• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future plans in Wales

Status
Not open for further replies.

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
Sorry I've been late in joining this thread. I wanted to make sure I had the time to give it some proper attention. Here are some of my thoughts.

Firstly, this discussion is jumping the gun a little, as the political make-up of the Senedd in Cardiff Bay after May's election is still up in the air.

South East Wales
The whole Metro idea has strong backing from Government, so there'll certainly be something happening. Plans need to be clarified over the next two years, but I'm going to assume that the majority of the network will continue to be operated by heavy rail.

Doubling the frequency of Maesteg services is an existing CP5 project. Doubling Ebbw Vale frequency is also likely (be with a Newport service or otherwise). I hope we'll see the Abertillery branch opening during the franchise, but as it requires further infrastructure investment, it might not be included in the initial franchise specification.

As Phillip Phlopp stated up-thread, electrifying the Valleys should be straightforward once the workforce is available. I forget the BCR stated for the project, but it's high, assuming suitable stock is cascadable, and as the route's been resignalled recently there's low risk of mislocated cabling etc. With 67% growth in Cardiff commuter traffic expected by 2023, there's a need for extra rolling stock, sooner than the wires will get there. Additional pacers or converted 230s could bridge the gap equally well, but I'll leave the choice up to the DDA legislators and franchise bidders.

With the slip in the electrification timetable, I'm unsure what the situation with cascaded EMUs will be. Would the mooted 315s still be available/usable? With Northern and TPE's franchises let, there seem to be a lot of 319s going spare, but as mentioned, there are plenty of franchises to be re-let before W&B could contemplate getting them. (And the Valleys have been aiming at 6-car platforms, so they may well need shortening to 3-car.) I don't pretend to have absorbed what the new Northern/TPE franchises mean in terms of available EMUs either. Would finances stretch to using new-build stock from the start?


South West Wales
This seems to me to be a place where bidders could innovate. Fishguard's services are currently what could be wrung out of slack in existing diagrams, and wires going up next door will lead to those diagrams and the services being redrawn completely. Swansea Landore is expected to become a W&B depot for West Wales' DMU maintenance. What should the post-electrification Swanline service look like? Presumably more than the paltry train every two hours currently operated. Would it best be integrated with a Bristol-bound EMU service, or perhaps curtailed to a frequent Swansea-Port Talbot service?

Will services from Northern Pembrokeshire continue to operate through to Crewe/Manchester, or be curtailed at Cardiff? I don't expect that they'd be cut back to the electrification boundary at Swansea: given the political will for having direct services from Holyhead/Wrexham to Cardiff, I doubt if cutting West Wales off would have any backing. As for splitting at Cardiff: is there the capacity to terminate more eastbound and westbound services? It may be easier to keep sending them through, even if there is a limited number of through travellers.

I would consider Gareth Marston's suggestion of express West Wales - Cardiff services via the Swansea District line. I'm not as sure on the bi-mode idea, as it would infer acquiring brand new stock for the job. Let's see what's available from the current 175 fleet and any DMUs released by other franchises.

Linespeed improvements in South Pembrokeshire would be very welcome, as ChiefPlanner said. There'll be need of greater summer capacity with IEPs not going further than Carmarthen.


Mid Wales
There won't be much scope for further improvements to the Heart of Wales line without added subsidy, and I doubt there'll be any forthcoming. We might see some more shuttles at the southern end, but I won't be holding my breath.

Cambrian services are tied to ERTMS-equipped 158s. Given how the fleet is stretched at the moment, units will have to be brought home from other services in North/South Wales to provide growth, or 158s will need to be procured from elsewhere and equipped for ERTMS. (I don't feel that transferring the Shrewsbury-Birmingham portion of the service is viable unless the West Coast franchise starts serving Shrewsbury more regularly, keeping London journeys at one change. Even so, I'm led to believe that having to change for Birmingham would be very unpopular.)

Cambrian mainline services will grow to be hourly as and when rolling stock allows. If Holyhead-Shrewsbury-Birmingham services are rerouted or withdrawn, they may operate through to Birmingham in their absence. Alternatively, continuing to Crewe would be advantageous. (This is assuming, of course, that these lines are not transferred to the West Midlands franchise.)


Marches
The southern end of the "North and West" route should see development as part of the Cardiff Metro area, with a commuter service to Abergavenny (plus station at Caerleon). 2tph between Cardiff and Shrewsbury is a medium term aspiration; Network Rail's indicative service specification suggests supplementing the current 1tph to Manchester and 0.5tph to Holyhead with 0.5tph to Liverpool (via Halton Curve). I prefer this option to upping Cardiff-Holyhead to 1tph, but other voices may win out.

Shrewsbury to Crewe stopper diagrams have recently been combined with Heart of Wales diagrams, giving some through services. I've mentioned reallocating them as continuations of the additional Cambrian Mainline services above, but the service might be reallocated to the LM franchise instead.


North Wales
I'll address the Borderlands line first. Other than specifying a normal bank holiday service, I don't expect any quick changes. Improvements to this line are tied to Merseyrail's plans and aspirations for the future, and the question of electrification (last seen somewhere in the long grass). Were the frequency to be doubled, the use of Shotton as a good interchange station would be viable. Extra mainline stations in the Shotton-Chester-Wrexham area may be desired, given the population of the area.

The current capacity improvements between Chester and Wrexham will be found severely wanting, as 1.5tph(IIRC) isn't going to cut it, given the combination of freight and (desired) passenger services. Moreover, services along the North Wales Coast (and by extension from Chester to Shrewsbury) are going to need some serious evaluation over the next decade, as LNW-GW Joint pointed out. A lot will depend of what the next West Coast franchise intends to do.

I would hope that they will operate a proper bi-hourly service along the coast (to Holyhead/Bangor) allowing a new timetable of local services to be built around them. One potential service list that springs to mind is Holyhead to London 0.5tph, Cardiff 0.5tph, Birmingham (via [stn]SHR[/stn] or [stn]STA[/stn]?) 0.5tph, Liverpool 0.5tph, along with Llandudno to Manchester 1tph. Other flavours are available, of course. 3tph may be excessive at franchise start, but more appropriate come the mid 2020s.


Sunday services to Llandudno Town should be viable after stage 1 of the Coast Line resignalling is done, as there will no longer be the cost of opening Deganwy and Llandudno signal boxes to consider. I don't expect any changes to service frequency on the Conwy Valley, but would hope for some work on flood resilience in the Llanrwst area.

Reopening Bangor-Caernarfon or Bangor-Llangefni remain as wildcard options (both of which I'd welcome) but I don't expect they'd be explicitly included in a franchise tender.


Rolling Stock
The current fleet consists of Pacers (142/143), Sprinters (150/153), Express Sprinters (158), Coradias (175), and some loco-hauled stock to cover a general lack of long-distance DMUs. The Pacers (or 230s) will be needed until Valleys electrification is done, then they'll be scrapped. Newly acquired EMU stock will replace them on local services in the Cardiff area, releasing Sprinters for elsewhere. There may be a business case for new-build EMUs, depending on the sparks effect.

150s will likely need replacing during the course of the franchise. I expect this would be for the franchise bidders to specify, according to what will become available. The 158s will be getting long in the tooth by the end of the franchise, but I don't expect any reference to their replacements will be made in the letting of the franchise. The key objective will be obtaining more ERTMS stock for the Cambrian in the interim, be it by reallocation of existing units or conversion of extra 158s (as mentioned earlier). The 175 will be due a mid-life refurb during the franchise, which gives an opportunity to fit power sockets and please a lot of people.

With electrification of the North Wales Coast Line unlikely to be confirmed before the letting of the franchise (and electrification of the Marches even further away), more long-distance diesel stock will be required. The one thing that seems certain is that the extra stock will be incompatible with the 175s (as all the 180s are spoken for). The settling dust of the Northern and TPE franchise bids reveals that the 185s may be going off lease in the next five years. If not snapped up by others (West Midlands, East Midlands, and Scotrail come to mind) they may be considered. Alternatively, unwanted Voyagers be going cheap. Introducing First Class service on the Cardiff-Manchester route (as well as, of course, Cardiff-Holyhead for political reasons) may be welcomed. Scotland's electrification projects could also provide some DMUs. I don't expect that there'll be the money for new-builds.

