Timetables are normally released to the public about 4 weeks before they commence.
Surely that must cause issues with ticket booking though, given tickets can be booked up to 12 weeks in advance?
.Has anyone got any information on any changes for the December 2009 timetable. I have heard East Midlands Trains are introducing a 1/2 hourly service to Sheffield, does anybody know about other changes?
Has anyone got any information on any changes for the December 2009 timetable. I have heard East Midlands Trains are introducing a 1/2 hourly service to Sheffield, does anybody know about other changes?
in some cases tickets aren't made available 12 weeks in advance - engineering works decided rather short term often cause havoc. No, I think the majority of it is sorted out 12 weeks in advance*, with Network Rail and the TOC ironing out any final issues with it. What I meant with my comment is the printed copies (and website PDFs) are made public 4 weeks prior to the changeover.
*I'm sure The Planner could confirm this one way or another when they read this topic.

in some cases tickets aren't made available 12 weeks in advance - engineering works decided rather short term often cause havoc. No, I think the majority of it is sorted out 12 weeks in advance*, with Network Rail and the TOC ironing out any final issues with it. What I meant with my comment is the printed copies (and website PDFs) are made public 4 weeks prior to the changeover.
*I'm sure The Planner could confirm this one way or another when they read this topic.
Chiltern share their proposals and the planned timetables can be downloaded from their website with the changes clearly marked.
http://www.chilternrailways.co.uk/news/latest-news/ttconsult-dmr09/
John.
Arriva trains from Chester to Manchester Piccadilly will continue to Manchester Airport I believe.
That's the plan, but in the draft copy I've seen for North Wales they were still listed as terminating at Piccadilly. (There was an empty column added for the Airport, though.)
Service from Aberystwyth to London Marylebone MAY begin.
but Wrexham to Ringway via road is
very cheap, so I hope ATW bear this in mind for Nth Wales and not make it
a Piccadilly/Ringway extra service due to prices.
Has anyone got any information on any changes for the December 2009 timetable. I have heard East Midlands Trains are introducing a 1/2 hourly service to Sheffield, does anybody know about other changes?
I'm sorry, I'm not following.
Everyone, NR and all the TOCs and FOCs, are supposed to bid T-12 so tickets can be reserved and diversionary paths found. The initial short term stuff is also meant to come in at T18, but changes can be made to that.
Some nameless TOCs dont bid short term to anything like those deadlines and are a proverbial pain the rear. Like Dan has said, engineering work causes havoc, even more so when it is cancelled than when it is a late addition. Late diagram changes also cause a nightmare when you are trying to platform a station.
That's the plan, but in the draft copy I've seen for North Wales they were still listed as terminating at Piccadilly. (There was an empty column added for the Airport, though.)
Some NR offices are painfully slow updating TSDB too...
Should be done automatically with little human intervention, unless you are talking about VSTP stuff or schedules put in by control.