East-West Rail (EWR): Consultation updates [not speculation]

Status
Not open for further replies.

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
Could be worse I once had to set in motion the building of a new sett for a dead badger.
For some strange reason it never moved in.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
Agreed. Whenever a reversal is involved, for me it's a different service.

When the Central section is built, I'm interested to see what happens in Bedford as a reversal will just be silly, but the cheapest so I should expect it I suppose

Northampton would need a reversal too surely and we have done that debate to death.

All trains that go to London do a reversal. Even all Electric trains that go to Bedford do a reversal. Its quite a common thing for trains to reverse. I think the point being here is that you might have to do it more than once.

I wouldn't use Northampton main station. I would create 2 new platforms on a different alignment headed towards Olney, but still within the town centre.

The line would miss Bletchley completely and head north to MKC. Thats my circular. You could have variations of the circular.

Lets say MKC is the starting point of main circular train -

MKC - Wolverton - Northampton - Olney - Bedford - Marston vale stop if any > MKC


A more outwardly circular -

MKC > Wolverton > Northampton > Olney > Bedford > Marston Vale stops if any > Bletchley > Bicester > Oxford > Reading

Reverse of the above.

Or Reading to Reading

Reading > Oxford > Bicester > Bletchley > MKC > Wolverton > Northampton > Olney > Bedford > Marston Vale stop if any > Bletchley > Bicester > Oxford > Reading



For me that is a comprehensive rail option.


When the East side is done, the same can be done there too.

Bedford > Cambridge > Ely > Peterborough > Leicester > Bedford


Before you argue this is all pie in the sky. I know that. But if railways are to be a viable option in my neck of the woods, these options need to be made a reality. If people would have left railways alone in the 60's this would have been easily implemented now.

And if you wanted to huge circular east to west from Norwich/Ipswich to Reading that could be done as well.
 
Last edited:

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
All trains that go to London do a reversal. Even all Electric trains that go to Bedford do a reversal. Its quite a common thing for trains to reverse. I think the point being here is that you might have to do it more than once.

I wouldn't use Northampton main station. I would create 2 new platforms on a different alignment headed towards Olney, but still within the town centre.

The line would miss Bletchley completely and head north to MKC. Thats my circular. You could have variations of the circular.

Lets say MKC is the starting point of main circular train -

MKC - Wolverton - Northampton - Olney - Bedford - Marston vale stop if any > MKC


A more outwardly circular -

MKC > Wolverton > Northampton > Olney > Bedford > Marston Vale stops if any > Bletchley > Bicester > Oxford > Reading

Reverse of the above.

Or Reading to Reading

Reading > Oxford > Bicester > Bletchley > MKC > Wolverton > Northampton > Olney > Bedford > Marston Vale stop if any > Bletchley > Bicester > Oxford > Reading



For me that is a comprehensive rail option.


When the East side is done, the same can be done there too.

Bedford > Cambridge > Ely > Peterborough > Leicester > Bedford


Before you argue this is all pie in the sky. I know that. But if railways are to be a viable option in my neck of the woods, these options need to be made a reality. If people would have left railways alone in the 60's this would have been easily implemented now.

And if you wanted to huge circular east to west from Norwich/Ipswich to Reading that could be done as well.

it is even worse than pie in the sky! It is never going to happen and is barely worth shooting down as it is so outlandish and would be a staggering waste of public ( or even private!) money.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
Did we discuss the Technical Summary report Network Rail published in July anywhere? Apologies if so.

Link via http://www.networkrail.co.uk/east-west-rail/ look for Technical Summary Report – July 2016 on the right, or direct (<1MB.)

I think this is the forecast report whose non-appearance was being discussed in March, around post #559, but only from the perspective that it was unlikely to be published in May as had been reported, and would probably be around July.

Looks like the post was on the money then...
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
I think this is the forecast report whose non-appearance was being discussed in March, around post #559, but only from the perspective that it was unlikely to be published in May as had been reported, and would probably be around July.

Looks like the post was on the money then...

Bedford Parkway and a relocated Sandy it is, then! A BCR of 1.70-2.04 isn't amazing, though.

Also looks like and Cambridge-Birmingham (and possibly Cambridge-Manchester) services are on the table
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Did we discuss the Technical Summary report Network Rail published in July anywhere? Apologies if so.

