I'm not sure if this has been pointed out but it's easy to do Long Buckby to London in less than 1h 10.
Compared to a journey on the direct line of about 0h50?
I'm not sure if this has been pointed out but it's easy to do Long Buckby to London in less than 1h 10.
From 10tph to 5tph? I like your optimism!After HS2 has been built, I think it highly unlikely that trains will be running on the existing line via Weedon at such a frequency.
Post HS2 opening, I would expect the train frequency on the existing line via Weedon to be halved, and only perhaps three of those trains per hour to be 'express'. A stop at Weedon would easily be accommodated in this scenario. I would expect the Weedon stop to be inserted in trains that are already stopping at Rugby and Milton Keynes.
From 10tph to 5tph? I like your optimism!
Given that Polesworth (population >8000) doesn’t justify reinstatement of its footbridge and hence station, I’m struggling to see how Weedon (population three rather mangy cows, a Dachshund named Colin and a small hen in its late 40s) is going to justify a brand new station on the West Coast fast line, regardless of HS2. Just not going to happen.
If it’s really about Daventry, Mr Google says 10mins Daventry to Weedon, 10mins Daventry to Long Buckby and 18mins Daventry to Rugby.I think any justification would be on the size of the town of Daventry (approx 25,000) approx 4 miles distant, rather than Weedon Village itself.
After HS2 the West Coast fast line will likely no longer be the major express artery that it currently is - a secondary main line at best.
If there's thought to be suitable demand from these towns and villages, I would suggest lobbying the government to require West Midlands Trains to set up a trial service of bus link to Long Buckby. A handful of extra stops there may even be a possibility. Buses could serve 'virtual' stations in the villages. A two year trial and the fitment of some signs and ticket machines onto bus stops, plus finding suitable vehicles would be achievable within months if you can get the subsidy (only a few hundred thousand pounds I should think) agreed.
If it’s really about Daventry, Mr Google says 10mins Daventry to Weedon, 10mins Daventry to Long Buckby and 18mins Daventry to Rugby.
How do you propose all these users in Daventry get to the station? Drive? Bus? In which case if you want a fast train drive/bus to Rugby.
If you think the West Coast fast lines will be a secondary line after HS2, you are deluded. The case for a station at Weedon is still zero regardless.
That’s France. Not England. They are totally different countries in terms of travel patterns, population spread etc etc. Any comparison of the impact of a high speed line is meaningless.I might be deluded, but I just look at all that spare capacity on those French 'classic' lines after the TGV lines were built.......
(As 43096 replied since I started typing) I'm not convinced that is a valid comparison, given the very different population density, and the service pattern on the densely populated WCML.I might be deluded, but I just look at all that spare capacity on those French 'classic' lines after the TGV lines were built.......
Post HS2 opening, I would expect the train frequency on the existing line via Weedon to be halved, and only perhaps three of those trains per hour to be 'express'. A stop at Weedon would easily be accommodated in this scenario. I would expect the Weedon stop to be inserted in trains that are already stopping at Rugby and Milton Keynes.
I might be deluded, but I just look at all that spare capacity on those French 'classic' lines after the TGV lines were built.......
Don't see why, you will likely still have 2tph Birmingham, Trent Valley LNWR style isn't going to stay at 1tph, there will still be an Avanti style train to the North West, possibly 2 and add a couple of Class 4 freights you are up to 7tph easily.At more than 5tph I like yours!
No doubt frequency on the old line will be reduced, but that doesn’t mean that headways will. Flighting will still be necessary out of Euston because of stopping patterns; I’d expect 3 minute headways to still be the norm. You don’t just look at a particular location in isolation, you have to take it at a route wide perspective.
And look at all the new stations they built on the classic lines serving small villages...
(As 43096 replied since I started typing) I'm not convinced that is a valid comparison, given the very different population density, and the service pattern on the densely populated WCML.
Maybe a read of the various papers produced by HS2, Midlands Connect and others on the potential uses of released capacity would be a better starting point than anecdotes from France?
Don't see why, you will likely still have 2tph Birmingham, Trent Valley LNWR style isn't going to stay at 1tph, there will still be an Avanti style train to the North West, possibly 2 and add a couple of Class 4 freights you are up to 7tph easily.
