A few options I think:
- put a third set of bi directional tracks in the middle of the current tracks - allows extra clearance to the diagonal braces, at the cost of capacity
- require the use of a trolley pole style collector over the bridge, and move the wires more inboard within the bridge.
- Low rigid insulator to push the pantograph down, and require self propulsion.

