freetoview33

Established Member
Joined
24 May 2009
Messages
3,815
Location
West of England
Surely they would use the 5 Class 180 still at First Great Western? As they are not planned to be used once the IEP comes in.

I think the ECML is in a mess with multiple operators and still quite a shocking timetable!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rick1984

Member
Joined
23 Aug 2012
Messages
1,147
From a personal view I'd have the stops Edinburgh, Newcastle, York and Peterborough.

I'm suprised not all trains stop at the last, but realise could be capacity related or the connections aren't as important as I find them.
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,515
Think they are missing a trick not adding a business zone like Chiltern mainline with every seat having a oversized table and free wifi.. .
According to their press release free wifi will be available to all passangers
 

Stats

Member
Joined
27 Sep 2009
Messages
943
But isn't this service pretty much specified by the DfT. I mean, it was in the ITT that one fast path per hour must be left between Edinburgh and London for an OAO. This surely means that it's more than just an attempt at revenue abstraction.
The ITT didn't say that a path must be left for an OAO. The key word in the paragraph swt_passenger quoted was contingency, I.e. a back up plan should an OAO get a path.
--- old post above --- --- new post below ---
Morpeth is a small town. It's not going to grow that much in the next five years.
Its South East Northumberland They are looking at not just Morpeth. If the Government genuinely want to encourage regeneration of the north's economy then they should be supportive of this proposal for an area that has lost its major employer in the last few years and is in need of regeneration
--- old post above --- --- new post below ---
Surely they would use the 5 Class 180 still at First Great Western? As they are not planned to be used once the IEP comes in.
The GW 180s are spoken for , being leased to Grand Central from 2017.
 
Last edited:

Marton

Member
Joined
9 Nov 2008
Messages
665
Morpeth may not be big but it is underserved.

The fact that there is a tight curve and speed restriction also means less time lost than the other stops would.

Will they seek to use the York avoiding line? Quicker than the risk of being held up in the station?
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
I don't think the rules permit this. As I recall, Open Access Operators are obliged to follow the TSA and accept normal tickets, including all ANY PERMITTED-routed tickets for the routes they travel on.

There is a fairly recent historical precedent for single operator tickets on the ECML from Edinburgh.

The near empty Eurostar Connect services that operated down the ECML to Waterloo were excluisvely for the use of Eurostar ticket holders.

It would be particularly convenient (for me) if the service were to stop at whichever station that the E-W link service will eventually reach on the ECML. Or even, using the IC paths on the E-W link, for two 5-car trains to meet at this station then continue as a 10-car formation to Edinburgh. One path, two new opportunities. (Vice-versa for the return journey)

If this is truly designed to compete with the airlines, then I'd be happy if it were to have similar cabin baggage restrictions as the airlines too. I know that many enthusiasts go on and on about the convenience of being able to carry more luggage by train - but hell, too many people carry more luggage on the train than they can possibly manage themselves.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Or lease / buy the spare IC225 sets when VTEC don't want them any more, since the start date is in 2020?

If it where single class then I can see a premier / super 1st class style service being offered by 1st Group, as there will be plenty of Mk.4s to choose from, we could end up with two restaurant cars, with the remainder refurbished to 1st class only and run as a Pullman service, possibly top and tailed by Class 91s and up to 11 carriages long?

I disagree slightly, I thinks you're missing a trick about lack of a DVT being used here that would be handy for the amount of luggage used on Anglo Scottish trains.
 

thetangoman

Member
Joined
26 Feb 2013
Messages
113
Location
Helensburgh
Surely they would use the 5 Class 180 still at First Great Western? As they are not planned to be used once the IEP comes in.

I think the ECML is in a mess with multiple operators and still quite a shocking timetable!

It does state that they are going to use ELECTRIC 125mph units
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,276
Or lease / buy the spare IC225 sets when VTEC don't want them any more, since the start date is in 2020?

