Class 67s to run at 125 mph in 2011

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
Sleepers would have to be enitrely formed of mk3s to do that, and they always run quite slow so as to not give a rough ride, there has never been any 125mph capable Royal Mail stock, the Mk1 based stuff would be 100 as would the Class 325 units.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Some of the Mk1 postal stock was cleared to 110mph.
Presume they will lash some Mk3s up for this from DB Regio pool.
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
2,999
Location
Cambridge
The ability to drop onto a failed 225 set and drag at 125 mph would be of some benefit. We currently have no 125 mph coaching stock, LHCS Mk 3s are 110 mph unless modified.

I thought it was axle load rather than brake blocks that prevented them running at 125 mph in the first place?

Puzzling!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
Will only be on the GWML they'll do this then, usual story of no EPS and 67s are limited to 110 on the ECML.
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,858
Location
Rugby
Has these tests actually taken place yet as the posts on wnxx had paths in for tomorrow and Thursday so is it a bit premature to say they were successful tests?
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
I can understand why the tests have been carried out on the GWML, to ensure the Class 67 can meet their original design speed (which some of them did meet shortly after delivery)
However, I don't remember anyone posting any Class 67 test runs with Mark 3a or 3b coaches
If an Open Access Operator has proposed 125mph services using such coaches, then no doubt the RoSCo wants to make sure it can meet their requirement, so therefore this application is no doubt being taken seriously

However, it is the mention of 125mph freight that seems odd
There was a mention a few years ago of converting some Mark 3 coaches for Royal Mail use, but that was all abandoned
For such a freight train it would either have to be short or light, otherwise it would need two such locos in order to take advantage of the higher speed
With all the spare RFM coaches, this might be under consideration again...
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
However, it is the mention of 125mph freight that seems odd
Agreed.

Linespeed dictates that the benefits of high speed operation can only apply to London-Bristol, and timetables dictate that the only times when freight paths would have to operate at high speed are during daytime hours, so I'm puzzling to see where the market is.
Imported coal to Power generators, perhaps?
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
It's a totally unfounded idea, but I'm thinking that they could want to put forward the idea them for use them to haul the electric IEP sets where there's no wires.
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
2,999
Location
Cambridge
GC Euston to Blackpool is planned using 67s and stock and they were mooting 125 as a long term aim... Can't imagine it's in relation to that though. It isn't approved and would only be from 2012. Could GC have the might and wherewithal to do all this ground work on the off chance? Possible but I can't see it!
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
GC Euston to Blackpool is planned using 67s and stock and they were mooting 125 as a long term aim... Can't imagine it's in relation to that though. It isn't approved and would only be from 2012. Could GC have the might and wherewithal to do all this ground work on the off chance? Possible but I can't see it!

They couldn't do 125 on the WCML.
 

Drimnagh Road

Member
Joined
13 Mar 2009
Messages
688
Location
Dublin
As an aside, and not suggesting anything in the least - with modification - could a 67 work with a mk4 + 82/2 ?, i.e. the 91 comes off at Edinburgh, and the 67 goes on to Aberdeen?
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
There isn't any 125mph sections between Edinburgh and Aberdeen is there? (Bear in mind the nearest route I sign is Nottingham!)
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
I have had a quick look through the ORR documents, there is nothing "new" planned to start from 2011
I therefore think this is a request from FGW to convert two passenger turns from HST into Class 67 plus five Mark 3 coaches (possibly top and tail)
In 2012 these would transfer to GCT

As for the freight, I suspect this is to ensure the brakes do not need to be changed and can be used whatever the locos are allocated to; ScotRail sleeper, East Coast Thunderbirds, WSR, etc
 

dubscottie

Member
Joined
4 Apr 2010
Messages
1,013
Correct me if I am wrong, but I thought anything running faster than 110mph must have some sort of EP Brake (E70 Valve in a HST power Car)?

ie. When the brake is applied, the Air Brake is applied from both ends of the train at the same time electronically.
 
Last edited:

E&W Lucas

Established Member
Joined
21 Jan 2010
Messages
1,358
Correct me if I am wrong, but I thought anything running faster than 110mph must have some sort of EP Brake (E70 Valve in a HST power Car)?

ie. When the brake is applied, the Air Brake is applied from both ends of the train at the same time electronically.

