Tom Gallacher
Member
I was being sarcastic. Clearly my humour's not for everyone.It's a YX72 plate, VX is a typo.
Last edited:
I was being sarcastic. Clearly my humour's not for everyone.It's a YX72 plate, VX is a typo.
Even two smaller buses find it difficult to pass each other in Drumry Road East. With the amount of cars parked even on the pavement.Just reflecting on what had been discussed about Drumchapel and Drumry Rd East in particular, this would probably be my solution, i would have the M60 continue down it as it does tend to be smaller buses that are used and have the 60 go into the retail park, i get that there is very little demand for this part but it prevents buses running late because of getting caught up on a narrow road etc
I would also have to think that it is a bit of a pain in the backside to try and get doubles through most of the time even though it is managed,
Unrelated to this,, though a similar situation, i have always sort of wondered about the need for so many buses to go up and down Barns St/East Barns St in Whitecrook, i have always thought the 1 services should continue along Dumbarton/Glasgow road into Clydebank to make it that bit more like an express service as most people are going from the town into Clydebank for that section and just have the 2 and the 6 continue to serve this road, although i am aware there are a number of people who use the 1 and get on or off at this road (me being 1 at one point point)
There might be a problem with routing more buses via Glasgow Rd rather than Whitecrook when they open the new bridge. This is bound to clog up with traffic whenever the bridge needs opened for shipping traffic which is predicted to be at least 4 times a day. Each opening and closing takes 45 minutes.Even two smaller buses find it difficult to pass each other in Drumry Road East. With the amount of cars parked even on the pavement.
With the small uptake from there an Avondale every 10 minutes would be more than adequate Letting the 60 and M60 go via the Retail Park. There has been much time lost recently using Drumry Road East then trying to join Great Western Road only to cross to Drumry Road. Timekeeping has been more than poor.
The same could be said for Whitecrook where mostly all services serve Barns Street and East Barns Strett. The exit from Whitecrook Street is delayed by congestion from traffic heading for the Clydrbank Shopping centre. A simple fix would be to send the many 1s via Glashow/Dumbartpn Road. Leaving the 2s and 6s to serve Whitecrook. It's not really rocket science.
Believe the bridge will be at a high level with the acces roads clear of both East Barns Street and Glasgow Road. It has to clear the railway line at Yoker Station.There might be a problem with routing more buses via Glasgow Rd rather than Whitecrook when they open the new bridge. This is bound to clog up with traffic whenever the bridge needs opened for shipping traffic which is predicted to be at least 4 times a day. Each opening and closing takes 45 minutes.
Having said that I guess that a lot of traffic will divert through Whitecrook when this happens anyway so lots more congestion ahead.
It's a swing bridge starting at ground level with the junction at Dock Street. They're putting in warning signs on all the roads telling motorist that there's likely to be congestion. I believe that some of the signs will be as far back as Dumbarton and Anniesland.Believe the bridge will be at a high level with the acces roads clear of both East Barns Street and Glasgow Road. It has to clear the railway line at Yoker Station.
I wonder if any routes will cross this Bridge.It's a swing bridge starting at ground level with the junction at Dock Street. They're putting in warning signs on all the roads telling motorist that there's likely to be congestion. I believe that some of the signs will be as far back as Dumbarton and Anniesland.
![]()
Take a look at plans for the first opening bridge on the river Clyde
If approved, the stunning new bridge could be in place by 2020www.glasgowlive.co.uk
Possibly but there would need to be some sort of exemptions from the timetabling to mitigate against the delays whenever shipping traffic is needing the bridge opened. Unfortunately I think that Barns St will resemble the M25 at times.I wonder if any routes will cross this Bridge.
Given the speed of river traffic it should be possible to provide a 10-15 minutes warning of the bridge opening.It's a swing bridge starting at ground level with the junction at Dock Street. They're putting in warning signs on all the roads telling motorist that there's likely to be congestion. I believe that some of the signs will be as far back as Dumbarton and Anniesland.
![]()
Take a look at plans for the first opening bridge on the river Clyde
If approved, the stunning new bridge could be in place by 2020www.glasgowlive.co.uk
It's not the advance notice of the bridge opening that's the problem, although that in itself will present issues, but the 45 minutes that it will be out of action for. When the first proposal was put out it was envisaged that the bridge would be out of commission for an average of 4 times a day. In an ideal world this would be co-ordinated to avoid closures taking place at peak periods. Unfortunately the tidal nature of the river prevents this. The opening of the new scrapyard at King George V dock now sees ships of up to 70,000 tonnes navigating upriver. If you've ever seen any of these ships you'll know how big they are and they need a high tide to reach their berth. There's also a speed restriction of 5 knots on the river so they're not exactly bombing up the river.Given the speed of river traffic it should be possible to provide a 10-15 minutes warning of the bridge opening.