I understand that Alstom's lease of the Chester depot (and presumably their contract to maintain the 175s there) expires at or around the end of the current franchise. If the 175 are not tied to Chester in the future, I think they could find themselves in Landore in a decade's time, serving the West Wales routes in their twilight years.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I think many of the plans may be on an "if and what and when it happens" basis especially in view of the fact that so many project timescale take so long to be decided and then slip.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
The advantage of 315s is with the Anglia stock cascades almost the entire fleet is available.
So WG will be able to have almost as many as they want - the leasing on them won't be very expensive as they are for scrap otherwise.
This will enable generous capacity and service provision.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Some points worth considering:
1. Are they planning to use 6 x 23m or future proofing to allow 6 x 23m in the future?
2. A 7 car 31x formation would be sightly shorter than a 6 x 23m formation so a suitable length formation could be formed using old carriages.
3. TPE electrification was originally based on using equivalents to the 380s on North TPE. Now we know they'll be 5 car bi-mode trains ordered.
4. The 345s will have 22m carriages* so they'll be slightly more than 1m shorter than 323 carriages.

* Based on dividing the total length by number of carriages so that doesn't allow for the driving cars being a different length to the centre cars.

There will be some 6 car operation on the Valley Lines when electrified, it's inevitable because of train formations, traffic demands and if it continue, joining/splitting services at Pontypridd.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
I think Swanline will be best with an hourly Cardiff - Swansea service with perhaps an additional service running between Swansea and Port Talbot. Pity there isn't a bi mode veriosn of the class 172's such units would be great for an hourly Swansea - Cheltenham service.

There is scope for many more services along the Ebbw Vale with 2tph from Ebbw Vale and 2tph from Abertilery perhaps with the Ebbw Vale services all running to Newport and the Abertilery services running through to Cardiff and Maesteg. A half hourly Maesteg would help boost the Lynfi valley and improve the situation at Pontyclun particulary at peak times

I do see the west wales services being cut back to Swansea connecting with mainline service to Cardiff with a few GWR services between Carmarthen and London. Perhaps during the summer time if clearance can be sorted a return of the direct London - Fishguard services using 5 carriage IEP's.

The line speed on the Pembroke dock line particulary west of Tenby can certainly do with improving along with a restoration of the passing loop between Tenby and Whitland to improve reliability
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
The advantage of 315s is with the Anglia stock cascades almost the entire fleet is available.
So WG will be able to have almost as many as they want - the leasing on them won't be very expensive as they are for scrap otherwise.
This will enable generous capacity and service provision.

They're life expired - Class 313s going for scrapping in a couple of years, Class 314s going for scrapping in a couple of years, Class 507 and Class 508s going for scrapping when MiseryRail does something other than another review on what to buy.

Class 315s are life expired as it is, they're older than Pacers, they've no regenerative braking capability and no gangways. I just can't see them being anything other than, at best, a very short term stop gap whilst new units are built.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
They're life expired - Class 313s going for scrapping in a couple of years, Class 314s going for scrapping in a couple of years, Class 507 and Class 508s going for scrapping when MiseryRail does something other than another review on what to buy.

Most of the times reports of trains being sent for scrap are gross exagerations.
Do you really want to make the stock shortage worse because you want to turn your nose up at vehicles that may well still be operable for another decade or so?
A-stock was life expired, 315s probably aren't.

Class 315s are life expired as it is, they're older than Pacers, they've no regenerative braking capability and no gangways. I just can't see them being anything other than, at best, a very short term stop gap whilst new units are built.

Define life expired? The 507s that were scrapped had serious corrosion issues, are there reported major corrosion problems with 315s?
Older than pacers hardly means anything - much of the stock on the network is older than Pacers.......
As to the lack of regenerative braking capability, the amount of energy saved by it is nowhere near enough to justify early purchasing of replacement units, its a nice to have - not some kind of major saving by itself. Electricity is cheap.

