Wondering if the fire fighting effort included spraying water on the adjacent areas of the station roof to keep it cool?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

35B

Established Member
Joined
19 Dec 2011
Messages
5,362
Wondering if the fire fighting effort included spraying water on the adjacent areas of the station roof to keep it cool?
Drainage would be a factor. After the York Minster fire, many cathedrals reassessed their fire safety and found that water pooling in the vaulting was one of the biggest risks.

Winchester cathedral has some very fetching polystyrene plugs in the base of each fan vault that will release if there’s a certain weight of water, preventing it bringing the whole structure down
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,302
Location
Somerset
Drainage would be a factor. After the York Minster fire, many cathedrals reassessed their fire safety and found that water pooling in the vaulting was one of the biggest risks
Though water landing on the outside of a station roof is what said roof is built to cope with. The vaulting of a church is not designed to be exposed to the elements.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,398
Location
Northampton
WCRC Thunderbird been in station overnight and removed two Pendolinos and a TPE unit to Polmadie.
So that means there are 8 units remaining, all ScotRail, unless they've managed to get any of those out and I've missed something.
Traksy only shows 7 platforms occupied (3, 6, 9, 10, 12, 13, 14)

Just speculating but maybe one was a 156 that could leave on its own power?
Split thread discussing the recovery here: https://www.railforums.co.uk/threads/57314-moving-stranded-trains-out-of-glasgow-central.299609/
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,362
Though water landing on the outside of a station roof is what said roof is built to cope with. The vaulting of a church is not designed to be exposed to the elements.
Up to a point - that water has to be able to go somewhere, and if it cannot, then you have to consider whether the structure can carry that weight. And, unlike snow, that weight is liable to be highly concentrated.
 

realemil

Member
Joined
14 Feb 2021
Messages
470
Location
Glasgow
I have just seen photos of the area, and the firefighters are still at the scene drowning the area with water, with a fair amount of smoke still coming out.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Though water landing on the outside of a station roof is what said roof is built to cope with. The vaulting of a church is not designed to be exposed to the elements.

Water landing on the station roof from clouds is very different to water landing on it from high pressure fire hoses.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,886
Location
Fenny Stratford
The fire brigade are going to be on site damping down for a while - that is fairly standard for such a big fire surely?
 

realemil

Member
Joined
14 Feb 2021
Messages
470
Location
Glasgow
My partner just snapped this photo from Renfield Street, looks like more fell down compared to some of the earlier photos. I wonder if they’ll want to pull it all down before opening the station?

Photo shows image of the destroyed building, with water being sprayed down towards it
 

Attachments

  • lp_image.jpeg
    lp_image.jpeg
    491 KB · Views: 667

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,819
Location
Clydebank
The fire brigade are going to be on site damping down for a while - that is fairly standard for such a big fire surely?
Yep, pretty standard for major blazes like this. Added caveat being the epicenter of this one being a store filled to the brim with lithium batteries. Yeah, they're gonna be continuing to drown this one for a while. Better safe now than very sorry later.

@realemil Pulling it down before it falls down of it's own accord, a full inspection (structural, electrical systems and so on) of the station and conducting any repairs as needed, and draining any and all floodwater before even a partial reopening is considered. In most reopening scenarios, the Ayrshire/Inverclyde side of the high-level station is the most likely to return to use first given it's distance from the fire. Whenever that may be.
 
Last edited:

Warrior2852

Member
Joined
27 Oct 2018
Messages
315
NRE now confirming Central remaining closed until at least end of Wednesday, with beyond that still seeming likely as there's no reopening estimate.
We have no estimate on when the station will reopen. We expect disruption to continue on routes to / from / through Glasgow Central until at least the end of the day on Wednesday 11 March.
 
Last edited:

d70g

Member
Joined
12 Nov 2020
Messages
69
Location
Paisley
Latest BBC update has the structural integrity of the remaining facade (facing Gordon Street) compromised, which isn't really a surprise.

https://www.bbc.co.uk/news/articles/cvgjqzl7wrzo

Scotland's busiest station remains closed following a huge fire that destroyed a neighbouring building.

Glasgow Central Station has been shut since Sunday, when a blaze spread from a vape shop on Union Street through a B-listed Victorian building.

The remaining facade of the building is now in a state of "ongoing and uncontrolled collapse", according to the city council.

Network Rail said its staff and fire service teams were continuing to work on the site and disruption to rail services was expected to "continue in the coming days".

That suggests demolition as soon as the hoses are turned off - not that easy in such a built-up area, which implies Central won't reopen anytime soon.
 

