Not to mention that it will also lead to a big increase in traffic through Warrington, especially via Daresbury and Great Sankey by motorists to avoid the tolls.
Those that do will just add more traffic, bigger delays in Warrington at the various major junctions and that is not forgetting when the MSC bridges get opened to let a ship throught too! Eventually they will use the "new" bridge!

(When "new" bridge opens, the Jubilee bridge will be closed for about 12 mths to play catch up on repairs along with decreasing the road lanes to one in each direction!)

As for the taxi drivers in the borough, I think that is fair to be honest but they can register for reduce charges in various ways with as I understand period passes too. So it wont be £2.00 each way although I suspect taxi drivers will use that as an excuse to make more money! :lol:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185143

Established Member
Joined
3 Mar 2013
Messages
5,357
Those that do will just add more traffic, bigger delays in Warrington at the various major junctions and that is not forgetting when the MSC bridges get opened to let a ship throught too! Eventually they will use the "new" bridge!

(When "new" bridge opens, the Jubilee bridge will be closed for about 12 mths to play catch up on repairs along with decreasing the road lanes to one in each direction!)

As for the taxi drivers in the borough, I think that is fair to be honest but they can register for reduce charges in various ways with as I understand period passes too. So it wont be £2.00 each way although I suspect taxi drivers will use that as an excuse to make more money! :lol:
Just what this town needs...
 

Wavertreelad

Member
Joined
24 Feb 2013
Messages
811
Those that do will just add more traffic, bigger delays in Warrington at the various major junctions and that is not forgetting when the MSC bridges get opened to let a ship throught too! Eventually they will use the "new" bridge!

(When "new" bridge opens, the Jubilee bridge will be closed for about 12 mths to play catch up on repairs along with decreasing the road lanes to one in each direction!)

As for the taxi drivers in the borough, I think that is fair to be honest but they can register for reduce charges in various ways with as I understand period passes too. So it wont be £2.00 each way although I suspect taxi drivers will use that as an excuse to make more money! :lol:

Quite right and don't forget the Jubilee Bridge will close on the day the new bridge opens, and when it reopens it will be tolled too. I was at a presentation last week about the tolling arrangements which is presently "on tour" advising transport operators of the costs and arrangements. We can also expect a media campaign to start shortly across all forms of media to alert the general public. Just remember, if you don't haven't prepaid for your trip you have to 23.59hr the following day to pay the bill, otherwise potentially you could end up with a GBP60.00 bill.

All the details are on this link.

http://www.merseyflow.co.uk/
 
Last edited:

Railman

Member
Joined
17 Jul 2012
Messages
97
It just shows how "joined up thinking" should have worked. The chord should have been completed before the new Bridge, with all the traffic delays (during construction) and future Tolls. The car parks at Helsby and Frodsham extended, in readiness and rail taking the initiative to offer a better alternative to road. It would have meant staging the resignalling from Runcorn to Weaver in to Part 1 of the the Weaver Wavertree overall scheme, but totally possible. Now how many meetings and different bodies would that have required????
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,842
Location
Liverpool, UK
It just shows how "joined up thinking" should have worked. The chord should have been completed before the new Bridge, with all the traffic delays (during construction) and future Tolls. The car parks at Helsby and Frodsham extended, in readiness and rail taking the initiative to offer a better alternative to road. It would have meant staging the resignalling from Runcorn to Weaver in to Part 1 of the the Weaver Wavertree overall scheme, but totally possible. Now how many meetings and different bodies would that have required????
They would still be talking.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
I travelled on the parliamentary train last Saturday from Chester to Runcorn, noticed on the curve, concrete sleepers, plus other items which I have not idea what hey were, all at regular intervals along the line.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Something was happening today on the curve near junction with North Wales line. Engineers were there installing some sort metal object
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Well I was driving at the time, so it was just a view from the car, I suppose you could say it looked possibly like a new signal, it was that sort of shape. A crane was involved.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
In a few months time they'll get told of a different job starting on the Halton curve, forget what they previously reported and report 'work starts today' again.
This one has all the hallmarks of them reporting what NR tell them. There isn't a press release on NR's site yet but the media report linked by Cheshire Rover has quotes from the SoS for Wales, the Liverpool City Region Mayor and the Northern Powerhouse Minister.

Remember George Osborne? When he visited the works for the fourth platform at Manchester Airport station, all the media put out NR's line that it was the start of works, but they had actually started seven or eight months earlier.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Lets hope that the "team" involved with the Saltney Junction to Rosset re-doubling are not involved :(

Murphy will be the contractor, if the site photo is anything to go by.
NR were disinterested to say the least in the Saltney scheme, not seeing the need for it.
This time I think they are taking the political requirement more seriously.
It's fortunate there's the Weaver Jn-Liverpool upgrade to hang it on.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,842
Location
Liverpool, UK
Will the lead time from now to the completion and opening of the line to passenger trains be sufficient for Arriva Trains Wales to procure the necessary rolling stock for the route.
t is a pity that Northern are not the operator as the 769 FLEX would be the perfect unit for such a route.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Will the lead time from now to the completion and opening of the line to passenger trains be sufficient for Arriva Trains Wales to procure the necessary rolling stock for the route.
t is a pity that Northern are not the operator as the 769 FLEX would be the perfect unit for such a route.

And based at Allerton too.
They'll scrabble a couple of 150s from somewhere.
It's not even certain W&B will be operating the initial service anyway (funded by Merseytravel).
 

sw1ller

Established Member
Joined
4 Jan 2013
Messages
1,567
Will the lead time from now to the completion and opening of the line to passenger trains be sufficient for Arriva Trains Wales to procure the necessary rolling stock for the route.
t is a pity that Northern are not the operator as the 769 FLEX would be the perfect unit for such a route.

Don't say that, I'm a driver at Chester and I'm looking forward to learning the new route. ;0)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
What are the distance comparisons from Liverpool to Chester of the existing 3rd rail route and for the proposed route using the reopened curve.

Chester to Liverpool Lime St is 17m22c via Hooton (and 14 intermediate stations). Some trains miss out Capenhurst, but otherwise it's a tedious all stations.
Via the Halton Curve it is 27m36c, with 7 intermediate stations. It seems the new trains will stop at most of these.

Speeds via Hooton are 70mph max (60 north of Hooton and much slower north of Rock Ferry.
Speeds via Runcorn are 75mph on the Cheshire section and 80-95 north of Ditton (very slow on the Halton Curve and through the junctions at either end, and after Wavertree).
Journey times are going to be much the same at about 45 minutes either way.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,432
Location
A typical commuter-belt part of north-west England
Chester to Liverpool Lime St is 17m22c via Hooton (and 14 intermediate stations). Some trains miss out Capenhurst, but otherwise it's a tedious all stations.
Via the Halton Curve it is 27m36c, with 7 intermediate stations. It seems the new trains will stop at most of these.

Speeds via Hooton are 70mph max (60 north of Hooton and much slower north of Rock Ferry.
Speeds via Runcorn are 75mph on the Cheshire section and 80-95 north of Ditton (very slow on the Halton Curve and through the junctions at either end, and after Wavertree).
Journey times are going to be much the same at about 45 minutes either way.

That being said about the journey times, the service frequency will be one point to bear in mind when comparing both these routes.
 