Examples of Platforms built out over old tracks

Status
Not open for further replies.

Steve Harris

Member
Joined
11 Dec 2016
Messages
1,199
Location
ECML
Yes. I'm old enough to remember when the goods roads were roughly where the platform 7 and 8 island is now.

There were big changes in the early 1980s when power signalling was installed. This included a small bit of platform being built over what used to be tracks when the south end of platform 1 was straightened. The carriage sidings, which were between the station and the goods roads, were replaced by reception roads, though, after electrification, these were mainly used for stabling EMUs. It all changed again when platform 7 and 8 were built, and is expected to change again for East West Rail.
I'm a little confused by your first statement. You say that Platform 7 and 8 are built on where the goods roads used to be and then go on to say the carriage sidings (which became the reception roads) used to be between the goods roads and the station. Therefore your statement is incorrect by your own admission. Because P7&8 are in fact where reception roads 1-4 used to be. The line through P7 is still on the same alignment as what was reception road 1.

== Doublepost prevention - post automatically merged: ==

That would be the sidings which led to a grain terminal. That track certainly wasn't a running line.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,402
Location
The Fens
I'm a little confused by your first statement. You say that Platform 7 and 8 are built on where the goods roads used to be and then go on to say the carriage sidings (which became the reception roads) used to be between the goods roads and the station. Therefore your statement is incorrect by your own admission. Because P7&8 are in fact where reception roads 1-4 used to be. The line through P7 is still on the same alignment as what was reception road 1.
Reception roads 1-4 only existed after the early 1980s resignalling.

They replaced carriage sidings and the goods roads.

This shows the Cambridge South track plan in 1965:


Scheme Plan for Cambridge South dealing with the closure of the LNWR line to Sandy/Bedford and Oxford dated bonfire night 1965.
And here is a picture:


Cambridge Station Panorama - British Railways c1960​


A bit out of focus but interesting nonetheless. The photographer and date the photo was taken are unknown. A digitally restored image from an original negative in my collection.​

 

Steve Harris

Member
Joined
11 Dec 2016
Messages
1,199
Location
ECML
Reception roads 1-4 only existed after the early 1980s resignalling.

They replaced carriage sidings and the goods roads.

This shows the Cambridge South track plan in 1965:



And here is a picture:

Well, your obviously thinking that platforms 7&8 take up a lot more space than they actually do.

Compare the 2008 https://maps.app.goo.gl/qqsQYhgf7GMgzuF46
with the 2014 https://maps.app.goo.gl/CXBFJYUyph9FAunn7 image and using the lighting columns as a reference along with the links you provided you can clearly see that the platforms have been built on the old alignment of reception roads 2&3 (/carriage sidings 2-4).*

And btw going back further in history than 1980 doesn't change the facts. Quite a few readers will never have been around to know anything other than reception roads. I'm old enough to have seen them both as carriage sidings and reception roads and have travelled on them hence why I queried your statement as it is false (google streetview doesn't lie I'm afraid).

* For those not familiar with Cambridge looking left to right in the 2008 street view image you have platform 1, through road, reception roads 1, 2, 3 and 4 (all electrified) and then you have the entrance line to what was Cambridge goods yard (now Cambridge carriagesidings south). If anyone is in further doubt about the layout please refer to Trackmaps.
 
Last edited:

Transilien

Member
Joined
10 Mar 2024
Messages
753
Location
Ayrshire
Kilmaurs, platform built over the northbound trackbed.

Glasgow Queen Street Low Level used to have 4 platforms. The outer two tracks were removed and the platforms extended over where they used to be.
When was this done at Glasgow Queen Street Low Level?
 

adc82140

Established Member
Joined
10 May 2008
Messages
3,412
Farnborough. Platforms 1 and 2 were both extended over up facing bays in the 1960s.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,402
Location
The Fens
Well, your obviously thinking that platforms 7&8 take up a lot more space than they actually do.
The reception roads 1-4 took up a lot more space than what they replaced.

In particular, the gap between the through line and reception road 1 is very wide to accommodate signals, overhead line supports and various other lineside equipment. There was also a wide gap between reception roads 2 and 3.

