• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GEML franchise 2016

Status
Not open for further replies.

DasLunatic

Member
Joined
11 May 2015
Messages
696
The size of them are way beyond our small loading gauge...

I'm not so sure.

The V250 is 2.87m wide by 201m long. This is just 5mm wider than a 321, and fits within a W9 loading gauge, which is the gauge provided from London all the way to Norwich. I also assume that Breda have fixed the trains in the three years they've been out of use...
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I'm not so sure.

The V250 is 4.08m tall by 2.87m wide by 201m long. This is just 5mm wider than a 321, and fits within a W9 loading gauge, which is the gauge provided from London all the way to Norwich. I also assume that Breda have fixed the trains in the three years they've been out of use...

Kinematic envelope issues may well come into play.

What's the carriage overhang, what's the vehicle end throw, what's the cross sectional profile, what's the underfloor taper like etc.
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
I'm not so sure.

The V250 is 4.08m tall by 2.87m wide by 201m long. This is just 5mm wider than a 321, and fits within a W9 loading gauge, which is the gauge provided from London all the way to Norwich. I also assume that Breda have fixed the trains in the three years they've been out of use...

It's not only width, it's also the length.The length of the driving car is nearly 27m, the intermediate ones 24.5m with a width of 2.87m. Compare that to the Hitachi Super Express, which has car lengths of 26m and a width of 2.7m.

It wouldn't work, its too oversized, it would give off a massive overhang, not healthy for tunnels and probably rip the train in pieces.

They are also taller than the standard British unit and will need modifications to the overhead wire and you can't just do that because the railway is not a 'giant lego set'.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
I'm not so sure.

The V250 is 2.87m wide by 201m long. This is just 5mm wider than a 321, and fits within a W9 loading gauge, which is the gauge provided from London all the way to Norwich. I also assume that Breda have fixed the trains in the three years they've been out of use...

The bigger issue is that the GB loading gauge is narrower below platform level. All sorts of things have been put in the platform space across the network so it wouldn't even be a matter of rebuilding just the platforms.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
I think the concept itself is a way out of the question anyway for all sorts of reasons, but if by some magic they could be made to work, looking at the history of the V250s I wouldn't want them anywhere near the UK network. With the order officially cancelled there's no obligation for AB to have them rectified unless they have another buyer, which i see no evidence of. Based on their past reputation the units are probably turning to rot at an alarming speed. An utter waste as I'm sure a lot of people worked very hard on those units but with more than three years since their withdrawal, I can't see them ever being used again, I suspect the product is destined to be a railway industry white elephant.
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
I think the concept itself is a way out of the question anyway for all sorts of reasons, but if by some magic they could be made to work, looking at the history of the V250s I wouldn't want them anywhere near the UK network. With the order officially cancelled there's no obligation for AB to have them rectified unless they have another buyer, which i see no evidence of. Based on their past reputation the units are probably turning to rot at an alarming speed. An utter waste as I'm sure a lot of people worked very hard on those unitsbut with more than three years since their withdrawal, I can't see them ever being used again, I suspect the product is destined to be a railway industry white elephant.

I doubt they were even trying with the design. That thing is a pretty ugly beast to me.
 
Last edited:

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Yeah it looks very outdated, both inside and out in my opinion, though there are plenty of relatively high quality trains out there that I think many would say are ugly (things like the Class 380 come to mind). My point is that just because a project was a catastrophe doesn't mean every single member of its team was slacking off - hence the word 'some' :p
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
Yeah it looks very outdated, both inside and out in my opinion, though there are plenty of relatively high quality trains out there that I think many would say are ugly (things like the Class 380 come to mind). My point is that just because a project was a catastrophe doesn't mean every single member of its team was slacking off - hence the word 'some' :p

To be fair, the 380's look rather neat with the curved front and sleek headlamps. The ones that really disgust me on this network are the ones with flat ends (444, plastic pigs:D)
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I think the concept itself is a way out of the question anyway for all sorts of reasons, but if by some magic they could be made to work, looking at the history of the V250s I wouldn't want them anywhere near the UK network. With the order officially cancelled there's no obligation for AB to have them rectified unless they have another buyer, which i see no evidence of. Based on their past reputation the units are probably turning to rot at an alarming speed. An utter waste as I'm sure a lot of people worked very hard on those units but with more than three years since their withdrawal, I can't see them ever being used again, I suspect the product is destined to be a railway industry white elephant.

There's no AnsaldoBreda anymore, it's now Hitachi Rail Italy, and they've not pursued the V250 range. If the units don't go for scrap, they might be used as demonstrators for things like the HS2 rolling stock order.
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
There's no AnsaldoBreda anymore, it's now Hitachi Rail Italy, and they've not pursued the V250 range. If the units don't go for scrap, they might be used as demonstrators for things like the HS2 rolling stock order.