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,819
Location
Clydebank
The rest of this working week and well beyond that, it's looking increasingly likely. Especially given what's just been reported by the BBC and quoted by @d70g above me. Not surprising in the slightest. Soon as the hoses are off, and it's deemed safe to do so, demolition time. Which ain't going to be easy given how built-up the area is.

Oh, what a sorry mess this is. The absolute last thing Glasgow needed was a kick to the economical groin of this size and scale.
 

matchmaker

Established Member
Joined
8 Mar 2009
Messages
1,868
Location
Central Scotland
Plenty of Road over Canal bridges in Birmingham have FireBrigade access hatches built into them to provide quick access for suction hoses if required

== Doublepost prevention - post automatically merged: ==


And the fact that water from fire fighting will probably be contaminated with carbon debris
I've mentioned the Cheapside Street fire of 1960. At that time, Glasgow Fire Brigade had a fireboat "St Mungo". It was used to feed water from the Clyde to 31 hoses for fighting the fire. It could draw 32 tons of water per minute from the river. Had it not been available it is possible that the public water supply would have been inadequate for fighting the fire.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,169
Latest BBC update has the structural integrity of the remaining facade (facing Gordon Street) compromised, which isn't really a surprise.

https://www.bbc.co.uk/news/articles/cvgjqzl7wrzo



That suggests demolition as soon as the hoses are turned off - not that easy in such a built-up area, which implies Central won't reopen anytime soon.
I've seen demolition taking place very close to roads with traffic and pedestrians flowing normally. Recent example on Newport Road which I rode past dozens of times. I can see the Gordon Street entrance being shut for a while but it's not immediately obvious why the other entrances couldn't operate as normal.
 

Warrior2852

Member
Joined
27 Oct 2018
Messages
315
I can see the Gordon Street entrance being shut for a while but it's not immediately obvious why the other entrances couldn't operate as normal.
There might be a capacity problem - the other two usable entrances on the west side are significantly smaller than the Gordon Street one so there could easily be a bottleneck problem in the peaks - particularly the Low Level ticket hall entrance at the Argyle Street corner with the narrow escalator up to High Level.
 

deerokus

Member
Joined
30 Sep 2024
Messages
45
Location
Glasgow
There might be a capacity problem - the other two usable entrances on the west side are significantly smaller than the Gordon Street one so there could easily be a bottleneck problem in the peaks - particularly the Low Level ticket hall entrance at the Argyle Street corner with the narrow escalator up to High Level.
Definitely a major issue. They could I suppose open up the old vehicle entrance which goes up to platforms 12/13 etc.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
There might be a capacity problem - the other two usable entrances on the west side are significantly smaller than the Gordon Street one so there could easily be a bottleneck problem in the peaks - particularly the Low Level ticket hall entrance at the Argyle Street corner with the narrow escalator up to High Level.
I expect that capacity will be a major consideration. The last thing anyone wants is too many people trying to pile through too small a doorway. Similar reasons that Covent Garden Underground station is closed at certain times.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,169
There might be a capacity problem - the other two usable entrances on the west side are significantly smaller than the Gordon Street one so there could easily be a bottleneck problem in the peaks - particularly the Low Level ticket hall entrance at the Argyle Street corner with the narrow escalator up to High Level.
Plenty of London stations have bottlenecks in the peaks. For example, in the morning peak there is usually a crowd waiting for the down escalator opposite platform 1-5.
 

Warrior2852

Member
Joined
27 Oct 2018
Messages
315
Plenty of London stations have bottlenecks in the peaks. For example, in the morning peak there is usually a crowd waiting for the down escalator opposite platform 1-5.
Here the bottleneck of people trying to get into the station up that escalator very quickly would lead onto a very busy crossroads road junction if it got too busy from the extra Gordon Street and Union Street traffic being redirected, there's not far from the entrance to the escalators at all.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
I don't think I'd overstate the complexity of demolition based on Ayr or anything like that. That was an ownership issue, not a complexity of demolition issue.