If it where single class then I can see a premier / super 1st class style service being offered by 1st Group, as there will be plenty of Mk.4s to choose from, we could end up with two restaurant cars, with the remainder refurbished to 1st class only and run as a Pullman service, possibly top and tailed by Class 91s and up to 11 carriages long?

The quote from First says
brand new, state of the art rolling stock comparable to other trains being introduced on the route
which implies something similar to the Class 801s.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,808
Location
Central Belt
If the want to compete with air, why not run it to Stirling. (Or somewhere theycan stop at Edinburgh Park). However replacing a "Dunblane" stopper would be welcome, shame they won't be running scotrail by then.
 

Stats

Member
Joined
27 Sep 2009
Messages
943
which implies something similar to the Class 801s.
Not just implies it, but the application explicity states
The Specified Equipment is subject to procurement, however, the performance characteristics will as a minimum match the new IEP Class 800/801 trains. The new trains will be electric only, will have 5 coaches (each up to 26m in length) and will be able to run in multiple formation.
 
Last edited:

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
These new units will (if they go ahead) presumably be for delivery at about the same time as Hull Trains EMUs? Might make that order more viable and give both operations a larger pool of units to work from, with the additional resilience that brings.
 

BrianTheLion

Member
Joined
14 Dec 2011
Messages
117
Location
Port Glasgow
Im not sure why Morpeth is even in the equation. It's twice the distance to the Airport from Morpeth as it is from the City Centre?
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,723
Location
Scotland
Im not sure why Morpeth is even in the equation. It's twice the distance to the Airport from Morpeth as it is from the City Centre?
It doesn't make sense to me either, but apparently it does to someone at First HQ.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
Think they are missing a trick not adding a business zone like Chiltern mainline with every seat having a oversized table and free wifi.. Surely most people flying will be for business or connecting flight and I cant see people connecting dragging there luggage on the underground to get to Heathrow so logically you aim to tap into the business market.

Given that it is a single class, they could call it "business class" which would also stop people with standard or first class tickets from using it (potentially getting around the issue of eroding income from stations shared with VTEC).
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Given the DfT / ORR rejected the Platinum Trains bid of 2008, on the primary basis of no available spare paths on the East Coast - surely with no substantial infrastructure changes to increase capacity, this bid should will have to also be rejected otherwise it would create a legal window for the Platinum Trains party to cry foul play.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Given the DfT / ORR rejected the Platinum Trains bid of 2008, on the primary basis of no available spare paths on the East Coast - surely with no substantial infrastructure changes to increase capacity, this bid should will have to also be rejected otherwise it would create a legal window for the Platinum Trains party to cry foul play.

Seven years have past and the timetable recast with this in mind.
 

Oliver

Member
Joined
17 Aug 2007
Messages
477
It doesn't make sense to me either, but apparently it does to someone at First HQ.
If you think of Morpeth as "Newcastle Parkway" for people living in towns north of Newcastle it could make sense.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,808
Location
Central Belt
Given the DfT / ORR rejected the Platinum Trains bid of 2008, on the primary basis of no available spare paths on the East Coast - surely with no substantial infrastructure changes to increase capacity, this bid should will have to also be rejected otherwise it would create a legal window for the Platinum Trains party to cry foul play.

A few upgrades since then taking frieght of the line. Hopefully they have released some paths.

Hitchin flyover
Joint line upgrade
Doncaster North flyover.

For me the most likely areas of delay are Doncaster station and Northallerton- Newcastle. (Mainly regulation) so could still be a challenge. Not much use in getting stuck behind a train stopping at Darlington and Durham and not allowed to pass.
 

Marton

Member
Joined
9 Nov 2008
Messages
665
Not much use in getting stuck behind a train stopping at Darlington and Durham and not allowed to pass.


Darlington not an issue as the station is off the man line. It's what the 0540dep from Edinburgh does to the 0600 step from Berwick every day. Means a 6 minute stop in darlo.

Durham should be ok on the down as there is a loop for platform 2.

So 2 opportunities down but non up before Newcastle.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
There's a substantial number of passengers being missed out from not calling at York. There can't be that much demand for Morpeth. Whichever way you look at it, it's not going to happen.

