OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
I think there's a blockade due early next year. I suppose there may be several bridges requiring track lowering that could be done then. The number of bridges undergoing major reconstruction seems a good deal less than we were expecting a year or so ago.
Does anyone know how many for sure. Remaining Candidates:- Clatkston, Maybe Church Road*, Fenwick Road A77, Burnfield Rd*, Shawhill, OB31 At The Masts and Thorntonhall are all the remaining ones. Thornliebank and Westerton Lane in the process of being removed
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Does anyone know how many for sure. Remaining Candidates:- Clatkston, Maybe Church Road*, Fenwick Road A77, Burnfield Rd*, Shawhill, OB31 At The Masts and Thorntonhall are all the remaining ones. Thornliebank and Westerton Lane in the process of being removed
If you're asking about track lowering, then I don't know. Maybe lots need to be done.

If you're asking about works to the bridges themselves, then according to the list of bridges in post #2040 that I keep updated:

Clarkston Road requires parapet replacement, to take place next year.

Church Road required only parapet raising and has been completed.

Fenwick Road requires parapet modifications, 40 working days starting some time in the next 3 months

Burnfield Road required parapet modifications, has been completed

OB31 no info seen on what works required if any

I'm not sure where you mean by Shawhill. Was that meant to be part of the location of Burnfield Road or a separate bridge? Maybe a typo for Strawhill? Strawhill Road requires parapet works, to take place next year.
 
Last edited:

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
If you're asking about track lowering, then I don't know. Maybe lots need to be done.

If you're asking about works to the bridges themselves, then according to the list of bridges in post #2040 that I keep updated:

Clarkston Road requires parapet replacement, to take place next year.

Church Road required only parapet raising and has been completed.

Fenwick Road requires parapet modifications, 40 working days starting some time in the next 3 months

Burnfield Road required parapet modifications, has been completed

OB31 no info seen on what works required if any

I'm not sure where you mean by Shawhill. Was that meant to be part of the location of Burnfield Road or a separate bridge? Maybe a typo for Strawhill? Strawhill Road requires parapet works, to take place next year.
Yes it was in refrence to track lowering. Typo error STRAWHILL Rd indeed
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It seems a fair guess that wherever there's an arched bridge that isn't being reconstructed, there will be track lowering - except possibly beyond Busby, where they could conceivably slew the single track to the middle, as happened at some bridges on the Borders line (except of course that there, there was no extant track to slew!). But some arched bridges beyond Busby have already been demolished, with or without replacement.
 
Last edited:

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA
It seems a fair guess that wherever there's an arched bridge that isn't being reconstructed, there will be track lowering - except possibly beyond Busby, where they could conceivably slew the single track to the middle, as happened at some bridges on the Borders line (except of course that there, there was no extant track to slew!). But some arched bridges beyond Busby have already been demolished, with or without replacement.
I brought up back in Post 1361 that Thorntonhall may well be a problem. You can’t lower or slue the track due to the station being there. No doubt all will be revealed.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I brought up back in Post 1361 that Thorntonhall may well be a problem. You can’t lower or slue the track due to the station being there. No doubt all will be revealed.
Is the platform of full standard height? If it's on the low side, that might help a bit.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The bridge at Thorntonhall is to be reconstructed.
Thanks. Then roadworksscotland.org needs to be updated. It shows only overnight closures for 25 working days starting this autumn. Any other major omissions on that site?
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
A minor bit of progress, the ‘dangley bits’ have been fitted to the portal at Sutherland Drive.
IMG_0379.jpeg
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
A minor bit of progress, the ‘dangley bits’ have been fitted to the portal at Sutherland Drive.
View attachment 163554
We love to see it! Looks like they're using that portal as a Mid-Point Anchor (MPA); the catenary will be affixed either side of the boom and will be free to expand/contract either side. (Understandably this doesn't work for the contact wire.)
First time I've seen this arrangement in Scotland - it was plentiful on the MML but this is the first time I've seen SPL put one of these in north of the border.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
A further advance in progress. BUT THERE IS A Question to BE ANSWERED FIRST The First Correct answer WILL REVEAL MOREAnother Work Site BUT WHERE  DSC_0565.jpg
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
A Few questions answered
 

Attachments

  • Start of New Hairmyres Loop.jpg
    Start of New Hairmyres Loop.jpg
    1.2 MB · Views: 169
  • 1.jpg
    1.jpg
    508.5 KB · Views: 165
  • 2.jpg
    2.jpg
    322.2 KB · Views: 158
  • 3.jpg
    3.jpg
    695.9 KB · Views: 160
  • 4.jpg
    4.jpg
    421.4 KB · Views: 159
  • 5.jpg
    5.jpg
    474.5 KB · Views: 156
  • 6.jpg
    6.jpg
    488.9 KB · Views: 153
  • 7.jpg
    7.jpg
    527.1 KB · Views: 148
  • 8.jpg
    8.jpg
    419.2 KB · Views: 164

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,505
Location
Preston Lancs
We love to see it! Looks like they're using that portal as a Mid-Point Anchor (MPA); the catenary will be affixed either side of the boom and will be free to expand/contract either side. (Understandably this doesn't work for the contact wire.)
First time I've seen this arrangement in Scotland - it was plentiful on the MML but this is the first time I've seen SPL put one of these in north of the border.
Absolutely, Thanks to the OP for posting.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I've just remembered the name of the website that has a national list, it's railwaycodes.org.uk, and this page says it should be, or was once planned to be, KB.
 

Glaswegian

Member
Joined
30 Sep 2021
Messages
37
Location
Falkirk
Presumably KB stands for Kilmarnock line Branch....or Kilbride Branch?
The East Kilbride line is surely coded KB as a branch off the line from Glasgow to Barrhead, which has code K. This K is part of an alphabetic sequence (with gaps) of lines radiating from Glasgow, and it seems to be a lucky accident that K is the first letter of Kilmarnock. I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,685
Location
Scotland
I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.
Equally, there's no reason that I know if why it had to be KA so why not take advantage of the coincidence?
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA
The East Kilbride line is surely coded KB as a branch off the line from Glasgow to Barrhead, which has code K. This K is part of an alphabetic sequence (with gaps) of lines radiating from Glasgow, and it seems to be a lucky accident that K is the first letter of Kilmarnock. I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.
Possibly saving A for Ayr if Kilmarnock-Barassie gets wired?
 