Link via http://www.networkrail.co.uk/east-west-rail/ look for Technical Summary Report – July 2016 on the right, or direct (<1MB.)

Thanks very much. Having read it, the problems of integration with other services at Bletchley (or MK) and Bedford still seem to me an irritating problem, not so much at Sandy, which is not a major destination in its own right but an interchange.

Our colleague MarkyT had a good idea for Bedford. What to do at Bletchley still escapes me, given the report's revelation of major benefits for direct Cambridge to Brum and Manchester services, or fast interchange at Bletchley / MK. Why didn't they just build Milton Keynes with Bletchley at its centre? Bletchley centre was practically demolished anyway.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
Why didn't they just build Milton Keynes with Bletchley at its centre? Bletchley centre was practically demolished anyway.

When MK was planned, railways were deemed to be old and slow, and the future was going to be the private car. The main station wasn't built until more than a decade after the first developments.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
When MK was planned, railways were deemed to be old and slow, and the future was going to be the private car. The main station wasn't built until more than a decade after the first developments.
Thanks, I'd forgotten the sequence. Whatamistakeatamakea. Could there not be a triangular arrangement at Bletchley?
 

Blamethrower

Member
Joined
13 Oct 2014
Messages
384
Location
Bedfordshire
The key enabler here is Bedford.

Not a fan of Bedford Parkway, not a fan of relocated St Johns (as I've said quite a few times)

MarkyT indeed had the best idea by a mile
For me, the only other option is up and round the top of Bedford, which someone said wasn't possible for some strange non-reason

Surely they should be looking at Bedford stations options more closely than the actual corridors because they either become enabled or disabled depending on the choice of station site/orientation
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
Thanks, I'd forgotten the sequence. Whatamistakeatamakea. Could there not be a triangular arrangement at Bletchley?

not without vast demolitions, land purchases and serious ground works
--- old post above --- --- new post below ---
When MK was planned, railways were deemed to be old and slow, and the future was going to be the private car. The main station wasn't built until more than a decade after the first developments.

but the station is well placed for the business districts/ large office blocks.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,301
Location
East Midlands
Have a quick glance through the technical summary it appears that the favoured route (C2-2) would not give any eastbound connection from Bedford Midland. If Bedford was not to be part of a through route I'd hoped that at least some trains from the West would reverse a Bedford Midland and continue East, but it look like that's not possible with the chosen route. Or am I missing something?
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
Have a quick glance through the technical summary it appears that the favoured route (C2-2) would not give any eastbound connection from Bedford Midland. If Bedford was not to be part of a through route I'd hoped that at least some trains from the West would reverse a Bedford Midland and continue East, but it look like that's not possible with the chosen route. Or am I missing something?

I would guess that if there is no chord (which the diagram doesn't necessarily rule out) to allow east west running via Bedford Midland then given the new southern station one possible option could be to run a metro service linking the existing stations with the new. With the new station possibly being used as a park and rail site (as there is a southern park and ride site at Bedford anyway).
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
The key enabler here is Bedford.

Not a fan of Bedford Parkway, not a fan of relocated St Johns (as I've said quite a few times)

MarkyT indeed had the best idea by a mile
For me, the only other option is up and round the top of Bedford, which someone said wasn't possible for some strange non-reason

Surely they should be looking at Bedford stations options more closely than the actual corridors because they either become enabled or disabled depending on the choice of station site/orientation

If you'd actually read the document you'd see they'd considered various Bedford options, including the one you suggest, and the one selected has the highest BCR.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,726
Location
Nottingham
but the station is well placed for the business districts/ large office blocks.

MK station is very well placed right at the centre of MK. The problem is that it isn't well placed for the railway network. Hence the suggestion that MK should have been centred on Bletchley station instead.
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
it is even worse than pie in the sky! It is never going to happen and is barely worth shooting down as it is so outlandish and would be a staggering waste of public ( or even private!) money.

You've never EVER said what railway venture you would spend any money on.

Now to read the article before I go putting my foot in it.
--- old post above --- --- new post below ---
By Bedford parkway I assume this means out in the fields somewhere?

I would prefer the old St johns back.

