New drone video from Washwood Heath tunnel portal to Curzon Street.
It shows a concrete stair or vent tower built between the tracks in the cutting where TBMs finished (looks like cutting will be covered for first part to move portal nearer Birmingham.
Evidence of what looks like a massive drainage ditch between HS2 cutting and existing tracks.
Lots of mud at depot site and no sign yet of any depot buildings or stabling sidings etc
The two viaducts (old Ashton Church Road, and Saltney) are still blocking Route, but presumably are scheduled for demolition soon.
The metal skeleton of the curved viaduct that will cross the tracks just before container depot is now visible (does this get pushed across at intervals as it is extended). Some of the piers don't yet seem to be complete.
The large arch bridge has has lot of scaffolding removed (it is due to be slid into position late May).
Curzon Street station is starting to see concrete columns amongst the pile caps
It shows a concrete stair or vent tower built between the tracks in the cutting where TBMs finished (looks like cutting will be covered for first part to move portal nearer Birmingham.
Evidence of what looks like a massive drainage ditch between HS2 cutting and existing tracks.
Lots of mud at depot site and no sign yet of any depot buildings or stabling sidings etc
The two viaducts (old Ashton Church Road, and Saltney) are still blocking Route, but presumably are scheduled for demolition soon.
The metal skeleton of the curved viaduct that will cross the tracks just before container depot is now visible (does this get pushed across at intervals as it is extended). Some of the piers don't yet seem to be complete.
The large arch bridge has has lot of scaffolding removed (it is due to be slid into position late May).
Curzon Street station is starting to see concrete columns amongst the pile caps