A withdrawn TGV Sud-est set probably has a higher chance of being a demonstrator for HS2 than the V250. I honestly see zero-future in that thing.
 

chubs

Member
Joined
30 Oct 2012
Messages
694
Somebody would have to be completely insane to take on the V250's. The catalogue of faults was horrendous, for some units it ran into the hundreds! If NS decided it wasn't feasible to have them brought up to standard then that is pretty damning evidence.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
It's not only width, it's also the length.The length of the driving car is nearly 27m, the intermediate ones 24.5m with a width of 2.87m. Compare that to the Hitachi Super Express, which has car lengths of 26m and a width of 2.7m.

It wouldn't work, its too oversized, it would give off a massive overhang, not healthy for tunnels and probably rip the train in pieces.

They are also taller than the standard British unit and will need modifications to the overhead wire and you can't just do that because the railway is not a 'giant lego set'.

Even NC64 set had to be modified before AGA could use it, until then, it ran as an 'X' when it moved when ECS, even 360's are barred over quite a bit of the Anglia Region
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
A withdrawn TGV Sud-est set probably has a higher chance of being a demonstrator for HS2 than the V250. I honestly see zero-future in that thing.

The bodyshells are perfect for demonstrating seating and interior fit out options, catering options and for static testing of air conditioning, doors, PIS systems, that sort of thing.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Somebody would have to be completely insane to take on the V250's. The catalogue of faults was horrendous, for some units it ran into the hundreds! If NS decided it wasn't feasible to have them brought up to standard then that is pretty damning evidence.

So we're in with a chance then ;)

The GEML has a history of cast offs. All we need is a modern class 309, though something less suitable will doubtless be ordered.
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
There are very few trains in use outside of GB that would fit our loading gauge. There are passenger trains in use in South Africa and Thailand which were based on GB designs, while some of the GB-compatible Eurostar sets ended up in use on domestic TGV services. Compatible locomotives aren't as uncommon since there's no real reason to redesign a GB locomotive for use elsewhere.

Even the Thailand units (class 360 variety) wouldn't fit due to them having larger roof-mounted equipment pods.

SpacePhoenix said:
Class 230s? :lol:
Oh don't you start! :lol::lol:
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
There is always the elephant, or maybe pig, in the corner we could have over here... ;)
 

dsc17

Member
Joined
1 Jul 2016
Messages
10
Location
essex
Noticed yesterday that the 321 refurb unit and demonstrator were on GEML yesterday on trials, maybe an indication that an announcement is due
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Noticed yesterday that the 321 refurb unit and demonstrator were on GEML yesterday on trials, maybe an indication that an announcement is due

I doubt that would mean an announcement is due, it's more likely to mean DfT have allowed bids to be revised with alternatives being examined.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
I've given up with rumours as apart from the delay in the announcement all of them have been false. But if you do like a good rumour the latest from a management type person is we should hear either way by mid August. I'm certainly starting to believe another extension is around the corner. I think there will be a few very unpopular MP's in the East if that does happen considering all the PR they have put out about the new franchise. Then again considering most of them campaigned in favour of Brexit then I think it's good comeuppance for them. With the uncertainty of the next few years I don't think any company would want to on the massive bill for the new fleet that's expected.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I've given up with rumours as apart from the delay in the announcement all of them have been false. But if you do like a good rumour the latest from a management type person is we should hear either way by mid August. I'm certainly starting to believe another extension is around the corner. I think there will be a few very unpopular MP's in the East if that does happen considering all the PR they have put out about the new franchise. Then again considering most of them campaigned in favour of Brexit then I think it's good comeuppance for them. With the uncertainty of the next few years I don't think any company would want to on the massive bill for the new fleet that's expected.

One rumour is one of the bidders proposed replacing every train in the Anglia fleet. We don't know if that's true or not - one consistent DMU fleet and releasing DMUs for bidders of other franchises like LM and EMT had logic to it, one consistent EMU fleet and having 94 x 321s off-lease doesn't. However, if someone has submitted a bid which includes replacing 321s it doesn't sound illogical that they want to reconsider and state Brexit for wanting to reconsider.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
One rumour is one of the bidders proposed replacing every train in the Anglia fleet. We don't know if that's true or not - one consistent DMU fleet and releasing DMUs for bidders of other franchises like LM and EMT had logic to it, one consistent EMU fleet and having 94 x 321s off-lease doesn't. However, if someone has submitted a bid which includes replacing 321s it doesn't sound illogical that they want to reconsider and state Brexit for wanting to reconsider.

Greater Anglia needs a clear out, it's just a mess in terms of stock. What possessed National Express to order Electrostars instead of Class 350 Desiro stock, for example ?

You would need to accept some stock being scrapped - probably all of the Class 317 units, but we're at that stage already, aren't we. We've certainly accepted they're expendable. The Class 321 stock, as you say, is an issue.

The only thing I can think of is for the 94 x Class 321 units to re-tractioned and re-geared to 75mph, working in pairs for the South Wales Valleys, 8 x 20m platforms rather than the proposed 6 x 23m might be do-able and you get something fairly similar to the Glasgow Class 320 units (albeit a coach longer per unit) which would work well there.

I'd assume you would send the Class 360 units to London Midland, the 21 Class 360 units from Greater Anglia plus the 5 from Heathrow Connect/Express could either provide additional capacity, or maybe even release the dual voltage Class 350/1 fleet for South West Trains, adding in some additional flexibility if there's to be any progress on schemes such as the North Downs electrification at 25kV AC.

The remainder of the fleet at Greater Anglia would presumably then be backfilled by Bombardier EMU stock, a mixture of 5 x 23m 125mph stock and 4 x 20m 100mph/110mph stock, all of which is compatible with the existing Class 379 units.

DMU stock - do you dump a new CAF fleet at Greater Anglia, or do you infill the missing electrification and expand the EMU fleet instead, or a combination of both so as infill electrification makes the new CAF stock redundant, it can transfer to Northern, allowing older stock to be replaced ?

It's all terribly expensive though, very dependent on works capacity, and ultimately needs decisions on electrification which aren't going to come soon enough to make it all fall into place, even if someone was that ambitious.
 

BuryBlue

Member
Joined
8 Jun 2016
Messages
77
Greater Anglia needs a clear out, it's just a mess in terms of stock. What possessed National Express to order Electrostars instead of Class 350 Desiro stock, for example ?

You would need to accept some stock being scrapped - probably all of the Class 317 units, but we're at that stage already, aren't we. We've certainly accepted they're expendable. The Class 321 stock, as you say, is an issue.

The only thing I can think of is for the 94 x Class 321 units to re-tractioned and re-geared to 75mph, working in pairs for the South Wales Valleys, 8 x 20m platforms rather than the proposed 6 x 23m might be do-able and you get something fairly similar to the Glasgow Class 320 units (albeit a coach longer per unit) which would work well there.

I'd assume you would send the Class 360 units to London Midland, the 21 Class 360 units from Greater Anglia plus the 5 from Heathrow Connect/Express could either provide additional capacity, or maybe even release the dual voltage Class 350/1 fleet for South West Trains, adding in some additional flexibility if there's to be any progress on schemes such as the North Downs electrification at 25kV AC.

The remainder of the fleet at Greater Anglia would presumably then be backfilled by Bombardier EMU stock, a mixture of 5 x 23m 125mph stock and 4 x 20m 100mph/110mph stock, all of which is compatible with the existing Class 379 units.

DMU stock - do you dump a new CAF fleet at Greater Anglia, or do you infill the missing electrification and expand the EMU fleet instead, or a combination of both so as infill electrification makes the new CAF stock redundant, it can transfer to Northern, allowing older stock to be replaced ?

It's all terribly expensive though, very dependent on works capacity, and ultimately needs decisions on electrification which aren't going to come soon enough to make it all fall into place, even if someone was that ambitious.

It would be nice to see the 153's banished once and for all, have to say. I can't see electrification being particularly challenging, either. However maybe some displaced DMUs should stay with Anglia to strengthen services elsewhere.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
Greater Anglia needs a clear out, it's just a mess in terms of stock. What possessed National Express to order Electrostars instead of Class 350 Desiro stock, for example ?

You would need to accept some stock being scrapped - probably all of the Class 317 units, but we're at that stage already, aren't we. We've certainly accepted they're expendable. The Class 321 stock, as you say, is an issue.

The only thing I can think of is for the 94 x Class 321 units to re-tractioned and re-geared to 75mph, working in pairs for the South Wales Valleys, 8 x 20m platforms rather than the proposed 6 x 23m might be do-able and you get something fairly similar to the Glasgow Class 320 units (albeit a coach longer per unit) which would work well there.

I'd assume you would send the Class 360 units to London Midland, the 21 Class 360 units from Greater Anglia plus the 5 from Heathrow Connect/Express could either provide additional capacity, or maybe even release the dual voltage Class 350/1 fleet for South West Trains, adding in some additional flexibility if there's to be any progress on schemes such as the North Downs electrification at 25kV AC.

The remainder of the fleet at Greater Anglia would presumably then be backfilled by Bombardier EMU stock, a mixture of 5 x 23m 125mph stock and 4 x 20m 100mph/110mph stock, all of which is compatible with the existing Class 379 units.

DMU stock - do you dump a new CAF fleet at Greater Anglia, or do you infill the missing electrification and expand the EMU fleet instead, or a combination of both so as infill electrification makes the new CAF stock redundant, it can transfer to Northern, allowing older stock to be replaced ?

It's all terribly expensive though, very dependent on works capacity, and ultimately needs decisions on electrification which aren't going to come soon enough to make it all fall into place, even if someone was that ambitious.

Mr RF's sources from the train manufacturers were certainly under the impression that there was going to be large orders placed for a variety of stock. But in the latest column he has pointed out that Brexit will have a pretty significant impact on the cost of trains and future growth in revenues. I believe the whole 321 refurb/retraction is a bit of a red herring from what I've heard from some of the fitters. It's all a complete mess. If there is another extension I would be interested to hear the response from the MP's, especially considering a lot of Tory seats are not 'safe seats'.
 
Last edited:
Status
Not open for further replies.

Top