It isn't just a matter of counting tracks.

The platform 7 and 8 island is necessarily wide to accommodate the footbridge. Note that on the old station side platform 5 had to be truncated to accommodate the footbridge, and that also qualifies as a bit of platform built out over old track.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,692
Location
2 miles and 50 years away from the Longmoor Milita
Liverpool Street platforms 17/18. The original P 17 was built over to use the tracks of P18, which then became P17.
And, on the opposite side, platforms 1 and 2 used to be through lines, descending and curving sharply to a junction with what are now the Circle, Hammersmith & City and Metropolitan lines.
The mainline station's platform 1-2 end, concourse and LU booking hall area are where the old through lines ran.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
If you go back far enough there used to be a track crossing the concourse at Waterloo, going over the bridge (which is still there) to link with Waterloo East.
 

Steve Harris

Member
Joined
11 Dec 2016
Messages
1,199
Location
ECML
The reception roads 1-4 took up a lot more space than what they replaced.

In particular, the gap between the through line and reception road 1 is very wide to accommodate signals, overhead line supports and various other lineside equipment. There was also a wide gap between reception roads 2 and 3.

It isn't just a matter of counting tracks.

The platform 7 and 8 island is necessarily wide to accommodate the footbridge. Note that on the old station side platform 5 had to be truncated to accommodate the footbridge, and that also qualifies as a bit of platform built out over old track.
We can argue till the cows come home, but as a family member has worked on the permanent way at Cambridge (and ive actually travelled down them) The reception roads broadly take up the same space as the carriage sidings did (4 v the previous 5), and as you point out that there is a big gap between rec 2 and 3 which means that the new platforms can't be sitting on the goods lines alignment.

As for counting lines, I dunno where you get that from. Just because I didn't want to break trackmaps/Quails copyright by posting a pic of the relevant diagram I politely pointed out what was what for the people who have never been to Cambridge. Afterall, this forum isn't just for Cambridge citizens.

But we will end it there as we are drifting OT.
 
Last edited:

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,498
Location
Northern England
I think there some examples of former island platforms on the Northern Line in London, which were widened by rerouting one of the running lines into a separate tunnel with a new platform, and then extending the original platform over the disused trackbed.
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
985
Location
Eaglesham
Platform 3 at Queen Street High Level, used to be 3 tracks between platforms 2 and 3, what is now platform 3 Road was a carraige siding. Think there are a couple of new platforms at Edinburgh Waverley built on thd site ofvold sidings
 

150219

Member
Joined
24 Nov 2009
Messages
471
Well the one that immediately springs to mind for me is Birmingham Snow Hill, although there was a 15 year gap when there were no trains (or tracks). I'm assuming that the current Platforms 2 & 3 roads are on the site of the former through roads while the platforms themselves are on the sites of the platform roads.
Yes, you're spot on there.
 

Old Yard Dog

Established Member
Joined
21 Aug 2011
Messages
1,823
The current Bradford Interchange/Exchange and Bradford Forster Square stations are smaller and further out of town than the originals.

So I suspect that the current platforms may overlap the alignments of some of the original tracks but cannot be sure.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
The current Bradford Interchange/Exchange and Bradford Forster Square stations are smaller and further out of town than the originals.

So I suspect that the current platforms may overlap the alignments of some of the original tracks but cannot be sure.
I think it's reasonable to say that Forster Square is a wholly separate development; see the National Library of Scotland map at https://maps.nls.uk/geo/explore/sid...97&lon=-1.75229&layers=168&right=GoogleSatHyb.

It looks like there was a lot of redevelopment of the lines into the old Exchange station, so difficult to see what was what, when. https://maps.nls.uk/geo/explore/sid...10&lon=-1.74968&layers=260&right=GoogleSatHyb
 

CarltonA

Member
Joined
22 Apr 2012
Messages
877
Location
Thames Valley
Slough platform five was extended over the up relief about sixty years ago. Prior to that there was a through road. That explains why there is a fairly modern canopy in front of the nineteenth century original.
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
458
I think it's reasonable to say that Forster Square is a wholly separate development; see the National Library of Scotland map at https://maps.nls.uk/geo/explore/sid...97&lon=-1.75229&layers=168&right=GoogleSatHyb.