There may be some merit in running fast to Newcastle, but it does seem a bizarre stopping pattern and, with the fact that VT have stopped sane open access operators before when worried about competition, it seems unlikely to go ahead.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,808
Location
Central Belt
Darlington not an issue as the station is off the man line. It's what the 0540dep from Edinburgh does to the 0600 step from Berwick every day. Means a 6 minute stop in darlo.

Durham should be ok on the down as there is a loop for platform 2.

So 2 opportunities down but non up before Newcastle.

Can't Durham be passed on the up while the train is in the station? I know it never happens now but I am sure it did in the past?

I do find heading north very frustrating on the x00 services, especially when you get held outside Durham because a train is calling there (and the x00 don't)

Most EC services stop at Darlington now, but I do recall waiting outside in the past (and still bypassing the station) waiting for a stopper (then again at Durham) result missed connection (not bitter but we left a York on time and poor regulation cost us 15 minutes)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,937
Location
Mold, Clwyd
Quite a big commitment to order new 125mph stock for an open access service

Alliance (ie DB) are proposing much the same ECML service as First, with new Pendolinos.
It will be interesting seeing how ORR judge the two OA applications.
Now we are at the beginning of the VTEC franchise period it gives everybody scope for a long-ish term licence.
Will they let both OA operators in (sharing the paths).
Three competing ECML operators would be fun.
 

ash39

Established Member
Joined
8 Feb 2012
Messages
1,524
A lot of people totally missing the point I feel. What's the point in stopping at York or Doncaster if trying to compete with air? I live in York and don't know a single person who would contemplate flying to London or Edinburgh. Everyone already gets the train, the existing Virgin one.

The unique aspect of this idea is the fact it's non stop most of the way (and why Morpeth makes sense). I still don't see it happening though.
 

Stats

Member
Joined
27 Sep 2009
Messages
943
The unique aspect of this idea is the fact it's non stop most of the way
Hardly unique when both Alliance Rail and Virgin Trains East Coast have both applied to run London to Edinburgh services calling only at Newcastle as well. The unique part of FirstGroup's calling pattern is that it calls at Morpeth.
 

ash39

Established Member
Joined
8 Feb 2012
Messages
1,524
Hardly unique when both Alliance Rail and Virgin Trains East Coast have both applied to run London to Edinburgh services calling only at Newcastle as well. The unique part of FirstGroup's calling pattern is that it calls at Morpeth.

By unique I meant relative to what currently exists!

Using the avoider at York has to be worth investigating. Always wondered why the Flying Scotsman never makes use of this, surely it's worth a minute or two off the journey and can't be that much route learning to undertake.
 

Jonny

Established Member
Joined
10 Feb 2011
Messages
2,577
Can't Durham be passed on the up while the train is in the station? I know it never happens now but I am sure it did in the past?

There is an up passenger loop at Durham but this does not cover the station. There is only a single up track available now (whereas the down platform is on a loop); it might have been different in the past though.
--- old post above --- --- new post below ---
Besides, all stations should have decent local services before open access operators are allowed on the line. This affects my home town (Chester-le-Street), and many stations in Northumberland have it even worse.
 

glbotu

Member
Joined
8 Apr 2012
Messages
644
Location
Oxford
The up loop is mostly used for looping freight trains. Someone here may be know better, but won't increasing TPE Liverpool - Newcastle to 2tph result in 1tph at Chester-Le-Street (as opposed to its current 1tp2h)?

North of Newcastle only Manors, Cramlington, Morpeth and Alnmouth get anywhere near a decent service (of around 1tph), although based on relative populations, there aren't that many people living there:

Wikipedia Lists:

Pegswood: c3000
Widdrington: c2700
Acklington: <500
Chathill: Unlisted

Compared to

Chester-Le-Street: c24000.
Morpeth: c14000
Cramlington: c39000

You can see why a greater service is not really required (although, i'd suggest Cramlington and Chester-Le-Street are underserved).
 