Perhaps it’s just me, but that 360 is a Royal Blue colour, but I thought EMT had opted for a purple colour, as per its website
Is the intention to paint different fleets different colours ?
Been said elsewhere that the Class 360s are being uprated for 110mph.
I know this, but when in 12 carriage formation will they be limited to 100mph like the GWR 387s when they run as 12 car units?The Class 360s will run at 110mph between Corby and Bedford but are limited to 100mph between Bedford and St Pancras.
That all rather depends on the speed limits listed in the Sectional Appendix. I wouldn't expect it to change until the OLE is upgraded to cope with 3 pantographs at speeds of over 100mph too.I know this, but when in 12 carriage formation will they be limited to 100mph like the GWR 387s when they run as 12 car units?
I think the discussion on the electrification established that the new OLE north of Bedford is designed and tested for three pans at 110mph (or two at 125mph). I guess the same will apply further south, but not until the upgrade is completed.That all rather depends on the speed limits listed in the Sectional Appendix. I wouldn't expect it to change until the OLE is upgraded to cope with 3 pantographs at speeds of over 100mph too.
I think the discussion on the electrification established that the new OLE north of Bedford is designed and tested for three pans at 110mph (or two at 125mph). I guess the same will apply further south, but not until the upgrade is completed.
I know this, but when in 12 carriage formation will they be limited to 100mph like the GWR 387s when they run as 12 car units?
Reading the Western SA, Table D2A (Pages 498O & 499), 387s are restricted to 100mph no further west than Stockley Bridge Jn, which must mean the limitations are part of the legacy Mk3 OLE still in place.I read it in another thread - it said something about restrictions being in place for 12 car 387s meaning they can’t operate above 100mph. I doubt the same will happen for the 360s though if they’re supposed to keep similar to Meridian timings.
== Doublepost prevention - post automatically merged: ==
360103 has now been delivered to EMR.

Reading the Western SA, Table D2A (Pages 498O & 499), 387s are restricted to 100mph no further west than Stockley Bridge Jn, which must mean the limitations are part of the legacy Mk3 OLE still in place.
View attachment 85733
Looking at a drivers' eye view of the GWML, the Mk3c(?) OLE has in parts been superseded by mechanically independent structures, particularly at crossovers (Acton East nr Ealing Bway, Southall East, Southall West, Hayes East), which represent a bigger dewirement risk than "open route" OLE. Overlaps also represent a significant risk, but not as much as crossovers; overlaps have a 250mm contact wire height difference (and 460mm contact stagger difference), while crossovers' stagger separation varies with the point opening value.Discussion in this (admittedly) old thread mentions the 100mph restrictions in 12 car formation, but also does note that particular restriction may be removed in the future
Can anyone clarify the above @Clarence Yard?True as that all is, the 100mph 12 car restriction did seem to be universal by my reading, meaning even the super duper Series 1 kit west of Stockley Bridge wasn't up to scratch! It was suggested in that thread that it needed some time to bed in (!) before doing 110mph 3 pantograph operation. It'd be handy if one of those in the know at GWR could confirm the current situation
Slough to Twyford is 12 miles 45 chains, I believe, so with a 7min timing, that gives an average speed of around 108mph. Certainly substantially over 100mph, anyway.1D90 is usually a 12-car 387 and it is timed 7 minutes from passing Slough to passing Twyford. I am not a performance expert, but a back of an envelope calculation suggests that this is more than 100mph?
Realtime Trains - 1D90 1643 London Paddington to Didcot Parkway
Realtime Trains provides live realtime running information for the Great British railway network using open data.www.realtimetrains.co.uk
Even if a schedule says 100mph some drivers probably push it a little further to say 102 perhaps?The schedule says its timed at 110mph if it was 100mph maximum speed it would have been timed at 100mph surely?
A GWR acquaintance of mine (who I know is passed out on 387s) said that the limit was removed for 3x 387 at 100mph last year, including east of Stockley. I suspect that has something to do with the fact that all the crossovers on the Mains (at linespeeds above 100) are now independently registered east of Stockley.Slough to Twyford is 12 miles 45 chains, I believe, so with a 7min timing, that gives an average speed of around 108mph. Certainly substantially over 100mph, anyway.
Even if a schedule says 100mph some drivers probably push it a little further to say 102 perhaps?EMR drivers of the 360's will probably do this without knowing as the cab will be much quieter than a 222!
Fair enough, I was only joking!absolutely not, speeding is taken very seriously. There may be a slight discrepancy between the OTMR, the TMS and the physical Speedo and there may be brief lapses in concentration but very few drivers would intentionally speed.
Hopefully it will come as I am going to see it today!The last movements over the past few days have been running with little to no issues so hopefully today’s will be the same.
Yesterday’s move was a bit annoying - instead of going through the main platform at Cricklewood it went through the side track with fencing next to platform 1Hopefully it will come as I am going to see it today!Does anyone know which unit it will be yet?
Wonder if West Hampstead TL will be a better choice to avoid this from happening?Yesterday’s move was a bit annoying - instead of going through the main platform at Cricklewood it went through the side track with fencing next to platform 1![]()
I'll stick with Cricklewood then. Is the fence on p1 high as if the train does go behind it can it still be photographed?I’ve been to Cricklewood the past few days as the locos will be going slower to get into the depot, but I’m not sure - depends on timings against the Thameslink services as well because it’ll be going through the slow lines.
What I did (at the last minute!) was go to the end of platform 1 towards Cricklewood sidings and managed to get a good enough shot of the drag. But it depends again on which platform it eventually goes through.I'll stick with Cricklewood then. Is the fence on p1 high as if the train does go behind it can it still be photographed?