Doubt there will be that many openings in a Day.
Clydebank badly needs a bus conection to the south side, but a bridge that is going to close for shipping, cant see that happening through delays to timetablingIt's not the advance notice of the bridge opening that's the problem, although that in itself will present issues, but the 45 minutes that it will be out of action for. When the first proposal was put out it was envisaged that the bridge would be out of commission for an average of 4 times a day. In an ideal world this would be co-ordinated to avoid closures taking place at peak periods. Unfortunately the tidal nature of the river prevents this. The opening of the new scrapyard at King George V dock now sees ships of up to 70,000 tonnes navigating upriver. If you've ever seen any of these ships you'll know how big they are and they need a high tide to reach their berth. There's also a speed restriction of 5 knots on the river so they're not exactly bombing up the river.
Vehicular traffic will play second fiddle to marine on these occasions.
It could of course use the Erskine Bridge or tunnel. However nobody seems to be interested in one.Clydebank badly needs a bus conection to the south side, but a bridge that is going to close for shipping, cant see that happening through delays to timetabling
You could possibly run a bus service with a bit of co-ordination between the bus operator and whoever is control of the Clyde navigation these days.Clydebank badly needs a bus conection to the south side, but a bridge that is going to close for shipping, cant see that happening through delays to timetabling
McGills run a service over the Erskine Bridge.It could of course use the Erskine Bridge or tunnel. However nobody seems to be interested in one.
You could possibly run a bus service with a bit of co-ordination between the bus operator and whoever is control of the Clyde navigation these days.
Ships over a certain size (and that means pretty much everything that would require the bridge to open) need to keep the authorities informed of their arrivals and departures - you can't just turn up. With that in mind the bridge controllers will know to within a few minutes of when the closures will need to take place at least a couple of days before they happen. If, and that's a big if, they wanted to be helpful this information could be passed on to the bus operator(s) which would enable them to inform customers of the times to avoid. It's not a perfect solution but as far as I can see it's the only one. At least it would give some semblance of order to the timetabling of any such route(s) over the bridge.
== Doublepost prevention - post automatically merged: ==
McGills run a service over the Erskine Bridge.

It was posted on here about a month ago that Lanarkshire were losing all of their 68 plate E200MMCs including the longer examples to Manchester.In other news, Have been hearing rumours that Overtown depot are losing their short E200mmcs, not sure on numbers and are supposedly getting ex London E200s as replacementsHave heard that E200mmcs were leaving Glasgow to go south so could be these I guess. Anyone heard anything to confirm/deny?
![]()
From what I heard there are only about 9 ex London E200s coming, so there would be enough for one route to lose E200 MMCs at Overtown, which I guess would be the 241 as they seem to have debranded a good few already. No 242s have been done yet and only 1-2 254s. I'm not sure how Overtown could lose them all as I thought Eurocentral required Euro 6 buses?It was posted on here about a month ago that Lanarkshire were losing all of their 68 plate E200MMCs including the longer examples to Manchester.
I think it’s a really bad move considering how much First have modernised Blantyre and Overtown in recent years. Wiping out such a large number of new diesels seems wrong unless something newer is going to replace them. It would be good if some of the E200EVs could replace them at Blantyre/Overtown for Lanarkshire local services and Caledonia/Scotstoun could see some Yutongs but that’s just fantasy!
They were going subject to First winning a franchise in Manchester which by all accounts they haven’t so these should be staying put.From what I heard there is only about 9 ex london E200s coming so would be enough for one route I suppose to lose E200 mmcs at Overtown which I guess would be the 241 as they seem to have debranded a good few already. No 242s been done yet and only 1-2 254s. Not sure how Overtown could lose them all as I thought Eurocentral required Euro 6 buses?
Thanks for confirmingThey were going subject to First winning a franchise in Manchester which by all accounts they haven’t so these should be staying put.
From what I heard there is only about 9 ex london E200s coming so would be enough for one route I suppose to lose E200 mmcs at Overtown which I guess would be the 241 as they seem to have debranded a good few already. No 242s been done yet and only 1-2 254s. Not sure how Overtown could lose them all as I thought Eurocentral required Euro 6 buses?
They were also subject to moving when the 50 E200 EVs to Scotstoun arriveThey were going subject to First winning a franchise in Manchester which by all accounts they haven’t so these should be staying put.
The problem with that, as I see it, is the travel time from Clydebank to Braehead. A service linking Braehead and QEUH could have potential though as long as the timetabling doesn't get screwed up on a daily basis because of the thing that can't be mentioned
== Doublepost prevention - post automatically merged: ==
Yes and it servesi Erskine the airport and Paiskey.