And gangways.... how often will the Valleys require eight car units?
4 cars is easily sufficient for almost all operations based on historical precedents - a handful of 8 car operations is not enough to justify gangways.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Most of the times reports of trains being sent for scrap are gross exagerations.
Do you really want to make the stock shortage worse because you want to turn your nose up at vehicles that may well still be operable for another decade or so?

Define life expired? The 507s that were scrapped had serious corrosion issues, are there reported major corrosion problems with 315s?
Older than pacers hardly means anything - much of the stock on the network is older than Pacers.......
As to the lack of regenerative braking capability, the amount of energy saved by it is nowhere near enough to justify early purchasing of replacement units, its a nice to have - not some kind of major saving by itself. Electricity is cheap.

And gangways.... how often will the Valleys require eight car units?
4 cars is easily sufficient for almost all operations based on historical precedents - a handful of 8 car operations is not enough to justify gangways.

We're not making stock shortages worse by ordering a new fleet of trains to work the South Wales Valleys though.

315s have significant corrosion issues, it's a common issue with the PEP family as they head towards 40 years old. The Class 315s are a little better, but not much better, just because they're a little younger. There's a good reason why the Mark 3 units are getting new traction equipment and the PEP units aren't - one family can be kept going for 15 or 20 years, one family really is life expired and the end game is now planned out.

The Class 315s won't be able to run as 8 car units without SDO being installed anyway - platform capacity is planned around 6 x 23m formations/units, which is 7 x 20m capable.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
We're not making stock shortages worse by ordering a new fleet of trains to work the South Wales Valleys though.

You do when you scrap all these units and replace them with a bare minimum fleet of new electrics.
You don't really believe you are going to get 40 brand new units do you?
The Class 315s won't be able to run as 8 car units without SDO being installed anyway - platform capacity is planned around 6 x 23m formations/units, which is 7 x 20m capable.

You could just lock the last vehicle OOU on 8-car formations.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
You do when you scrap all these units and replace them with a bare minimum fleet of new electrics.
You don't really believe you are going to get 40 brand new units do you?


You could just lock the last vehicle OOU on 8-car formations.

I don't know how many units the Welsh Government will wish to procure, I just know what the infrastructure is being planned to accommodate and what the passenger numbers are going to be if growth continues.

If Wales really wants to try and meet that demand with Class 315 units, possibly by configuring some as 3 car units and leaving others as 4 car units, it's entirely up to them, but the platforms are being designed for 6 x 23m electric units and we're looking at the Class 323 unit as an example unit to work around.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,126
I note the suggestions to try and speed up journeys between south Pembrokeshire and Cardiff. At present, the journey is so long between Cardiff & Tenby that it really rules out day trips - for most people. (It is much quicker by road). Likewise, the time it takes to reach the Heart of Wales line from Cardiff discourages trips on the southern Wales 'circuit'.

Mention has been made of using the Swansea District Line for some services between west Wales and Port Talbot & perhaps Cardiff. With clever scheduling, perhaps the issues mentioned above could be resolved? At present a person wishing to take the 9.30am northbound HOW from Swansea must depart CDF on the 8.05 HST only to hang around Swansea for 30 minutes. (To reach Llangennech takes just under 2 hours). Compare that with the 10.56 from CDF to Fishguard via the Swansea District which reaches Llanelli in 1 hour (with 1 stop at Bridgend).

So, why do I mention Llangennech? Let us suppose that an express service were to leave Cardiff at about 9.05 for south Pembrokeshire via the Swansea District Line. It would reach Llangennech at about 9.55 - where it could stop to drop off passengers who could be picked up by the 10.01 heading up the Heart of Wales. Thus a whole hour has been knocked off a journey from Cardiff to the Heart of Wales line and this would surely lead to an increase in leisure travel on the southern Wales circuit? But such a schedule produces another bonus - the Heart of Wales train that left Swansea could have dropped off passengers for places in south west Wales at Llanelli. Within a few minutes, the train from Cardiff (via the District Line) - would arrive to pick them up.

