And 24s. Prior to that mostly Crabs and class 4 0-6-0s. Through coaches from Derby (and possibly elsewhere?) for part of their history.Yes....hauled by Cricklewood-allocated class 27s in the D5379-5415 series
And 24s. Prior to that mostly Crabs and class 4 0-6-0s. Through coaches from Derby (and possibly elsewhere?) for part of their history.Yes....hauled by Cricklewood-allocated class 27s in the D5379-5415 series
Mostly 46 headcode - have a look on flickr or othe photo libraries for MLV boat train for examples. 56 was Vic/Folkestone Harbour.What would be the headcode of a victoria > dovre boat train ; being cep>bep>cep>mlv? or even the return dover> victoria?
Plus several other headcodes, depending on the route taken.Mostly 46 headcode - have a look on flickr or othe photo libraries for MLV boat train for examples. 56 was Vic/Folkestone Harbour.
But mostly 46!Plus several other headcodes, depending on the route taken.
74 for the Up NF via Chatham.But mostly 46!
Are there still Ocean Liner Trains to Southampton? Docks, Terminus, Central or wherever.The only "boat trains" I took, or nearly took in the mid 80s, were the London to Dover to connect with the Jetfoil to Ostend, and the connection from Sittingbourne to Sheerness to catch the Olau Line ferry.
The nearly took was the Cruise Liner connection to Southampton Docks, which my dad refused to pay the extra for, so ended up getting the service train to Southampton Central!
Long gone - Altantic ships and stations alike. Southampton only plays host to container ships and pleasure cruise ships these years.Are there still Ocean Liner Trains to Southampton? Docks, Terminus, Central or wherever.
The ocean liner terminus did close a few decades agoAre there still Ocean Liner Trains to Southampton? Docks, Terminus, Central or wherever.
Relatively recently there was a charter train service for cruise ship passengers from north of England but I think it ceased operating pre Covid sort of time.Are there still Ocean Liner Trains to Southampton? Docks, Terminus, Central or wherever.
Yes, I think it was Stobart Rail?Relatively recently there was a charter train service for cruise ship passengers from north of England but I think it ceased operating pre Covid sort of time.
It was offered to me once as an extra add on with a p&o cruise booking but foolishly I didn’t opt for it.
Fond memories of CEP+MLV lashups on Channel Trains from Victoria to Dover Western Docks and Folkestone Harbour. Great start and end to Interrail adventures in the early 90's.
They did (checked 1955) as the IoM service operated from Fleetwood then.Did boat trains run to Fleetwood about 1950 because I have a very distant memory of standing as a small child on the footplate of what I was told was one. If true did it come from Manchester?
A lightly loaded 8 VEP on the day I rode it............1980's .......(no diary kept !)Back in 1970s and 1980s there were Waterloo - Lymington Pier Summer Saturday trains connecting with Sealink ferries to Yarmouth.
From memory were either pairs of 4CIGs or 4VEPs
In view of the fact that the Lymington branch was restricted to a four car unit - or a pair of 2-HAPs - running in series only, due to power supply constraints, did they uncouple one of the units at Brockenhurst?A lightly loaded 8 VEP on the day I rode it............1980's .......(no diary kept !)
I remember them as cep>bep>cep>mlvInteresting to note these still rain in the early 90s but I guess they kept going until Eurostar.
I do remember there were many boat trains still in summer 1987. I spent one day at Tonbridge in August 1987 and was surprised to see just how many boat trains there were. Possibly about one per hour in each direction; on the public timetable only one train per hour was timetabled non-stop through Tonbridge in each direction (the Charing Cross-Dover fast) but in actuality, around 2 trains per hour in each direction went straight through. I must have figured out the extras were boat trains, having vaguely heard of their existence.
It also meant I racked up my CEP count (having seen only a few until then) much more than I was expecting! Most were 12CEP + MLV, if I remember right.
Good point - a sole "HAP" would have been more than enough on the branch. ! Maybe they did uncouple at Brockenhurst........In view of the fact that the Lymington branch was restricted to a four car unit - or a pair of 2-HAPs - running in series only, due to power supply constraints, did they uncouple one of the units at Brockenhurst?