Could of course extend to Braehead or even QEUH too.Replacing their 17 service. However that woukd be joined up thinking no doubt. .
There are plenty of other opportunities with other services like the First 16 that starts from Knightswood and heads to QUEH. It could easily go to Braehead too. For that matter, the Clyebank 81 could do the job too. It just needs somebody in First to have a lightbulb moment.The problem with that, as I see it, is the travel time from Clydebank to Braehead. A service linking Braehead and QEUH could have potential though as long as the timetabling doesn't get screwed up on a daily basis because of the thing that can't be mentioned![]()
The 81 would seem the natural choice for a service to Braehead via Yoker. Anytime I've seen the 16 between Partick and Anniesland it seemed to have good loadings so using this service for a new route would seem a backward step. Only my opinion obviously.There are plenty of other opportunities with other services like the First 16 that starts from Knightswood and heads to QUEH. It could easily go to Braehead too. For that matter, the Clyebank 81 could do the job too. It just needs somebody in First to have a lightbulb moment.
That’s why I said in my last message it was fantasy.No EVs going to Lanarkshire either just now. It does appear older diesel going there which is a step back.
As for Yutongs none are coming to Glasgow. First Aberdeen are due to get these.
Lanarkshire fleet is really great just now, would be a shame for Blantyre or Overtown to lose any Euro 6 vehicles as Lanarkshire no doubt makes the company a good profit.That’s why I said in my last message it was fantasy.
On a separate note I wonder what First’s overall plan would have been regarding a replacement for so many E200MMCs at Blantyre. Without a new order it could only mean a mix of the second hand E200s and possibly E300s from Scotstoun? Glad it’s not happening. Lanarkshire fleet is in a good place right now.
I tend to agree with this as the option to take regarding the 81. The only issue is the fact the route is circular in Duntocher so it would need to be incredibly well timed to keep it reliable. The 16 is such a weird service for me. I've seen it be too full to stop at peak times but in the off peak, I've been the only person on it on multiple occasions.The 81 would seem the natural choice for a service to Braehead via Yoker. Anytime I've seen the 16 between Partick and Anniesland it seemed to have good loadings so using this service for a new route would seem a backward step. Only my opinion obviously.
If you're going to send a bus over the forbidden subject then I think you need to accept that the timetable is just for show - and the traffic commissioners will need to go along with this as well. It's all very fine having a well constructed timetable that is achievable but when you are faced with the problems that any such service may encounter allowances, both logistically and administratively, will need to be made. Not ideal, but at least if the travelling public are aware of this then they can make a choice. What would be a must though is real time information at each stop, not just a notice saying that the timetable is subject to daily amendments. Be honest with your customers and they'll cut you some slack. Try and pull the wool over their eyes and they'll go elsewhere.I tend to agree with this as the option to take regarding the 81. The only issue is the fact the route is circular in Duntocher so it would need to be incredibly well timed to keep it reliable. The 16 is such a weird service for me. I've seen it be too full to stop at peak times but in the off peak, I've been the only person on it on multiple occasions.
I'm surprised it wasn't cut to Partick to Blairdardie to save another bus when Scotstoun seemed to be really struggling for drivers.
I feel like the 77 going back to every 10 minutes when resources allow it will negate the need for the 8 and 16 going to the Queen Elizabeth Hospital if I'm honest although I'd probably cut the 8 first due to the length of the route.
The other thing for me that feels weird is the fact the 34 is the only Queen Elizabeth University Hospital bus from the southside that is fully on that side of the River Clyde. I'm surprised that nothing else was ever tried on top of the 34.
The network around every Glasgow hospital has remained very consistent and unchanged to be fair. Other than the 34A being renumbered recently, there hasn't really been any changes for a long time.
The problem is that the general public are very good at blaming First for what they cannot control. I've seen plenty of people say car congestion making buses late is just "excuses" and that they should be on time regardless of that and roadworks. From my point of view, if someone uses the bus especially for work on a weekly basis then there is no excuse for not understanding the issues any bus company can't control.If you're going to send a bus over the forbidden subject then I think you need to accept that the timetable is just for show - and the traffic commissioners will need to go along with this as well. It's all very fine having a well constructed timetable that is achievable but when you are faced with the problems that any such service may encounter allowances, both logistically and administratively, will need to be made. Not ideal, but at least if the travelling public are aware of this then they can make a choice. What would be a must though is real time information at each stop, not just a notice saying that the timetable is subject to daily amendments. Be honest with your customers and they'll cut you some slack. Try and pull the wool over their eyes and they'll go elsewhere.