Here is my preference
bdm_zpsadb1nxlk.jpg


A is car park, accessed from Cauldwell St. Old St Johns access from London road could still be used if walking.

B is station (where it used to be).

Gold area connecting A and B is a path (some of which already exists).

But it sounds like a parkway means somewhere east of Kempston retail park around the A6.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,279
MK station is very well placed right at the centre of MK. The problem is that it isn't well placed for the railway network. Hence the suggestion that MK should have been centred on Bletchley station instead.

That wouldn't have worked very well in terms of creating a 'new town' though, would it? You know, with an old railway town in the middle of it... The point of the masterplan was to fill the gap between Wolverton and Bletchley. Go south of Bletchley and you run into the Woburn Estate, which might have proved a tad controversial as a development site.

The people planning MK weren't overly interested in the railways, even though the WCML ran slap bang through the middle, but that disinterest extended to other aspects of transport, with no decent roads almost to this day out of the town in any direction other than on the same London-Northampton-Midlands axis as the WCML. Even traffic using the A421 to Bedford was still being funnelled into a single carriageway on the edge of MK until recently.

Nor were the railways (and their paymasters in Government) overly interested in what role the railways might play in MK's future either, managing to withdraw the Oxford-Bletchley-Bedford-Cambridge service just as construction of the first part of the new town was getting under way, even though the roads between Oxford, Bicester, Aylesbury and Milton Keynes and on towards Cambridge were no great shakes - and still aren't. Even first generation dmus would still be quicker than driving to this day.
 
Last edited:

D869

Member
Joined
6 Feb 2014
Messages
59
Did we discuss the Technical Summary report Network Rail published in July anywhere? Apologies if so.

Link via http://www.networkrail.co.uk/east-west-rail/ look for Technical Summary Report – July 2016 on the right, or direct (<1MB.)

Spending £1000 million on a new line from Bedford to Cambridge with no direct connection between the two cities is nonsensical. A north-to-east curve south of Bedford is not mentioned with option C2-2 and looks to be difficult.

Option C1-9 via Bedford Midland is the best. No need for separate Oxford-Bedford or Bedford-Cambridge services and some of the extra time taken by serving Bedford Midland could be saved by getting rid of the split-level ECML interchange station in the middle of nowhere, in fact a complete waste of money wherever it might be. A north-to-east curve near the ECML crossing would be much more useful.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
Spending £1000 million on a new line from Bedford to Cambridge with no direct connection between the two cities is nonsensical. A north-to-east curve south of Bedford is not mentioned with option C2-2 and looks to be difficult.

Option C1-9 via Bedford Midland is the best. No need for separate Oxford-Bedford or Bedford-Cambridge services and some of the extra time taken by serving Bedford Midland could be saved by getting rid of the split-level ECML interchange station in the middle of nowhere, in fact a complete waste of money wherever it might be. A north-to-east curve near the ECML crossing would be much more useful.

I'm with you on C1-9 and the proposed ECML middle of nowhere station, but for me the answer is still to serve new parallel platforms at St Neots station. It's unfortunate they haven't considered that option as the costs of relocating Sandy station will naturally count against C1-9, favouring the predetermined preferred scheme of C2-2.

Also, looking at the maps you can see the ludicrousness of the diversion required to skirt around the should-never-have-been-built southern section of the Cambridge guided busway. It's a bus - divert it onto the roads and it'll save the creation of a bottleneck south of Cambridge with three lines funnelling into a very short section of track, and even if the WAML section does get 4 tracked, Harston to Shepreth won't be. As an added benefit, it will then eliminate the height-restricted section of the busway, so double deckers could then run throughout. ;)
 
Last edited:

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Have a quick glance through the technical summary it appears that the favoured route (C2-2) would not give any eastbound connection from Bedford Midland. If Bedford was not to be part of a through route I'd hoped that at least some trains from the West would reverse a Bedford Midland and continue East, but it look like that's not possible with the chosen route. Or am I missing something?

I think you may have glanced too quickly. C1-1 was favourite.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
The people planning MK weren't overly interested in the railways, even though the WCML ran slap bang through the middle, but that disinterest extended to other aspects of transport, with no decent roads almost to this day out of the town in any direction other than on the same London-Northampton-Midlands axis as the WCML. Even traffic using the A421 to Bedford was still being funnelled into a single carriageway on the edge of MK until recently.