Furthermore, by having such scheduling in both directions, it means that people to/from towns such as Ammanford, Llandeilo & Llandovery would have faster links to Cardiff and the east - without losing their direct trains to Swansea. Leisure passengers doing the Heart of Wales circuit in the anticlockwise direction would also save time by not having to go via Llanelli & Swansea. So, everyones a winner and little Llangennech becomes a place to swap passengers.

Consideration might also be given to having new stations on the Swansea District Line at Morriston (M4 J45) & at the new Coed Darcy urban village. Of course, if that were to happen, then it could slow down 'express' services
between Cardiff & Pembrokeshire.
http://www.coeddarcy.co.uk
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
26 wouldn't cover all the diagrams though......the business case on the WG website based on cascaded 313/315's says nearly 40 units are needed.

How many additional services are planned on Valley Lines post-electrification?

ATW use 150s on non-Valley Line services including some in the Northern area of their operations like Borderlands, Conwy, Crewe-Chester and Crewe-Shrewsbury and like I said 26 x 323s would provide the equivalent capacity of all ATW's Pacers and 150s even though all of the latter aren't used on Valley Lines. Although, I accept there's less flexibility with 323s than Pacers and 150s.

As has been said previously Porterbrook want all the 323s in one place so if Wales & Borders want them they will need to be willing to take on all 43 units. 323s are longer than 3 car 313/315s so 43 x 323s is roughly equivalent to 50 x 3 car 315s in terms of capacity.

While I accept 315s might be too old by the time Valley Lines are electrified (with electrification being put back) there will be more 319s available than previously envisaged with Arriva deciding some new EMUs are needed for Northern and it being decided to use 365s and 387s on Thames Valley instead of the originally proposed 319s.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
I think the EMU scene could change by the time the valleys are wired in CP6.

The 315's I don't think will be suitable by the time comes for them to come to the south wales valleys and the 319's whilst being much younger will also be getting on in age by then. As for the class 323's they might be good for the valley lines including the lines to Ebbw Vale, Maesteg and the Cardiff - Swansea swanline service. Perhaps GWR could find use for some emu's around Bristol especially perhaps if they can run 3 or 4tph between Cardiff Central and Bristol TM.

Perhaps by the 2020's we might see southern deciding to order some new emu's so perhaps the class 377's culd me used on the valley lines network the class 377/3's are 3 carriage units so these would be ideal especially as they have gangways.

With Northern likely to be getting new dmu's perhaps something could be looked at for other franchises as the class 150/153's will need replacing after 2025 as they are not getting any younger these days
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
With Northern likely to be getting new dmu's perhaps something could be looked at for other franchises as the class 150/153's will need replacing after 2025 as they are not getting any younger these days

Northern are set to take on additional 150s or/and 153s from GWR (the release makes reference to them taking on DMUs freed up by GW electrification and those will be off-lease as a result of GW electrification.) The new order of DMUs will only indirectly part covers Pacer replacement, the rest and additional units for new services will need inbound cascades from GWR and Scotrail.

Logically there should be an option on the new order for additional DMUs (for either Northern or another operator) and it should be assessed whether that option will be needed before it expires.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Northern are set to take on additional 150s or/and 153s from GWR (the release makes reference to them taking on DMUs freed up by GW electrification and those will be off-lease as a result of GW electrification.) The new order of DMUs will only indirectly part covers Pacer replacement, the rest and additional units for new services will need inbound cascades from GWR and Scotrail.

Logically there should be an option on the new order for additional DMUs (for either Northern or another operator) and it should be assessed whether that option will be needed before it expires.

The cascaded Units market will be so limited it begs the question will WG accept new DMU's for outside the Cardiff travel to work market in addition to the clamour for new EMU's for Valleys lines.
--- old post above --- --- new post below ---
How many additional services are planned on Valley Lines post-electrification?

ATW use 150s on non-Valley Line services including some in the Northern area of their operations like Borderlands, Conwy, Crewe-Chester and Crewe-Shrewsbury and like I said 26 x 323s would provide the equivalent capacity of all ATW's Pacers and 150s even though all of the latter aren't used on Valley Lines. Although, I accept there's less flexibility with 323s than Pacers and 150s.