Two years in my proposal. One or three could also work. This is how it's possible to get trial funding.And we all know how long such bus feeder services are guaranteed to stay in place.
That's the point isn't it?Weedon would still be a bus/car ride away, so wouldn't be much better than the current options.
If Daventry continues to grow, might it be feasible to reinstate the former Weedon to Leamington branch as far as Daventry (maybe with some realignment to avoid any obstructions on the old trackbed) ? No need for a station at Weedon - just extend some Euston - Milton Keynes services to Daventry .....That's the point isn't it?
RT4038 keeps telling us it's about Daventry rather than Weedon, yet it is still a car or bus ride away of 10-20 minutes - the same as it is to Rugby which already has a fast service to Euston. With three stations in a reasonable distance (Rugby, Long Buckby and Northampton) there's no justification for another and any new station would be primarily abstractive from those existing stations.
If Daventry continues to grow, might it be feasible to reinstate the former Weedon to Leamington branch as far as Daventry (maybe with some realignment to avoid any obstructions on the old trackbed) ? No need for a station at Weedon - just extend some Euston - Milton Keynes services to Daventry .....
Northampton (pop about 200,000) has a very poor service Northwards - even the Birmingham service is an all stations one. Wellingborough (pop about 80,000 incl. nearby towns) is shortly having its service to the North limited to Kettering and Corby; travel further North than Leicester will generally require two changes. Corby (61,000) had no railway station for about 50 years; now, it's service to the North is extremely limited.
Before HS2 is built, there would be no capacity on the line to stop trains at a reopened station.
Post HS2 there is unlikely to be any operational reason as to why Weedon station could not be re-opened
Not quite on either the Northampton - Birmingham or Wellingboro / Kettering.
On the first it's all stations to Marston Green then non stop to New Street. Though it is inferior to how it was under Silverlink when it was Long Buckby, Rugby, Cov, International and New Street.
On the MML one it will be 1 change from Wellingborough, or direct from Kettering to Nottingham with a change at Leicester for Derby or Sheffield - which in Kettering's case is as today, Wellingborough though is losing out.
This seems rather more expensive than an additional station on a (post HS2) secondary main line.
It is counter intuitive for Daventry residents to travel 20 minutes to the North West (Rugby) in order to board a fast train travelling south which will then 10 minutes later pass a point 10 minutes travel from Daventry.
Yes, I agree I should have said 'almost every station to New St'. However, the number of calls obviously increases the journey time and this was observation; to cover the 48 1/2 miles takes between 60 and 65 minutes Monday - Friday, an average speed of from 44.77 to 48.5 m.p.h. Bearing in mind the closeness of Northampton to the M1, it's just not competitive with road (A45/M1/M6).
You'll struggle to do Northampton to central Birmingham by road in 60 mins. You can get to the airport / NEC in that time.
At peak times I agree with you. At quieter times (and there’s a lot more of them now), I can drive Hertfordshire to Central Birmingham in well under a hour and a half, so Northampton to Central Birmingham woudl be well under an hour.
My post generated an interesting debate about whether the Northampton-Birmingham rail service is competitive with a car, and it seems that, for a journey to Birmingham city centre it might be (although I allow myself 20 minutes to drive to Northampton station against 10 minutes to the M1 - and I live East of the station).
However, perhaps what's been lost is that I made the point that Birmingham is the only large town or city destination to the North of Northampton that has anything like a competitive service.
To travel to Liverpool, Manchester, the North Wales coast (and, for most time of the day, anywhere north of Warrington) starts with a journey to Milton Keynes to join an Avanti service, and around half an hour after leaving Northampton one can catch a glimpse of the town's landmarks again, as you finally start to head towards your destination. Of course, this extra travelling doesn't come free; ticket prices for all these destinations are the same as, or slightly more expensive than, one fro Milton Keynes.
Even more bizarre is that, at some times of the day in the normal timetable (and, I think, once an hour in the Covid one) NRES
suggest travel via Rugby ('separate tickets may be needed').
Perhaps proposals to build new railway lines around here should be placed on hold until an acceptable service is provided on the ones that already exist (and which have not been starved of investment, apparently).