Steve Harris
Member
I'm a little confused by your first statement. You say that Platform 7 and 8 are built on where the goods roads used to be and then go on to say the carriage sidings (which became the reception roads) used to be between the goods roads and the station. Therefore your statement is incorrect by your own admission. Because P7&8 are in fact where reception roads 1-4 used to be. The line through P7 is still on the same alignment as what was reception road 1.Yes. I'm old enough to remember when the goods roads were roughly where the platform 7 and 8 island is now.
There were big changes in the early 1980s when power signalling was installed. This included a small bit of platform being built over what used to be tracks when the south end of platform 1 was straightened. The carriage sidings, which were between the station and the goods roads, were replaced by reception roads, though, after electrification, these were mainly used for stabling EMUs. It all changed again when platform 7 and 8 were built, and is expected to change again for East West Rail.
== Doublepost prevention - post automatically merged: ==
That would be the sidings which led to a grain terminal. That track certainly wasn't a running line.Platform extension at Sandy built literally over the tracks
Last edited: