Nottingham59
Established Member
Going to four tracks all the way between Winsford and Weaver will eliminate point ends at the four places where the current line goes from 4 to 2 tracks and simplifies the signalling.Add ~£1m for every single point end you install, be it new install or relocate existing.
Generally included. The main input to the costs come from here:And you need to not just look at track and earthworks, what about signalling beyond points ? ETCS or clockwork it still costs money and I don't see any of that counted anywhere.
And 25 kV traction power supply ? You go from 2 to 4 track and in practical terms you are at least rebuilding the whole existing lot as well as adding new. Power grid implications ? Additional DNO feeds ? Substations ? You want capacity to carry trains => you need the power, more than there is today.
- East West Rail Central Section options Central section capital cost estimate (14.08.2019) estimated £60m per route km in 2017.
- The cost of HS2 phase 2a is now suggested at £7bn for 59km over open countryside. That's £120m/route km.
My thinking is that the aspects of cost are likely to be much less for new tracks paralleling an existing line, on land that is (mostly) already owned by the railway, than for a new build line such as HS2. Don't you agree?Then consider diversion / protection / mitigation of any water / sewerage / power / gas lines / rivers / streams / etc.
Your new 4 km railway needs all the legal and planning costs not just the civils.
Then on site you find somewhere some form of rare newt species or protected ancient tree.
And then you might get a figure approaching reality => which figure is probably the underlying reason it has not been done to date.
Nice idea, but methinks you are way way off on costs estimate.
But I think the point stands that it would be much cheaper to four track Winsford-Weaver than building an equivalent length of HS2, with a similar capacity uplift.
Anyway, the costs are based on the discussion in this thread:
Cost of new railway lines in 2024
What is the current cost of building a new railway in the UK? I'm thinking about the total cost, not just the civil engineering. There's a number of references I can find. Are there any better sources? East West Rail Central Section options Central section capital cost estimate (14.08.2019)...