Cross-City Electrification from Barnt Green to Bromsgrove

Status
Not open for further replies.

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,846
Location
Nowhere Heath
The Fast Lines Kings Norton-Longbridge would also need wiring, plus (probably) the Camp Hill route.

So, yes, it would be Birmingham to Bristol (or, strictly, Grand Jn to Westerleigh Jn, with a couple of gaps)

Fair point, I'd forgotten about the fast lines not being electrified :oops:

I do wonder if Gloucester would also see some wires go up to it, whilst in the area and all that, but seriously doubt that.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Freight operators werent interested as the banker currently interworks with Bescot shunting.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Fair point, I'd forgotten about the fast lines not being electrified :oops:

It's a blessing and a curse. They're not wired and can't easily be wired - being headspans, it'll need a lot of work to modify or replace the existing headspans to wire the fast lines, but as a result, it makes the conversion of the headspans to portals much less difficult.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,894
Location
West Country
Some of the line doesn't even use headspans, which if I recall are only used between Longbridge to the point where it drops down to two tracks near Barnt Green, and also some near Kings Norton; the rest is single masts on each side.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,846
Location
Nowhere Heath
It's a blessing and a curse. They're not wired and can't easily be wired - being headspans, it'll need a lot of work to modify or replace the existing headspans to wire the fast lines, but as a result, it makes the conversion of the headspans to portals much less difficult.

Interesting to know that, sounds like I should be expecting months of weekend closures while it gets done. When it actually starts of course. I'm also hoping to be well away from the area before then!

Starships up the Lickey promises to be an interesting ride, I just hope LM get them fixed up nicely so we have less instances of them running on just one motor coach. If Northern can manage to keep their Starships in top condition, surely so can LM...
 

moggie

Member
Joined
2 Jan 2010
Messages
426
Location
West Midlands
Right, dug the plans out to stop the general confusion (including mine) that is going on.

1 to 4 from left to right as said. 1 is the Up Bromsgrove Loop where freight will sit which is 30mph and 40mph on the exit. 2 is the Up Gloucester main line at 90mph. 3 is the Down Bromsgrove Station Loop at 40mph and where Cross City trains will turn back, they get back to the Up line via a crossover at the north end of the platform, also 40mph, which does not conflict with the Down line. 4 is the Down Gloucester at 90mph. Only 2 and 3 are wired. The old station has to close before the lines through 1 and 4 can be completed as they go through the ends of the platforms.

Interesting. How is it proposed to regain the Down Gloucester line towards Stoke Works Jcn from P4 as that line proceeds to form the Down Goods line south of the new station? Do the current Goods and Gloucester (main) line swap or is there a higher speed arrangement similar to that at Longbridge station (Halesowen Jcn)?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
Standard design. The new bridge at West Hampstead is almost exactly the same. Various others also.

The basic design appears common to most "access for all" new footbridges.

NR must have a term contractor for the steelwork aspects, I expect the lift shafts are more tailored to the local site conditions and architecture if necessary. Fareham, Fratton, Brockenhurst, Southampton Parkway, Winchester are my local examples.
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
There's been quite a serious decline in freight using the Lickey so I'm not sure which workings are banked. IIRC, the class 66 bankers would usually be detached before Kings Norton?

If the FOCs wanted to use electric bankers, then my idea would be to stop using Saltley LIP and use Kings Norton yard instead. It would have to be wired in places, but the banker could then use the slow lines as far as Longbridge.
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Some of the line doesn't even use headspans, which if I recall are only used between Longbridge to the point where it drops down to two tracks near Barnt Green, and also some near Kings Norton; the rest is single masts on each side.

Single track cantilevers are generally fine but tensioning will be changed to spring loaded Tensorex units (to happen at some point anyway), the only issue would be if there's to be replacement of all the existing STCs to provide a single design of catenary all the way from Bristol to Birmingham for maintenance purposes, which is an outside possibility given the fast lines aren't wired, but unlikely.
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
There's been quite a serious decline in freight using the Lickey so I'm not sure which workings are banked. IIRC, the class 66 bankers would usually be detached before Kings Norton?