As has been said previously Porterbrook want all the 323s in one place so if Wales & Borders want them they will need to be willing to take on all 43 units. 323s are longer than 3 car 313/315s so 43 x 323s is roughly equivalent to 50 x 3 car 315s in terms of capacity.

While I accept 315s might be too old by the time Valley Lines are electrified (with electrification being put back) there will be more 319s available than of previously envisaged with Arriva deciding some new EMUs are needed for Northern and it being decided to use 365s and 387s on Thames Valley instead of the originally proposed 319s.

The initial Valley Lines spec has 4 tph Barry Island to CDF, Pensrth to CDF, 2 tph treherbert/Aberdare/Merthyr/ Rhymney to CDF. With additional services 2 tph from Bargoed to CDF and from Pontypridd and Caerphilly to CDF , 2 tph coryton/ city line plus the Bay branch. Maesteg/ Ebbw Vale and SWML extra.
The South Wales Metro now proposes having 4 tph on all lines including Chepstoew and Abergavenny.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
There is going to be a lot of issues with having 4tph on these lines especially through queen Street. They haven't long done the signalling so I wont be surprised to see a lot of portian working splitting and attaching at places like Pontypridd.

I have see a proposed electrification timetable for the valley lines which includes a half hourly Caerphilly - Cardiff - Pontypridd service. Some changes in it include having the Rhymney/Bargoed services running to Barry Island/Bridgend and services from Aberdare/Merthyr running through to Penarth.

At the moment I think the frequency during the daytime is good enough however I do think the early morning and late evening services need improving especially between Barry and Cardiff Central when you have irregular gaps between services.

Ideally trains should be every 30 minutes from 0600-2300.
Minimum frequency on sundays should be hourly on all branches with 1st trains arriving into Cardiff Central around 0830-0845
 

allaction

Member
Joined
27 Sep 2015
Messages
166
Many thanks to all who are taking the time to contribute to this discussion with such interesting posts.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,610
There is going to be a lot of issues with having 4tph on these lines especially through queen Street. They haven't long done the signalling so I wont be surprised to see a lot of portian working splitting and attaching at places like Pontypridd.

I have see a proposed electrification timetable for the valley lines which includes a half hourly Caerphilly - Cardiff - Pontypridd service. Some changes in it include having the Rhymney/Bargoed services running to Barry Island/Bridgend and services from Aberdare/Merthyr running through to Penarth.

At the moment I think the frequency during the daytime is good enough however I do think the early morning and late evening services need improving especially between Barry and Cardiff Central when you have irregular gaps between services.

Ideally trains should be every 30 minutes from 0600-2300.
Minimum frequency on sundays should be hourly on all branches with 1st trains arriving into Cardiff Central around 0830-0845

If the whole thing was recast, could it move to 10/20 minute cycles, rather than 15/30? Hourly on Sunday is also not particularly aspirational - most countries now have Weekend timetables which are the same for Sat/Sun/Hols.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
If the whole thing was recast, could it move to 10/20 minute cycles, rather than 15/30? Hourly on Sunday is also not particularly aspirational - most countries now have Weekend timetables which are the same for Sat/Sun/Hols.

On some lines in Europe they see what we would expect on a Sunday, on a Saturday opposed to vice versa.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
If the whole thing was recast, could it move to 10/20 minute cycles, rather than 15/30? Hourly on Sunday is also not particularly aspirational - most countries now have Weekend timetables which are the same for Sat/Sun/Hols.


Maybe so however have you seen the sunday services we have now even an hourly service would be far better start off small and progress from there
 

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
What astronomical cost ?

The electrification of the Valley Lines together with London to Swansea (as one package) produced a BCR of 4:1, so for every £1 spent, £4 is generated (when calculated over 30 years). That effectively means Welsh Valley electrification would pay for itself within 7.5 years.

The calculations have moved in recent months, as a result of the oil price drop and lower diesel fuel costs for rolling stock, but refusing to electrify the Valley Lines and ordering new diesel stock, rather than electrification and purchasing new electric stock, would be significantly more expensive over 30 years (and electrification doesn't last for just 30 years).

The outline business case says around £306m in capital at 2002 prices. You can safely double that after recent events.