Correct. Length of train comes into it as well.

As the skin of a rice pudding presents a haulage challenge for a 67, I struggle to see where this could happen on a regular basis. Unless it's a media stunt?
 

captainbigun

Member
Joined
3 May 2009
Messages
977
I agree, I can't see the 67s regularly reaching 125 with any sort of train behind it. Also not sure how the brake pipe control issue is resolved, this isn't covered by the AAR mods to the WSMR/Chiltern DVTs. The 67 does have a comparitively high brake force, hence it can run at 100mph light engine, so this may come into the equation.

67 plus 3x325 staggers up Shap at 35.....86/2 with 3x325 and a dead 66 manages the train limit of 75. Skin off the rice pudding? Confused by the presence of a rice pudding!
 

Woody

Member
Joined
10 Dec 2006
Messages
277
January's Railway Magazine notes that Chiltern Railways are consulting
Network Rail about running locomotive hauled (class 67) services at
125mph from May 2011.
Any connection?
 

Drimnagh Road

Member
Joined
13 Mar 2009
Messages
688
Location
Dublin
I agree, I can't see the 67s regularly reaching 125 with any sort of train behind it. Also not sure how the brake pipe control issue is resolved, this isn't covered by the AAR mods to the WSMR/Chiltern DVTs. The 67 does have a comparitively high brake force, hence it can run at 100mph light engine, so this may come into the equation.

67 plus 3x325 staggers up Shap at 35.....86/2 with 3x325 and a dead 66 manages the train limit of 75. Skin off the rice pudding? Confused by the presence of a rice pudding!

Interesting reading. So, despite 3200 hp - which I would class as a powerful diesel - are we saying that they are actually underpowered?
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Interesting reading. So, despite 3200 hp - which I would class as a powerful diesel - are we saying that they are actually underpowered?

I think he was getting at the lack of tractive effort, which given that my Platform 5 book gives 31,770lbf (about the same as an O4 just short of an 8F), can't be all that much of a problem. High gearing may not help, but I can say that 67s make 47s look like they've been welded to the rails in terms of acceleration.
 

E&W Lucas

Established Member
Joined
21 Jan 2010
Messages
1,358
I think he was getting at the lack of tractive effort, which given that my Platform 5 book gives 31,770lbf (about the same as an O4 just short of an 8F), can't be all that much of a problem. High gearing may not help, but I can say that 67s make 47s look like they've been welded to the rails in terms of acceleration.

TE, etc are just theoretical calculations, and aren't always reflected in what you get on the ground. For your comparison, think more D49 than A2! Fast and frisky for something like WSMR or the postal trains; struggle with any sort of weight behind them.
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
January's Railway Magazine notes that Chiltern Railways are consulting Network Rail about running locomotive hauled (class 67) services at 125mph from May 2011.
Any connection?
Yes, WSR had originally planned to operate their Wrexham services out of Euston, but were not permitted to do so hence why they commenced operations from Marylebone
However, it appears this restriction could be relaxed at the next timetable, although it would mean running non-stop along the WCML and losing the current route connections
 

captainbigun

Member
Joined
3 May 2009
Messages
977
125mph running on the WC (apart from a small stretch Wolverhampton-Stafford which allows 125 for HST/voyager) is down to use of tilt. No tilt, 110mph max. I can't see this changing.

67s have nearly half the TE of an 87 and less than half the power of an 87. OK, it's an apples and pears comparison as one isn't restricted by the engine, but makes a good point none the less.

Look at the trains that regularly run at 125mph they all have significantly more power if not more TE.
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
67's are no good for freight, I would imagine it is for passenger use, as for mk3's not being able to run at 125, all the HST's have Mk3's and the HST's will be taken out in the distant future freeing up hell of a lot 125 rated coaches, however, if this is the case either the DVT's need to be modified, there is top and tail or a run round it is never going to happen, a 67 will struggle to reaqch 125 on any up gradient even slight so I cannot see why DB shenker are even suggeting it. Tests have been carried out recently using 67010 that is now back at bescot.
 