Where would a DMU reverse at Bh Central? Before electrification they reversed at Rock Ferry but that is equally implausible.
There are EMUs every 7 to 8 minutes in the peak between Ha Sq and Hooton. What do you need another service on top of that for? So reversal at Hooton? Why? EP is every 15 minutes, so you reverse at EP. Back to where we started. :cry:
Birkenhead Central basically has a south-facing bay at present. All we need is the fence removing and the platform edge extending slightly.
Surely a better idea would be to go to Birkenhead North via the out of use line that branches off at Rock Ferry (and reopen platform 0 there).
Is this line still connected at the North end?