EGIP timeline

Status
Not open for further replies.

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Take the Glasgow Airport extension, which Network Rail took forward themselves

Im not sure what you mean by that as GARL was never taken forward. Are you referring to the Paisley Corridor Improvements? I'm sure they're being funded by Transport Scotland.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
Im not sure what you mean by that as GARL was never taken forward. Are you referring to the Paisley Corridor Improvements? I'm sure they're being funded by Transport Scotland.
Yes, the PCI, Transport Scotland completely dumped GARL, so Network Rail took the remaining parts of the scheme forward themselves (Glasgow Central platforms, signalling, and electrification improvements)
edit :
All that Transport Scotland funded at the outcome was the Environmental Assessment
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
One of the contacts at Network Rail advised me of this, this morning :
http://www.transportscotland.gov.uk/news/Edinburgh-Glasgow-Rail-Improvement-Programme
"The project will cut 10 minutes from journey times between Scotland’s two major cities and will deliver wifi availability on all trains on the route by the end of next year"
He advised there is no chance of the Falkirk High electification being completed by the end of next year

It's clever drafting just to get "end of next year" into a sentence including "electrification" to confuse the unwary.
I bet he means it's wifi that comes next year, with no particular date on electrification.
Scotland evidently has it's fair share of "Sir Humphreys".
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
It's clever drafting just to get "end of next year" into a sentence including "electrification" to confuse the unwary.
I bet he means it's wifi that comes next year, with no particular date on electrification.
Scotland evidently has it's fair share of "Sir Humphreys".

It certainly confused BBC Radio Scotland, on the day of the announcement they were reporting it as electrification by the end of next year.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
It certainly confused BBC Radio Scotland, on the day of the announcement they were reporting it as electrification by the end of next year.

Sadly it seems to be standard for press releases/ announcements to deliberately give the impression that *more* will be happening, due to carefully worded announcements. Like when we all thought that George Osbourne had announced electrification from Manchester to Sheffield in the Budget. He hadn't, he'd listed "Manchester to Sheffield" right after mention of electrification elsewhere. Then there's no hurry for them to "correct" the positive false impression that the media report on because it's bought them free publicity - cynical world
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
An interesting article about the apparent plan now not to electrify the Falkirk Grahamston loop
http://www.heraldscotland.com/comme...who-are-driving-rail-planning-policy.18090259

At one stage the Scottish Government was held in high esteem throughout the UK as being an organisation that was keen to support public transport and re-open and electrify railway lines when no other part of the UK was doing the same.

However I this this esteem is gradually wearing away with first EARL, then GARL, then Edinburgh trams and now a scaled down EGIP; things don't look as rosy as they once did. How much better it would have been had EGIP been fully thought through in the first place and then just announced as what they will do rather than all this chopping and changing with all the resultant confusion it is now causing.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
But at least the A9 is getting daulled
A long time overdue in comparison to the A90, and to other major trunk road projects which were completed within the last 20 years
Equally, a knee jerk reaction and brought forward a few years, after a recent number of deaths; however we can't compare deaths on the road to a few minutes cut off a rail journey, along with increasing demand for rail services

My solution would be to apply a 40mph speed limit on the A9, between Perth and Inverness!
That would put all vehicles to the same speed limit (ie the HGV)
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Whilst the cut to EGIP is disappointing we have to acknowledge that savings had to be made somewhere. The Scot Govt has to balance it's books and it has no borrowing powers other than PFI/RAB. Taking a wider view, the money saved on EGIP means that other transport schemes will survive, ie. M8/M73/M74 Improvements, Borders Rail, Glasgow Subway upgrade and Aberdeen Bypass. Most of the recent infrastructure investment has been in the Central Belt: M74 Completion, M80, Forth Crossing, Airdrie-Bathgate, PCI, Edinburgh Trams, so it's only fair that Aberdeen and the Borders get to keep their schemes.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
Paisley Canal to be electrified by December ? Really
Yes, very achievable
Unlike other schemes which have included line improvements and resignalling, this is just a relatively simplified electrification between Corkerhill and Paisley Canal
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
But at least the A9 is getting daulled
Not due for completion until 2025 though and there may well be a change of government before then so I'm not certain it will actually be done. Many times large schmes have been announced and then canelled a few years later. It also requires funding to be available. The SNP also announced a plan to dual the A96(T) from Aberdeen to Inverness by 2030 last year but again it's a long time ahead and I'm not sure this will be done. For all we know the roads coudl be very quiet in 20 years with most people having switched to public transport.
--- old post above --- --- new post below ---
My solution would be to apply a 40mph speed limit on the A9, between Perth and Inverness!
That would put all vehicles to the same speed limit (ie the HGV)
Or you could just introduce a no overtaking rule on the single carriageway sections which would effectively result in all traffic restricted to 40 mph when behind a truck but would allow higher speeds when there is a clear road.
 
