I wonder with the benefit of hindsight if the current day SWT successors to the SR CM&EE department are thinking the same.
Why?
It wasn't their idea to strengthen the 458s, it was a DaFT decision and had bugger all to do with SWT.
I wonder with the benefit of hindsight if the current day SWT successors to the SR CM&EE department are thinking the same.
In my ompinion they should've kept the original livery...
Why?
It wasn't their idea to strengthen the 458s, it was a DaFT decision and had bugger all to do with SWT.
If I remember correctly, there were two possibilities: extra class 450 trailers to make some of them 5 cars, or use almost all the redundant class 460s to lengthen the class 458s. The second option avoided the wastefulness of 64 class 460 coaches sitting unused, and was cheaper because it was conversion work and not new build. If the DfT had ignored the second option and chosen the more expensive first one there'd have been plenty of people complaining about an extravagant waste of money.
So the option of lengthening the class 458s has turned out to be difficult and problematic. Is that the DfT's fault? Or the fault of Alstom and Wabtec who are doing the work? Or of Porterbrook for inadequately analysing what the job required?
If I remember correctly, there were two possibilities: extra class 450 trailers to make some of them 5 cars, or use almost all the redundant class 460s to lengthen the class 458s.
Why?
It wasn't their idea to strengthen the 458s, it was a DaFT decision and had bugger all to do with SWT.
SWT have their paw prints all over this so to imply that they just stood at the back and watched whilst this project was forced upon them is just plain wrong. Yes DfT wanted the cheapest solution (but so incidentally did some key decision makers at Stagecoach) but SWT negotiated and placed the contract and specified the operational requirements. I know that the SWT stakeholders were privately advised quite early on that there was a far higher degree of risk in this project than was being catered for.
The ROSCO, Alstom, Dft and SWT all share some of the blame. A blindly optimistic application of the infamously flawed NASA paradigm of "faster, better, cheaper", failure to understand the whole life costs, poor understanding of the condition of the asset being converted, a ludicrous decision to start with the hardest part of the conversion rather than the easiest and thus build up knowledge and experience of the work incrementally, driving the project plan from the end date instead of the work content and a dozen more examples from the "how not to conceive and execute a project" play book. All parties involved in this are complicit to a lesser or greater extent in the current SNAFU including SWT.
For reputational preservation it is understandable that SWT would now wish it to be known that "it wasn't us guv" but they have had many opportunities to drive this in a different way but didn't.
SWT have their paw prints all over this so to imply that they just stood at the back and watched whilst this project was forced upon them is just plain wrong. Yes DfT wanted the cheapest solution (but so incidentally did some key decision makers at Stagecoach) but SWT negotiated and placed the contract and specified the operational requirements. I know that the SWT stakeholders were privately advised quite early on that there was a far higher degree of risk in this project than was being catered for.
The ROSCO, Alstom, Dft and SWT all share some of the blame. A blindly optimistic application of the infamously flawed NASA paradigm of "faster, better, cheaper", failure to understand the whole life costs, poor understanding of the condition of the asset being converted, a ludicrous decision to start with the hardest part of the conversion rather than the easiest and thus build up knowledge and experience of the work incrementally, driving the project plan from the end date instead of the work content and a dozen more examples from the "how not to conceive and execute a project" play book. All parties involved in this are complicit to a lesser or greater extent in the current SNAFU including SWT.
For reputational preservation it is understandable that SWT would now wish it to be known that "it wasn't us guv" but they have had many opportunities to drive this in a different way but didn't.
Interesting day for me on 458's...Stock change at Reading...I had worked 458023+458021 down to Reading and worked 458006 and 458022 back...Guess 458006 will be off soon.I couldn't get the number of the unit in Clapham Yard but im sure I saw 458503 (during the week) in there but am not fully sure.
That must be a first!
458501 Testing at WCD
458502 In service ✔
458503 Testing at WCD
458504 Testing at WCD
458505 Doncaster
458510 Due to move to Doncaster soon
458530 Doncaster
458531 In service ✔
458532 In service ✔
458533 In service ✔
458534 In service ✔
458535 In service ✔
458536 Testing at WCD
458501 Testing at WCD
458502 In service
458503 Testing at WCD
458504 Testing at WCD
458505 Doncaster
458510 Due to move to Doncaster soon
458530 Doncaster
458531 In service
458532 In service
458533 In service
458534 In service
458535 In service
458536 Testing at WCD
25 years of the Reading road and it is.The screens can be wrong at Reading at times.it was advertising the 1039 first and my train the 0939 second so I ignored it...Then an empty train came into platform 6 and it was advertised as my train.Could not set the radio up so I suspected something was wrong.It was...I was on the wrong train.
That makes sense. SWT stated that 6 units would be delivered by the end of the Summer. (November is a bit late mind!) The first 4 were for 4 more diagrams (now running) and the next 2 for crew training.
I have done that once (my fault) at Guildford, I even buzzed the siggy up when the signal didnt clear to be told my train was on platform 2, not platform 1, Cue the fastest cab shut down in history and a rather embarrassed driver legging it along the platforms to get to the right train!
The guard did a reasonable job of not peeing himself laughing but I could see his shoulders bouncing with him laughing!![]()
I once did that, as in boarded a train on platform 2 when I should have been on platform 1. Unfortunately as I don't drive the trains, it just left without me.I have done that once (my fault) at Guildford, I even buzzed the siggy up when the signal didnt clear to be told my train was on platform 2, not platform 1, Cue the fastest cab shut down in history and a rather embarrassed driver legging it along the platforms to get to the right train!
The guard did a reasonable job of not peeing himself laughing but I could see his shoulders bouncing with him laughing!![]()