curzon Street terminus is north of Liverpool Street so it won't be the new line.

Quick search on Google comes up with articles on residential development. Canal side flats.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,638
I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HSP route. If that is the case then there is a great deal of demolition coming up around parts of the city.

He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.

Cheers,
Dave
The vast majority of any demolition has already happened. Most of it was industrial or brown field sites.
 

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
I have long ago decided that I will never use this new line so this question is asked more out of curiosity than anything else. Exactly what route will the new line take into central Birmingham? Only asking as I delivered a car to a NatEx West Midlands driver recently and he said that the depot he works from (Birmingham Central garage, Liverpool Street) is to be obliterated by the HS2 route. If that is the case then there is a great deal of demolition coming up around parts of the city.

He didn't say how long the depot, which is one of the old Birmingham Corporation ones, has left but it has been suggested about 1½ years.

Cheers,
Dave
It's going nowhere near Liverpool Street so the bus garage isn't being demolished for HS2. As others have said most of the demolition has already been carried out.

The station will be on Moor Street between Moor Street station and the Clayton Hotel the line will run alongside the existing lines out of Moor Street and New Street on a Viaduct it will turn north across Lawley Middleway and follow the existing Birmingham Derby line towards Saltley parallel with the Heartlands Parkway. There will be a depot on the site of the former Alstom/Metro Cammell/LDV factories at Common Lane, Ward End then a tunnel under Bromford Lane and Castle Bromwich. There will then be a big junction viaducts above the existing M6/M42 motorway junction. Trains can go south via the main HS2 past the NEC to London, North towards Crewe or East to Nottingham.

Water-Orton-Viaducts-map-showing-location-of-the-viaducts-900x1164.jpg
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes
Interesting. Reminiscent of people who said they would never use a horseless carriage.

There are many people for whom HS2 will be inconvenient, rather like using the Glasgow underground is when you are trying to cross London. It's a fair statement for the poster to have made.

There are many journey options at the moment along the southern WCML which are not central London to central Birmingham, and using HS2 would not help.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,590
Location
Scotland
There are many people for whom HS2 will be inconvenient, rather like using the Glasgow underground is when you are trying to cross London. It's a fair statement for the poster to have made.
"This line won't be useful to me" is completely different to "I have decided I am not going to use this line".
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes
"This line won't be useful to me" is completely different to "I have decided I am not going to use this line".

Many people would have decided not to use horseless carriages for the right reasons - cost, lack of roads, etc. 100 years on things looked different, but at the time it was a fair comment. Deciding not to use something can be a knee-jerk, or a perfectly rational and calculated, response.

Suppose my regular commute is Brum to Milton Keynes. I could go from Curzon to Interchange, use the shuttle to International, catch the train to Milton Keynes. It won't be an improvement on just going on what remains of the existing service. "I have decided not to use it" is a good response.
 
Status