Good. Keeps costs under control.I think there's a blockade due early next year. ( SNIP). The number of bridges undergoing major reconstruction seems a good deal less than we were expecting a year or so ago.
Good. Keeps costs under control.I think there's a blockade due early next year. ( SNIP). The number of bridges undergoing major reconstruction seems a good deal less than we were expecting a year or so ago.
Does anyone know how many for sure. Remaining Candidates:- Clatkston, Maybe Church Road*, Fenwick Road A77, Burnfield Rd*, Shawhill, OB31 At The Masts and Thorntonhall are all the remaining ones. Thornliebank and Westerton Lane in the process of being removedI think there's a blockade due early next year. I suppose there may be several bridges requiring track lowering that could be done then. The number of bridges undergoing major reconstruction seems a good deal less than we were expecting a year or so ago.
If you're asking about track lowering, then I don't know. Maybe lots need to be done.Does anyone know how many for sure. Remaining Candidates:- Clatkston, Maybe Church Road*, Fenwick Road A77, Burnfield Rd*, Shawhill, OB31 At The Masts and Thorntonhall are all the remaining ones. Thornliebank and Westerton Lane in the process of being removed
Yes it was in refrence to track lowering. Typo error STRAWHILL Rd indeedIf you're asking about track lowering, then I don't know. Maybe lots need to be done.
If you're asking about works to the bridges themselves, then according to the list of bridges in post #2040 that I keep updated:
Clarkston Road requires parapet replacement, to take place next year.
Church Road required only parapet raising and has been completed.
Fenwick Road requires parapet modifications, 40 working days starting some time in the next 3 months
Burnfield Road required parapet modifications, has been completed
OB31 no info seen on what works required if any
I'm not sure where you mean by Shawhill. Was that meant to be part of the location of Burnfield Road or a separate bridge? Maybe a typo for Strawhill? Strawhill Road requires parapet works, to take place next year.
I brought up back in Post 1361 that Thorntonhall may well be a problem. You can’t lower or slue the track due to the station being there. No doubt all will be revealed.It seems a fair guess that wherever there's an arched bridge that isn't being reconstructed, there will be track lowering - except possibly beyond Busby, where they could conceivably slew the single track to the middle, as happened at some bridges on the Borders line (except of course that there, there was no extant track to slew!). But some arched bridges beyond Busby have already been demolished, with or without replacement.
Is the platform of full standard height? If it's on the low side, that might help a bit.I brought up back in Post 1361 that Thorntonhall may well be a problem. You can’t lower or slue the track due to the station being there. No doubt all will be revealed.
Thanks. Then roadworksscotland.org needs to be updated. It shows only overnight closures for 25 working days starting this autumn. Any other major omissions on that site?The bridge at Thorntonhall is to be reconstructed.
We love to see it! Looks like they're using that portal as a Mid-Point Anchor (MPA); the catenary will be affixed either side of the boom and will be free to expand/contract either side. (Understandably this doesn't work for the contact wire.)A minor bit of progress, the ‘dangley bits’ have been fitted to the portal at Sutherland Drive.
View attachment 163554
Absolutely, Thanks to the OP for posting.We love to see it! Looks like they're using that portal as a Mid-Point Anchor (MPA); the catenary will be affixed either side of the boom and will be free to expand/contract either side. (Understandably this doesn't work for the contact wire.)
First time I've seen this arrangement in Scotland - it was plentiful on the MML but this is the first time I've seen SPL put one of these in north of the border.
Wow, it's been a few years since I've gone down as far ast Kilbride (despite not living too far) but I'm impressed with the amount of work completed so far! Long may it continue!A Few questions answered
I assume all counting up/down from Glasgow Central?In another morsel of movement, mast numbers have now been fitted.
Yes though actually starting at Busby junction I thinkI assume all counting up/down from Glasgow Central?
I never looked closely enough. I’ll get them next time I’m out that wayDo you know what the letters are?
Looking at photos Thornlibank Station 1st mast from Busby Junction is KB-01-10 Increasing upwards through Station towards Burnfield Road an onwards to EKThere have been mast numbers near Busby Junction for quite a long time.
Presumably KB stands for Kilmarnock line Branch....or Kilbride Branch?Looking at photos Thornlibank Station 1st mast from Busby Junction is KB-01-10 Increasing upwards through Station towards Burnfield Road an onwards to EK
The East Kilbride line is surely coded KB as a branch off the line from Glasgow to Barrhead, which has code K. This K is part of an alphabetic sequence (with gaps) of lines radiating from Glasgow, and it seems to be a lucky accident that K is the first letter of Kilmarnock. I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.Presumably KB stands for Kilmarnock line Branch....or Kilbride Branch?
Equally, there's no reason that I know if why it had to be KA so why not take advantage of the coincidence?I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.
Or possibly B for Busby?Equally, there's no reason that I know if why it had to be KA so why not take advantage of the coincidence?
Possibly saving A for Ayr if Kilmarnock-Barassie gets wired?The East Kilbride line is surely coded KB as a branch off the line from Glasgow to Barrhead, which has code K. This K is part of an alphabetic sequence (with gaps) of lines radiating from Glasgow, and it seems to be a lucky accident that K is the first letter of Kilmarnock. I do not think B can stand for branch (nearly all lines are branches), and I would guess that it is just random, though I do not see why the code should not have been KA.