If the FOCs wanted to use electric bankers, then my idea would be to stop using Saltley LIP and use Kings Norton yard instead. It would have to be wired in places, but the banker could then use the slow lines as far as Longbridge.

The bankers - typically 2x Class 37 in days gone by or nowadays a single class 66 - would only work as far as the top of the bank at Blackwell. They would simply push from the rear up the bank then drop off at the top. There is a turnback facility at Blackwell. The 37s were out based at Bromsgrove from Gloucester IIRC. But currently I think a 66 is provided just on an as required basis and may well come from Saltley and return there shortly afterwards.

As to an electric banker, one of the new 88s would be interesting...
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
The bankers - typically 2x Class 37 in days gone by or nowadays a single class 66 - would only work as far as the top of the bank at Blackwell. They would simply push from the rear up the bank then drop off at the top. There is a turnback facility at Blackwell. The 37s were out based at Bromsgrove from Gloucester IIRC. But currently I think a 66 is provided just on an as required basis and may well come from Saltley and return there shortly afterwards.

As to an electric banker, one of the new 88s would be interesting...

Yes that's right, before the 37s they used Hymeks and pannier tanks before them. The 37s were based at Bromsgrove until 1986 when the depot closed and they moved to Gloucester, since then the bankers have been allocated to Saltley LIP. On Sundays, you occasionally get the banker working from Bescot to Bromsgrove and they run via Birmingham New Street.

15925294104_93f236be21_c.jpg
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Interesting. How is it proposed to regain the Down Gloucester line towards Stoke Works Jcn from P4 as that line proceeds to form the Down Goods line south of the new station? Do the current Goods and Gloucester (main) line swap or is there a higher speed arrangement similar to that at Longbridge station (Halesowen Jcn)?

Down Gloucester swings back in, the goods loop is slightly curtailed and starts at a new 50mph junction.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
That is the infrastructure model taken from the train planning system (TPS), it doesn't help that it is in black and white as the model is colour. Needless to say, there are errors on it.
 

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
The bankers - typically 2x Class 37 in days gone by or nowadays a single class 66 - would only work as far as the top of the bank at Blackwell. They would simply push from the rear up the bank then drop off at the top. There is a turnback facility at Blackwell. The 37s were out based at Bromsgrove from Gloucester IIRC. But currently I think a 66 is provided just on an as required basis and may well come from Saltley and return there shortly afterwards.


As to an electric banker, one of the new 88s would be interesting...
;
interstingly perusal of RTT suggest the early morning arrival at Wolverhampton Steel Terminal gets an assisting loco - would be interested to know if it is the banker or random provision.
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
;
interstingly perusal of RTT suggest the early morning arrival at Wolverhampton Steel Terminal gets an assisting loco - would be interested to know if it is the banker or random provision.

That's unusual, the steel workings from there aren't usually banked.
 

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
That's unusual, the steel workings from there aren't usually banked.
;
I didn't say from, I said to.
;
Usually a light engine is shown returning to Bescot, although there were schedules last week they don't seem to have run. My theory was that it is overload for a 66.
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
;
I didn't say from, I said to.
;
Usually a light engine is shown returning to Bescot, although there were schedules last week they don't seem to have run. My theory was that it is overload for a 66.

Maybe DB were trialling 66's on the empty workings, the workings to and from Wolves are usually handled by tugs.
 

mikestone1952

Member
Joined
12 Feb 2011
Messages
299
Maybe DB were trialling 66's on the empty workings, the workings to and from Wolves are usually handled by tugs.
;
It does seem to have reverted to 60s in the last couple of weeks but had been largely 66s for the previous three months.
'
(Subsequently)In fact this mornings lists do show it with two 66s, one attached at Bescot, not a banker.
 
Last edited:

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I visited friends in Bromsgrove this week and took the shots here:

https://www.flickr.com/photos/127646831@N03/albums/72157668460941000

I didn't have a window seat southbound, but on our way back northbound I was pleased to see lots of cylindrical mast base piles either driven home or partly installed. there were also a decent number of marker pegs where masts will go.
 
Last edited:

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,400
What impact will the opening of a fancy new station have on loadings? Is there a danger that services will become oversubscribed (if they are not already)?
 