I guess the side benefit of swallowing up the Tring services to Crossrail is that the rolling stock released can then extend all the other services to 12 cars. I'm still not convinced about the pressure on platforms at Euston though - moving the Tring services probably frees up, what, one platform, maybe two at a push? The plans for the rebuild were very well thought out and provided equivalent capacity throughout the rebuild, made possible by the HS2 platforms being constructed first, and thus able to act as a buffer for the Intercity services, leaving most of the the existing platforms available for the suburban services as the reconstruction progresses from west to east.
I can't find the documents now, but IIRC, phase 1 loses platforms 16-18 to the HS2 section, which when complete, provides 10 or so platforms. Sevices then move across to these temporarily. Phase 2 then closes platforms 8-15, with services spread between the new platforms (I'd imagine ICWC services would be concentrated in the new platforms, with long-distance LM services with them, and suburban LM services pushed down into platforms 2-7). Once phase 2 completes, we will have an additional 8 or so platforms (the 400m mixed use WCML platforms, and the 6x16 car platforms). Phase 3 would see LM bumped across to the new WCML platforms, whilst the final set of the old 1-7 are demolished and rebuilt as the 6x12 car platforms. Once complete, LM returns to it's new home of platforms 1-6, Virgin move across to its new home of platforms 7-12, and the mixed-use platforms 13 & 14 are probably used for the sleeper services. HS2 opens and takes up platforms 15-24.
Job's a good'un, no pressure whatsoever.
