According to the Freedom of Information request from Jan 2011, there are thirteen LM class 150's still to find a home for. Does anyone know if a decision has been made on these yet?.
Latest info gleaned from various forums, etc appears to be that of the 35 LM units (72 coaches, 2x 3 cars and 33 2-car), 18 2 car to Northern, 11 2-car to FGW (was 9, but 2 extra 150/2s now allocated) with possibly 3 or 5 staying with LM - total 34, leaving the only non-allocated unit as the toiletless 150/2 pair or 57209/212.
--- old post above --- --- new post below ---
It would seem to make sense to me to send eight of these 150's to FGW to replace the eight class 143's that they have and then send those eight to Arriva Trains Wales. They then would hold all twenty three of that class.
Arriva Wales could then start the process of cascading their 142's to Northern, so that Northern can hold all the 142 stock. This would leave Arriva with seven 142's. If you take into account that Arriva Wales are also receiving two class 150's back from FGW and that LM could send them the remaining five class 150's still to allocate, then that would leave Arriva Wales in a position to send the remaining 142's to Northern.
This would leave all 143's with Arriva and all 142's and 144's with Northern. Northern could use the extra stock to further strengthen services whilst taking one or two (poorest condition) 142's from service to act as cost saving spare parts supplies.
Quite agree on such a plan, the idea of concentrating similar units with the smallest number of operators surely makes sense in terms of cost control. The anomaly I like to quote are the 10 400hp Perkins 158s (863-872) - 10 non-standard units spread across 3 operators...! 5 with FSR, 4 with EMT and 1 with NOR.
This re-shuffle because of the LM 172 is the chance to do this, with FGW receiving more 150s instead of Northern getting them, 143s off to ATW and some movement of 150s or 153s to ATW from NOR allowing all the 142s to head north. Northern suffer because of perhaps lower quality stock, but gain in overall numbers and as you say, some relief in sight as the NW electrification plans start to deliver within 5 years.