Possibly royal mail coaches or the sleeper
Agreed.However, it is the mention of 125mph freight that seems odd
GC Euston to Blackpool is planned using 67s and stock and they were mooting 125 as a long term aim... Can't imagine it's in relation to that though. It isn't approved and would only be from 2012. Could GC have the might and wherewithal to do all this ground work on the off chance? Possible but I can't see it!
They couldn't do 125 on the WCML.
Correct me if I am wrong, but I thought anything running faster than 110mph must have some sort of EP Brake (E70 Valve in a HST power Car)?
ie. When the brake is applied, the Air Brake is applied from both ends of the train at the same time electronically.
Any connection?
I agree, I can't see the 67s regularly reaching 125 with any sort of train behind it. Also not sure how the brake pipe control issue is resolved, this isn't covered by the AAR mods to the WSMR/Chiltern DVTs. The 67 does have a comparitively high brake force, hence it can run at 100mph light engine, so this may come into the equation.
67 plus 3x325 staggers up Shap at 35.....86/2 with 3x325 and a dead 66 manages the train limit of 75. Skin off the rice pudding? Confused by the presence of a rice pudding!
Interesting reading. So, despite 3200 hp - which I would class as a powerful diesel - are we saying that they are actually underpowered?
I think he was getting at the lack of tractive effort, which given that my Platform 5 book gives 31,770lbf (about the same as an O4 just short of an 8F), can't be all that much of a problem. High gearing may not help, but I can say that 67s make 47s look like they've been welded to the rails in terms of acceleration.
Yes, WSR had originally planned to operate their Wrexham services out of Euston, but were not permitted to do so hence why they commenced operations from MaryleboneJanuary's Railway Magazine notes that Chiltern Railways are consulting Network Rail about running locomotive hauled (class 67) services at 125mph from May 2011.
Any connection?