It looks like there was a lot of redevelopment of the lines into the old Exchange station, so difficult to see what was what, when. https://maps.nls.uk/geo/explore/sid...10&lon=-1.74968&layers=260&right=GoogleSatHyb
If you use the Georeferenced Maps viewer on the NLS website and use the slider for the transparency you can see the underlying image through the old Ordnance Survey mapping, it is a lot easier than comparing the image and map side by side:
https://maps.nls.uk/geo/explore/#zoom=17.4&lat=53.79058&lon=-1.75006&layers=168&b=ESRIWorld&o=26

For Bradford Interchange - on this site: http://disused-stations.org.uk/b/bradford_exchange/index.shtml there is photograph of the throat of Bradford Exchange in June 1973: http://disused-stations.org.uk/b/bradford_exchange/bradford_exchange_old1.jpg which confirms that at least some of the Bradford Interchange platforms were built where the lines into the old Exchange station used to go.

At Forster Square the new platform 0 looks as though it might cover the western most platform of the old station.
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,568
Location
Surrey
Are there any examples of this between West Croydon (apart from the bay already mentioned previously) and Wimbledon. With the conversion of this route twice, from Surrey Iron Railway to LBSC/LSWR etc and then to Tramlink, along with the closure of the Merton Abbey loop, it does seem likely. Anyone know of any?
 

steamybrian

Established Member
Joined
26 Nov 2010
Messages
2,003
Location
Kent
Are there any examples of this between West Croydon (apart from the bay already mentioned previously) and Wimbledon. With the conversion of this route twice, from Surrey Iron Railway to LBSC/LSWR etc and then to Tramlink, along with the closure of the Merton Abbey loop, it does seem likely. Anyone know of any?
Merton Park tram stop is built on the former junction with the line to Merton Abbey/Tooting.

Waddon Marsh tram stop "may" have been built on sidings to the former gas works but it will need further investigation to clarify.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,642
Location
Hampshire
Maybe less a platform extended out but both Plymouth and Newton Abbot have had platforms filled in or cut. Newton Abbot once had two through roads where the entrance and car park is now, whilst Plymouth had two through platforms cut and two bay platforms created when the access from the main entrance to Platform 4 / 3 was created.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
The London end of Derby station was re-aligned so the platforms are now where the tracks from platforms 3-6 used to be.

Ely station platform 1 was built out over the platform loop to face the former through road, so the canopy is well back from the edge (apologies if already mentioned).
 

RDP

Member
Joined
1 Jan 2023
Messages
97
Location
Kent
When the south island platform at Folkestone Central was abandoned in order to divert the up line into what used to be the down fast the north island was built out over the old formation at the east end it not being possible to slew the track before the station due to the presence of the bridge over Cheriton Road and the line being on an embankment leading to Foord Viaduct. This problem did not exist over the former four track section west of the station where the present up line resumes the previous up slow alignment before reaching Folkestone West.
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
985
Location
Eaglesham
Another Scottish example is Hamilton Central, The station used to have four lines running through between two platforms. The central two through lines were removed in the 1950s. The Glasgow bound platform is an original with the Motherwell bound platform a replacement built approximately where the southbound through line ran in preparation for electrification in the 1970s.
 
Joined
1 Feb 2018
Messages
132
When the south island platform at Folkestone Central was abandoned in order to divert the up line into what used to be the down fast the north island was built out over the old formation at the east end it not being possible to slew the track before the station due to the presence of the bridge over Cheriton Road and the line being on an embankment leading to Foord Viaduct. This problem did not exist over the former four track section west of the station where the present up line resumes the previous up slow alignment before reaching Folkestone West.
Do you know how far it was built out? Had a look on Google maps and I can clearly see how the line is slewed as you describe, but from pictures it doesn't look like the platform was built out, looks like still space to reinstate up fast if they wanted.
 