Yes, it was used during the Chorley Arches works...
When the chorley arches where being done, services where being terminated short at Chorley (2tph), sent via Bolton & Wigan 2tph, via Atherton 1tph, and all the Lancaster services went via the Chat Moss, so yeah, I'd expect the chat moss route to be used during diversions.
Hopfully TfGM will engage their brains and have more and longer services calling at Atherton with Rail tickets being accepted on buses between Atherton and Bolton, with more frequent services being provided, and continuing to Bolton Interchange rater than Moor St Bus Station.
I get the feeling there might need to be block closures when the Farnworth Tunnels need doing...
On further thought, how difficult would it be to re-instate a curve between the Atherton line and Lostock Junction.
Here
Maybe (wishful thinking) extend it up to blackrod so that wholesale closures are a possiblilty, or pair in the old curve that loops round at Lostock.
If the Atherton line could take 6tph then it would be helpful to have 2tph to Bolton and 2tph up to Preston, during closures between Bolton and Salford Crescent
When the chorley arches where being done, services where being terminated short at Chorley (2tph), sent via Bolton & Wigan 2tph, via Atherton 1tph, and all the Lancaster services went via the Chat Moss, so yeah, I'd expect the chat moss route to be used during diversions.
Hopfully TfGM will engage their brains and have more and longer services calling at Atherton with Rail tickets being accepted on buses between Atherton and Bolton, with more frequent services being provided, and continuing to Bolton Interchange rater than Moor St Bus Station.
I get the feeling there might need to be block closures when the Farnworth Tunnels need doing...
On further thought, how difficult would it be to re-instate a curve between the Atherton line and Lostock Junction.
Here
Maybe (wishful thinking) extend it up to blackrod so that wholesale closures are a possiblilty, or pair in the old curve that loops round at Lostock.
If the Atherton line could take 6tph then it would be helpful to have 2tph to Bolton and 2tph up to Preston, during closures between Bolton and Salford Crescent