It still ends up as a single carriageway before you reach the M1 - just slightly shorter than the old one. The 40mph temporary speed limit during the works did more to resolve traffic congestion than just shunting the bottleneck slightly down the road.
--- old post above --- --- new post below ---
I'm with you on C1-9 and the proposed ECML middle of nowhere station, but for me the answer is still to serve new parallel platforms at St Neots station. It's unfortunate they haven't considered that option as the costs of relocating Sandy station will naturally count against C1-9, favouring the predetermined preferred scheme of C2-2.

Also, looking at the maps you can see the ludicrousness of the diversion required to skirt around the should-never-have-been-built southern section of the Cambridge guided busway. It's a bus - divert it onto the roads and it'll save the creation of a bottleneck south of Cambridge with three lines funnelling into a very short section of track, and even if the WAML section does get 4 tracked, Harston to Shepreth won't be. As an added benefit, it will then eliminate the height-restricted section of the busway, so double deckers could then run throughout. ;)

Unfortunately, a radiotelescope, the M11 and the well-patronised Trumpington Park & Ride also foul the original Sandy alignment into Cambridge, no just The Busway.
 
Last edited:

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
Unfortunately, a radiotelescope, the M11 and the well-patronised Trumpington Park & Ride also foul the original Sandy alignment into Cambridge, no just The Busway.

I seem to recall reading that the radio telescope isn't an issue any more as they have a new one, are happy to move or something along those lines (I think one article said they have been greatly downgraded in the last 10 or so years as better telescopes elsewhere have supplanted them). Bridging the M11 isn't an issue (and it actually looks like there may already be one in place, but the imagery has too much vegetation to tell.), and as for the Trumpington P&R...imagine how well it would do with a station providing a fast, direct service to both the central Cambridge station as well the new Cambridge North station for the science park.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
I seem to recall reading that the radio telescope isn't an issue any more as they have a new one, are happy to move or something along those lines (I think one article said they have been greatly downgraded in the last 10 or so years as better telescopes elsewhere have supplanted them). Bridging the M11 isn't an issue (and it actually looks like there may already be one in place, but the imagery has too much vegetation to tell.), and as for the Trumpington P&R...imagine how well it would do with a station providing a fast, direct service to both the central Cambridge station as well the new Cambridge North station for the science park.

People would prefer the bus. Unlike the train, it actually takes you into the City Centre of Cambridge at a higher frequency than the train could provide (and people would just drive round the M11 and A14 to get to the Science Park)
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
People would prefer the bus. Unlike the train, it actually takes you into the City Centre of Cambridge at a higher frequency than the train could provide (and people would just drive round the M11 and A14 to get to the Science Park)

Rail park and rides are still useful. Oxford Parkway has exactly the same issue, and yet was still built.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,279
Rail park and rides are still useful. Oxford Parkway has exactly the same issue, and yet was still built.

I'm not sure you can usefully make any comparison between Trumpington - designed to get people into central Cambridge - and Oxford Parkway, built by Chiltern to attract people travelling out of Oxford on a train to London (and in future to Milton Keynes etc). It just happens to be next door to the Water Eaton bus park-and-ride site, which was also built there because it's a strategic location close to key roads.

Even when trains can reach Oxford station from Parkway, I'd expect most park-and-riders heading into Oxford will still go on a bus, as the faster rail journey will be counterbalanced by the need to then walk between the station and the centre, and, as observed by Ianno87 in the case of Cambridge, the higher frequency of the buses.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
For people who've just turned up and can't follow the route discussion, here's the three key maps/tables, and the whole of page 19:
4. CONCLUSIONS FROM PHASE 2b ANALYSIS

94. The conclusion from the analysis undertaken to date is that the EWR-CS is technically feasible and would generate significant benefits for the local regional and national economies.

95. EWR-CS has clear potential to develop into a viable scheme and economic analysis suggests that Corridor C performs better than Corridor M for the following reasons:
  • Corridor C provides higher benefits and revenue
  • Corridor C requires lower operating costs due to lower mileage
  • There is no capital cost advantage of Corridor M over Corridor C.