If you look at a Streetview of it the road is wider than the building is tall, so pulling it down towards the road, with suitable boarding on the buildings on the opposite side, should not be too onerous compared to e.g. taking down Grenfell Tower.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,886
Location
Fenny Stratford
Looking at the pictures it is very lucky, imo, that the fire didn't spread to the station or the hotel. The fire brigade have done a very good job in stopping that from happening.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
There's a new report from the BBC about the condition of the station after the fire, and it looks optimistic that the station itself has not been seriously damaged,
Scotland's busiest railway station remains closed following a huge fire that destroyed a neighbouring building – but appears to have avoided any major damage in the blaze.
Glasgow Central Station has been shut since Sunday, when a blaze spread from a vape shop on Union Street through a B-listed Victorian building.
Network Rail said its staff and fire service teams were continuing to work on the site and disruption to services is expected to continue for the coming days.
However, BBC Scotland News understands Network Rail staff believe there has not been serious damage inside the station, which they have now been able to visit following the fire.
Engineers at the rail operator also believe the station concourse is in good shape and have also visited the nearby Caledonian Chambers building, which apparently has not suffered major damage either.
A fire break between the Union Corner building - which was destroyed in the blaze - and the external wall of the station is thought to have stopped Sunday's inferno spreading further.
The report states that signalling and overhead wires are controlled away from Central station.
From the sectional appendix the signalling is controlled from the West of Scotland SCC (Cowlairs), and the OHLE from Cathcart ECR, well away from the fire.
 
Last edited:

d70g

Member
Joined
12 Nov 2020
Messages
69
Location
Paisley
I don't think I'd overstate the complexity of demolition based on Ayr or anything like that. That was an ownership issue, not a complexity of demolition issue.

If you look at a Streetview of it the road is wider than the building is tall, so pulling it down towards the road, with suitable boarding on the buildings on the opposite side, should not be too onerous compared to e.g. taking down Grenfell Tower.

At risk of going off topic, there is a big difference between controlled demolition and tackling the remains of a building that (judging by Glasgow City Council's comments) could come down at any moment. Demolition plans take time (I expect engineers have been studying what services - gas mains especially - lay beneath Gordon/Union Street, for example), securing the site takes time, whilst I probably wouldn't be too keen to be boarding up shopfronts on the other side of the road whilst there's significant risk of further collapse.
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,392
There's a new report from the BBC about the condition of the station after the fire, and it looks optimistic that the station itself has not been seriously damaged,
Massive credit has to go to the fire service for saving the station. When I went to bed on Sunday evening it looked, to my untrained eye, that we'd be lucky to have Central still standing on Monday morning.
 

Clydeflyer

Member
Joined
4 Aug 2019
Messages
51
Looking at the pictures it is very lucky, imo, that the fire didn't spread to the station or the hotel. The fire brigade have done a very good job in stopping that from happening.
In the absence of a 'Like' button, hear hear! I reckon the city is lucky today that the station and the hotel and the building above the Union Street entrance are largely intact. A blaze that size could have jumped walls and fire breaks and the fact that it was contained to the one building is a credit to the crews who responded.

"Citizen Firefighter" already stands in Gordon Street honouring the city's fire crews past and present. I reckon there should be something now placed on the station concourse that acknowledges and gives thanks that all that the visitor to the station/city sees as they stand there... the roof, the architecture, etc.. are only there thru the efforts of Scottish Fire and Rescue's crews who responded and the support services (rail industry and otherwise) that backed them up that day.
 

Spsf3232

Member
Joined
21 Apr 2016
Messages
405
Location
Glasgow
Best case scenario is once the scene is handed back from the fire service and to here is no structural damage with heat then some sort of controlled reintroduction of services to Central is undertaken on a reduced service to limit passenger numbers using Hope Street and Argyle Street entrance.

Its going to take a while to demolish the building at Gordon street and make that entrance safe for use again along with any damage done to the Hotel and Station on that side with smoke damage being the major factor at the very least
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
I don't think I'd overstate the complexity of demolition based on Ayr or anything like that. That was an ownership issue, not a complexity of demolition issue.

If you look at a Streetview of it the road is wider than the building is tall, so pulling it down towards the road, with suitable boarding on the buildings on the opposite side, should not be too onerous compared to e.g. taking down Grenfell Tower.

Indeed, there isn't a huge amount left to take down either, looking back a few weeks and I know it was on a much smaller scale, but what was left of Primrose Hill was being demolished next to the live WCML.

The clean-up and safety inspections may take a while though.
 

deerokus

Member
Joined
30 Sep 2024
Messages
45
Location
Glasgow
When large, old buildings like this catch fire do the fire service have enough capacity in terms of both equipment and water availability to be able to extinguish the fire before it gets out of control ? If not, do they concentrate on saving the adjoing buildings?
In this case they had to pump water from the Clyde. In a place without a massive river nearby, definitely not.

Very interesting and eye-opening article about the shop where it started and fire safety enforcement generally.

 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,657
Location
SW London
In most reopening scenarios, the Ayrshire/Inverclyde side of the high-level station is the most likely to return to use first given it's distance from the fire. Whenever that may be.
Also a higher priority froma customer service perspective as there is no alternative route (unlike from the SW via Motherwell and the Argyle Line)
 