I think they tolerated it then, the pier platform could take 8car. As shorter trains ran between the Waterloo trains, the substation at Lymington Junction could cool off between.In view of the fact that the Lymington branch was restricted to a four car unit - or a pair of 2-HAPs - running in series only, due to power supply constraints, did they uncouple one of the units at Brockenhurst?
The 1983 Working TT is available on 'Timetable World' (free to view).I think they tolerated it then, the pier platform could take 8car. As shorter trains ran between the Waterloo trains, the substation at Lymington Junction could cool off between.
8VEP was nearer 2000HP with no fancy electronics complaining about low voltage. A class 450 is nearer 1500HP (electronically restricted), or from memory 2050HP (when unlimited, which is nowhere on SWR territory)
Not strictly true. Cunard's Queen Mary 2 still provides year round transatlantic crossings to New York (7 days each way, non-stop) with cruises interspersed between the crossings. The QM2 is still described as the world's last ocean liner and is built differently to cruise ships in order to withstand bad weather in ocean waters. You can even take dogs & cats on the crossings!Long gone - Altantic ships and stations alike. Southampton only plays host to container ships and pleasure cruise ships these years.
AbsolutelyNot strictly true. Cunard's Queen Mary 2 still provides year round transatlantic crossings to New York (7 days each way, non-stop) with cruises interspersed between the crossings. The QM2 is still described as the world's last ocean liner and is built differently to cruise ships in order to withstand bad weather in ocean waters. You can even take dogs & cats on the crossings!
However, I suspect that the passenger base for such sailings (2500, iirc) would have such disparate UK destinations/departure points that the numbers willing to travel by boat train would be too few to make such a service viable unless it was to the north of England with multiple calling points.
and my "long-gone" reply was in the context of dedicated trains to dedicated Southampton railway termini. I didn't visit Southampton's Canute Road area until long after a "wander in" general access to Ocean Docks had ceased.I remember them as cep>bep>cep>mlv
Good point - a sole "HAP" would have been more than enough on the branch. ! Maybe they did uncouple at Brockenhurst........
Not strictly true. Cunard's Queen Mary 2 still provides year round transatlantic crossings to New York (7 days each way, non-stop) with cruises interspersed between the crossings. The QM2 is still described as the world's last ocean liner and is built differently to cruise ships in order to withstand bad weather in ocean waters. You can even take dogs & cats on the crossings!
However, I suspect that the passenger base for such sailings (2500, iirc) would have such disparate UK destinations/departure points that the numbers willing to travel by boat train would be too few to make such a service viable unless it was to the north of England with multiple calling points.
Having had a life times trip to NYC on the QM2 some years ago , we did the simple thing and got a taxi from Southampton Central to the berth and boarded easily - the last sailing of the year , and ran into some bad weather in the Atlantic , neccesitating a slight diversion to avoid the heavy seas . We were into Brooklyn some days later , and the MTA of course did not provide bespoke subway specials to get us to Manhatten Island - we got another cab !Even if there was a operable route with sufficient demand to justify a dedicated boat train service, there's the problem of timing. In my experience, ships (cruises and QM2 transatlantic crossings) arrive early morning and disembark passengers around 07:00-08;30, then embark passengers for the next voyage in early afternoon, say 14:00-15:00. So it might just be possible to operate to Birmingham and back (with very little margin for delay); anything further would need two one-way trains and all the associated extra costs.
Fascinating. Where did the Compton start? Not in Liverpool presumably?Here's an unusual one:
Liverpool Lime St to Newhaven Marine midweek in the early 80's.
It was a Football Special for a Liverpool game in France.
We picked it up @ Clapham Junction and ran non stop to Lewes where another Brighton crew took it down to the sea. It was hauled by a single Crompton.
Clapham Jcn, where Big Jumby 74's crew picked it up?Fascinating. Where did the Compton start? Not in Liverpool presumably?