96. Test on long distance service options suggests running Cambridge – Birmingham or Cambridge - Manchester services is unlikely to boost the overall case for EWR CS because the additional operating costs outweigh the additional benefits and revenue. There is scope however for investigating other ways of realising some of these benefits by using lower cost interventions.

97. Diversion of existing passengers away from London radial routes onto East West Rail services, and the resulting revenue loss on existing radial services is now understood to be a minor impact. As a result, the level of crowding relief on these radial routes is very limited.

98. There is a high likelihood of EWR services generating an operating surplus.

99. The best performing routing option (C2-2) achieves a BCR of between 1.4 and 1.5, exclusive of Wider Economic Benefit (WEBs). Adjusted to include WEBs, this increases the BCR for option C2-2 to over 2.0, which falls into the Department for Transport’s “high value for money” category.
Of note, the intial costings are about £1.5-£2bn, and going via Hitchin/Letchworth is more expensive than originally thought so is not preffered.

They discuss that they are modelling on 2tph from Oxford (1 from Paddington-Cambridge, 1 from Bristol-Ipswich/Norwich) and 1tph shuttle from Bletchley, but that the latter is performing less well. The benefits are seen to come from getting to Cambridge as fast as possible from points west. Hence the two highest scoring (and cheapest) corridor C options C1-1 and C2-2 both skip Bedford Midland.
 

Attachments

  • map.png
    map.png
    598.3 KB · Views: 87
  • BCRs.png
    BCRs.png
    52.5 KB · Views: 39
  • costs.png
    costs.png
    29.8 KB · Views: 40
Last edited:

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Yes, but reading the whole report gives the impression that C1-1 is prefered for other reasons, as I opined earlier. We shall see.

C-2-2 is essentially a scheme that totally avoids Bedford. I don't see that going down well, although the LAs in the area seem somewhat half-hearted about rail.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Yes, but reading the whole report gives the impression that C1-1 is prefered for other reasons, as I opined earlier. We shall see.
Could you say what part of the report gives you that impression?

Here are some more interesting bits of the report:
On capacity into Cambridge:
49. An operational restriction on the SBR Cambridge Branch is the difference in running time for fast and semi-fast services (19 minutes versus 30 minutes), which is further emphasised by three stations in a single 3-mile section and the need to provide a freight path. The different train speeds and stopping patterns means that the line capacity of a twin track railway is reduced and initial capacity modelling showed that the railway between Foxton and Meldreth would need to be doubled to 4-tracks to accommodate the level and mix of services.
50. All identified corridor options would require substantial capacity enhancement work on the West Anglia Main Line (WAML) between Shepreth Junction and Cambridge to accommodate increased services arising from the EWR-CS corridors. The existing 2 and 3-track railway would need to be increased to 4 tracks over a distance of 4.5km with recognition that the existing Overhead Line Equipment (OLE) and existing bridges might need adjustment for the increased track width.
51. A further consideration is that in order to provide the fourth track into Cambridge station, the existing reception siding may need to be converted to a running line and alternative facilities provided for the storage of trains.
And on Bedford and option C2-2:
From Bletchley Station the route is on the existing BBM line until south of Bedford where it diverts to the east onto the potential new alignment crossing the MML and ECML, with new split level stations at Bedford Parkway and a relocated Sandy Station. It joins the existing SBR near to Foxton Station and joins the BGK route north of Shelford Station to complete the CC2-2 route at Cambridge Station.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
924
Location
Munich
A north-to-east curve near the ECML crossing would be much more useful.

not sure about the usefulness of that, you have a line from Peterborough to Cambridge already so that would simply serve Huntingdon & St Neots to Cambridge which seems limited and assumes suitable paths can be found
 

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
FWIW, I think the C2-2 and Bedford Parkway option could work well, especially if properly integrated with MML services.

What I am a little surprised about is the decision to go into Cambs from the south - it really feels like a missed opportunity (given that a new alignment is needed anyway) to get rid of the (stupidly shortsighted) busway in north Cambs and bring the railway through the Science Park. In the process, you could serve the rapidly growing Cambourne area and relieve the A428. Assuming that Addenbrookes/Cambridge South is built, you'd terminate the trains there (until you've got double track to Colchester via Haverhill and Sudbury, of course..... ;)).
 