A BCR of 4:1 does NOT mean £4 is generated for £1 spent. Like HS2 the vast majority of benefits are intangible, predominantly value of time saved travelling and lower CO2 emissions. The operational savings don't meet the capital costs even over 60 years, so the 'benefits' are expressed as a ratio to the net costs.

I says if these user benefits actually exist - charge more to use the line. They won't of course, because these benefits don't actually exist.

The cascaded EMU option shows net cash return over 60 years of -£57m (though not with a remotely realistic outlay). It also relies on 'free' cascaded EMUs from the South East, making a massive reduction in operating costs v.s DMUs. The business case shows two other options were considered i) new DMUs immediately (2019) and ii) life extension to 2027 and then new DMUs. Rather misleadingly ii) is shown as the 'do minimum' against which the costs of the others are added.

The new DMUs in cash terms (excluding indirect tax) are only £2m more than cascaded EMUs and if the loss of indirect tax (£19m) is shown as a 'cost' and not a disbenefit, the new DMUs are cheaper. The life extension DMU option comfortably beats both. Then try adding another £300m to the electrification captial costs....
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
If they did the Nantwich passengers would get off at Crewe and get on the next fast service! <D
In any case, good look pathing even more services through platforms 5 and 6 and across all the tracks.

There's a ready-made grade-separated route at Crewe - the Independent Lines.
Needs tying into the old P1/2 island though (now P12)...
Seriously though, if they move the station south for HS2 these things become easier.
 
Last edited:

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
Sunday services to Llandudno Town should be viable after stage 1 of the Coast Line resignalling is done, as there will no longer be the cost of opening Deganwy and Llandudno signal boxes to consider. I don't expect any changes to service frequency on the Conwy Valley, but would hope for some work on flood resilience in the Llanrwst area.

It is staggering that a town the size and importance of Llandudno has no Sunday service in Winter. Is this really the best they can do? How about paying a relative pittance to open the 2 boxes for one shift? If they can open Goonbarrow and Castle Cary - Dorchester on Sundays, then it should hardly be insurmountable.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,486
Location
Powys
It is staggering that a town the size and importance of Llandudno has no Sunday service in Winter. Is this really the best they can do? How about paying a relative pittance to open the 2 boxes for one shift? If they can open Goonbarrow and Castle Cary - Dorchester on Sundays, then it should hardly be insurmountable.

If they want the Boxes open then they have to pay the standard rate for that Box. They cannot pay less; a Grade X Box is a Grade X Box, no matter what day it is.
 

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
If they want the Boxes open then they have to pay the standard rate for that Box. They cannot pay less; a Grade X Box is a Grade X Box, no matter what day it is.

According to ORR, Llandudno gets around 315k footfall per year. Based on around 320 operating days that is more or less 1k journeys per day if you include Deganwy. How much are Network Rail able to get away with charging for a signalbox to open - £200-300 per shift? It really is peanuts in a £10bn industry.

Llandudno is a tourist resort, yet has no Sunday service for most of the year.

Unless I am missing something and there really is no demand for weekend rail travel...
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,486
Location
Powys
According to ORR, Llandudno gets around 315k footfall per year. Based on around 320 operating days that is more or less 1k journeys per day if you include Deganwy. How much are Network Rail able to get away with charging for a signalbox to open - £200-300 per shift? It really is peanuts in a £10bn industry.

Llandudno is a tourist resort, yet has no Sunday service for most of the year.

Unless I am missing something and there really is no demand for weekend rail travel...

You suggested paying "a pittance". That is not applicable, as I have already stated.
And I don't think NR charge individually to keep a signalbox open! If it is deemed necessary by the service then it will be open.
Perhaps you should be asking ATW why they aren't running a service before you criticise the signallers.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
You suggested paying "a pittance". That is not applicable, as I have already stated.
And I don't think NR charge individually to keep a signalbox open! If it is deemed necessary by the service then it will be open.
Perhaps you should be asking ATW why they aren't running a service before you criticise the signallers.

No point in asking ATW. They'll just say it's not in the Franchise.
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
If it isn't a requirement, ATW won't do it. Unless they are paid again by someone :D
 
Status
Not open for further replies.

Top