do we really need a dedicated HS2 line north of birmingham for manchester?
If speed and capacity is needed 4 tracking winsford-warrington would surely be a good option. the line is quite straight. Manchester and liverpool services could join the chat moss. there is lots of brown belt land around manchester victoria and salford for a dedicated station there and would allow journeys to continue furthur north - leeds etc. A drawback with piccadilly is that it is a terminus.
All this land around Manchester Victoria and Salford, where is it? And what do you need to go through to get to it, oh, and how will you connect it to Piccadilly or Victoria?
It would also mean going a rather long way round to Manchester, and running into the side of rail services where there is the least spare capacity, and spare land near where you can connect to existing stations.
If you have a 'dedicated' HS2 station that isn't anywhere near any other stations, such as on the land between Deal St Jcn and Ordstall Lane Jcn (That I have seen mentioned) quite aside from having little or no available routes without masses of demolition, it's nowhere near any other major stations, Salford Central doesn't count!
Said it before and I'll say it again, in Manchester the only space large enough and close enough to an existing major station is the Baring St industrial area, formally housed dangerous industry so probably can't ever be used for housing, is definitely brown belt, right next to Piccadilly, has available land for an approach (tunneled out from Longsight to the Fallowfeild Loop, then a short tunnel out to near Sale Waterpark, then following the old M60 route through Roundhorn Ind Estate (Would loose about 10 commercial / private premises and some industrial units, easy to relocate industry!) and into the Manchester South Parkway / Manchester Airport station N of the M56 Spur where the jetparks car parks are (lets just hope this is decided and reserved before much of the Manchester Enterprise Zone is planned and erected there) with a Y junction NW of the M56, a little bit more tunnel to meet up with the old trackbed over though West Timperley (Still in use for freight) and use the embankments in place to cross the ship canal and then form up Manchester West Parkway station between the Chat Moss and CLC routes, near the Birchwood junction on the M62 for easy vehicle access, and then branches provided onto the Chat Moss for Liverpool and WCML for services further North. To complete the Delta junction into Manchester, a branch from Manchester around Sale Water Park will run around the North of Ashton upon Mersey and meet the main route to Manchester W Parkway near Carrington and Patrington at the ship canal crossing, where space is also provided for a D2/3M roadway on the same bridge.
Onwards as HS2 can continue on some disused trackbeds around Wigan, would take out Lowton Business Park and some housing unfortunately, or you could make a curveyer route.
Initally simply linking into the WCML and Chat Moss via the well, Chat Moss...
--- old post above --- --- new post below ---
The standard class carriages of a TGV Duplex can accomodate 80 passengers (Except for the end carriage, R8, which seats 92), although each carriage is only 18.7 metres long.
--- old post above --- --- new post below ---
An 11 carriage 390 will have 444 standard class seats (plus 6 tip-up) and 145 first class seats, so a total of 589 seats.
A 12-car 350/1 formation would have 606 standard class seats (plus 27 tip-up) and 72 first class seats.
Ta. Point remains that an HS2 captive unit will carry more passengers than a WCML unit.