I counted 40-ish piled mast bases today, between Barnt Green and Bromsgrove (each side).
They are concentrated at the upper and middle sections of the Lickey.
Nothing at the bottom end or the new station area at Bromsgrove, and only a few east of Blackwell.
Bromsgrove old station has vanished without trace!
The new Down Fast is in situ alongside P4, but is not connected at either end.
A 13-day blockade is advertised for 25 Oct - 6 Nov for resignalling etc. Through services diverted via Kidderminster.
http://www.nationalrail.co.uk/service_disruptions/currentAndFuture.aspx?TravelDate=27/10/2016&TOC=lm
On the Chase line, there are piled bases between all the stations on the branch from Ryecroft Jn to Rugeley TV, but still plenty of gaps south of Cannock.
No sign of electrification work south of Ryecroft Jn through Walsall station (the new wires will have to extend to Pleck Jn as only the eastern pair of lines from Walsall is currently wired).
And finally, I was gratified to discover that you can still hear Phil Sayer's announcements on Midland Metro trams.