Last edited:

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Not due for completion until 2025 though and there may well be a change of government before then so I'm not certain it will actually be done. Many times large schmes have been announced and then canelled a few years later. It also requires funding to be available. The SNP also announced a plan to dual the A96(T) from Aberdeen to Inverness by 2030 last year but again it's a long time ahead and I'm not sure this will be done

Sadly the A1 dualling seems to be off the agenda, despite an improved link to England potentially being a big boost for the Scots economy. The fact that the Morpeth - Berwick stretch would have to be paid for by England (and the Berwick - Dunbar stretch by Scotland) is presumably a big reason in both sides' reluctance to get their wallets out.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
Not due for completion until 2025 though
The A9 upgrade has been brought forward by three years, now due for completion no later than 2022
A new scheme at Aviemore has also now been included
A further southbound overtaking lane scheme has now been cancelled and the dualling will commence instead
--- old post above --- --- new post below ---
Sadly the A1 dualling seems to be off the agenda, despite an improved link to England potentially being a big boost for the Scots economy
This has been one of the slowest improvement schemes to progress, although it is better now than it was 20 years ago
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Sadly the A1 dualling seems to be off the agenda, despite an improved link to England potentially being a big boost for the Scots economy. The fact that the Morpeth - Berwick stretch would have to be paid for by England (and the Berwick - Dunbar stretch by Scotland) is presumably a big reason in both sides' reluctance to get their wallets out.
Morpeth to Felton and Adderstone to Belfrord were planned back in 2002 but in 2006 the government decided that the A1(T) north of Newcastle was a route of regional and not national importance and so it had to be funded by the regional funding allocation for the North East where it would compete against public transport and local road schemes. The North East regional assembly did not consider it to be a regional priority and so the upgrade was cancelled. The road has now been reclassified from regional to national importance but there simply isn't any funding these days. Even the Leeming to Barton upgrade to motorway was cancelled due to lack of funding back in 2010. As you suggest, I doubt the Scottish or UK governments would want to dual their parts to the border without a commitment that the rest will be done.
--- old post above --- --- new post below ---
A new scheme at Aviemore has also now been included
I believe the section you are referring to is the new Kincraig to Dalraddy scheme which will start in 2015. Luncarty to Birnam is also planned for 2017. According to this document recently published by Transport Scotland though: http://www.transportscotland.gov.uk...erth_to_Inverness_-_Programme_-_June_2012.pdf the upgrade will indeed start early but is still not due for completion until 2025.
 
Last edited:

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
the upgrade will indeed start early but is still not due for completion until 2025
Equally, the entire route upgrade may not actually be completed for many, many years after that...
Parallels there to EGIP; plan, phase change, swap

Ironically, the short dual carriageway section to the north of Pitlochry was recently downgraded from 2 lanes to 1 lane
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Equally, the entire route upgrade may not actually be completed for many, many years after that...
Parallels there to EGIP; plan, phase change, swap
Indeed, I'm not convinced it will ever get done.
Ironically, the short dual carriageway section to the north of Pitlochry was recently downgraded from 2 lanes to 1 lane
I can't find any reference to to the reduction of the Killiecrankie section to one lane in each direction. I'm suprised that no announcement was made.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
I can't find any reference to to the reduction of the Killiecrankie section to one lane in each direction. I'm suprised that no announcement was made.
It would appear you've got the wrong location as the Killiecrankie Dual Carriagway starts several miles later (starts northbound with a separated parking bay)
It is the short dual carriageway section to the north of Pitlochry, merge junction with A924, next to Loch Faskally
Google Street view still shows the previous road layout

There have been many such reductions over the years without any announcement
However a change to the Traffic Order was applied in 2010 and implemented late in 2011
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
It is the short dual carriageway section to the north of Pitlochry, merge junction with A924, next to Loch Faskally
Yes, I see where you are talking about now, sorry for the confusion.
 
Last edited:

170401

Member
Joined
9 Feb 2010
Messages
252
How many units are going to be released when the 2014 electrification part is finished?

I'd be surprised if it was more than a dozen. 10 Are required for the E&G's increased to 16 at peaktimes. I dont think you could say the whole 16 will become surplus as they are made available through tightened diagrams/maintainance periods/interworking etc. The Cumbernauld line, if its only electrified to Cumbernauld, will yield 1, maybe 2 if the Motherwell service is included.

I suspect they will want to keep as many as possible for improvements elsewhere and if anything some 156s will go.
 