• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 458/5

Status
Not open for further replies.

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,514
Location
Ely
Fair comment, but I still suspect the 36 units will reach the end of their service life well before they run out of DC infrastructure to be used on...

36 five car EMUs with 1/3 and 2/3 door configurations?
Brighton Main Line anyone? :)
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
Gatwick to Brighton is one of the candidates for AC conversion after Basingstoke to Southampton/Poole, and Brighton is operated by 12 car sets so swapping to 10s would be a step backwards in capacity.
 

southern442

Established Member
Joined
20 May 2013
Messages
2,265
Location
Surrey
Gatwick to Brighton is one of the candidates for AC conversion after Basingstoke to Southampton/Poole, and Brighton is operated by 12 car sets so swapping to 10s would be a step backwards in capacity.

Probably a naive question but what is the purpose of the Basingstoke-Southampton AC conversion? Wouldn't it just create a bit of trouble with the surrounding lines?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,602
Location
Nottingham
Probably a naive question but what is the purpose of the Basingstoke-Southampton AC conversion? Wouldn't it just create a bit of trouble with the surrounding lines?

25kV wastes a lot less power than 750V, and with a lot of the DC supply equipment due for replacement the view is that it would be cheaper in the long run to convert the 750V network to 25kV. Basingstoke-Southampton is intended as a pilot route because the EMUs that use it can be converted reasonably easily to dual voltage, and in conjunction with other electrifications there is the possibility of the diesel Cross Country and freight services going over to electric haulage too.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,232
Probably a naive question but what is the purpose of the Basingstoke-Southampton AC conversion? Wouldn't it just create a bit of trouble with the surrounding lines?

The DfT's explanation is basically based on providing an electrified freight spine from Southampton Docks, via Didcot, Oxford and Leamington and joining the WCML at Coventry, or via EWR and the MML towards Sheffield and Leeds. Having provided that facility they then hope that the FOCs will look at electric traction.

There are also the perceived cost savings because renewal of the power supply on that part of the route is required shortly anyway - and research has found that AC is cheaper all round.

Any new passenger flows that are made available seem to me to be a secondary effect:

6. The strategy is built around four priorities. The first of these is the creation of the “Electric Spine”, a high capacity passenger and freight electric corridor running from the South Coast through Oxford, Bedford and via the Midland Main Line to the East Midlands and South Yorkshire, with a link from Oxford to the West Midlands and the North-West. The Electric Spine investment is expected to deliver cost savings to the railway in the medium term, because electric rolling stock has lower purchase, maintenance and fuel costs. It also leads to choices for further efficient route electrification in Control Period 6 (CP6).
7. The creation of an electrified route linking the core centres of population and economic activity in the Midlands and North with the major container port of Southampton is a crucial step in creating the right conditions for significant private sector investment in electric freight locomotives, which offer more efficient, capable and sustainable freight haulage. The rolling programme of electrification is expected to help make rail freight commercially more attractive across England, supporting our growing international trade and the transfer of container traffic from road.
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/3641/railways-act-2005.pdf

This is getting a bit off-topic for this thread though...
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Probably a naive question but what is the purpose of the Basingstoke-Southampton AC conversion? Wouldn't it just create a bit of trouble with the surrounding lines?

due to transmission losses, 750V DC needs feeds from the grid every couple of miles. 25kV AC is vastly more efficient, requiring connections to the grid that are far more widely spaced. As others have mentioned, the SWML DC equipment is elderly, and despite upgrades to help with modern stock, is needing complete renewal. All the DC stock running through the section is AC-capable.
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
there is the possibility of the diesel Cross Country [...] going over to electric haulage too.

Only if they also electrify Southampton to Bournemouth, or stop running these services as far as Bournemouth.

All the DC stock running through the section is AC-capable.

Indeed - but both SWT and Southern stock would need to be upgraded, unless they want to get rid of the Southern --> Fareham --> Eastleigh --> Southampton Airport (Parkway) --> Southampton Central services (dual-voltage is going to be from Redbridge to St. Denys). So this means all 377s, 444s and 450s would need dual-voltage support.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Only if they also electrify Southampton to Bournemouth, or stop running these services as far as Bournemouth.

Or swap it round so that Southampton/Reading terminators go to Manchester (electric), and Bournemouth services go to Newcastle (diesel for the forseeable future).
 

WestCountry

Member
Joined
31 Dec 2010
Messages
332
Location
Cambridge, UK
Indeed - but both SWT and Southern stock would need to be upgraded, unless they want to get rid of the Southern --> Fareham --> Eastleigh --> Southampton Airport (Parkway) --> Southampton Central services (dual-voltage is going to be from Redbridge to St. Denys). So this means all 377s, 444s and 450s would need dual-voltage support.
Why 'all'? Southern already manage a subfleet of dual-voltage units (the 377/2s) for WLL and WCML services.
By the time Southampton is done they'll probably have got the /5s and a few more /2s back from Thameslink, which should give them easily enough dual-voltage units to run the service without touching any of the DC-only ones.
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
Or swap it round so that Southampton/Reading terminators go to Manchester (electric), and Bournemouth services go to Newcastle (diesel for the forseeable future).
Unless service patterns drastically change, that would mean very few services to Manchester (just as there are currently very few trains to Newcastle/Scotland).
--- old post above --- --- new post below ---
Why 'all'? Southern already manage a subfleet of dual-voltage units (the 377/2s) for WLL and WCML services.
By the time Southampton is done they'll probably have got the /5s and a few more /2s back from Thameslink, which should give them easily enough dual-voltage units to run the service without touching any of the DC-only ones.
Good point, that's fair enough - I suppose it shouldn't be too hard for them to organise it so that the few trains that go via Eastleigh are dual-voltage ones. It would cause more of an issue for diversions, so I reckon they would need enough to replace all services if there were a diversion.
 
Last edited:

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Unless service patterns drastically change, that would mean very few services to Manchester (just as there are currently very few trains to Newcastle/Scotland).

I'd assume that if new electric stock was purchased then all the services that currently terminate at Reading would probably be extended to Southampton, so it keeps its 1tph to Manchester. (Bournemouth and Brockenhurst lose their 1tph to Manchester but get 1tph to Newcastle instead.)
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
Is there enough capacity for that? I always assumed (possibly incorrectly) that it was SWML capacity (lack thereof) that prevented this from happening.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
No, it's lack of Voyagers that's preventing it mainly (the only reason they were able to extend to Southampton in the first place is because of the HSTs XC introduced freeing some up).

Having to run to Glasgow every other hour now that East Coast has dropped their Glasgow services hasn't helped.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,232
No, it's lack of Voyagers that's preventing it mainly (the only reason they were able to extend to Southampton in the first place is because of the HSTs XC introduced freeing some up)...

Not according to the GWML RUS. They explained that existing freight paths prevented the extensions running hourly. I quoted the relevant paragraph in the 2010 thread about these services:

http://www.railforums.co.uk/showpost.php?p=486056&postcount=4
 

southern442

Established Member
Joined
20 May 2013
Messages
2,265
Location
Surrey
Why 'all'? Southern already manage a subfleet of dual-voltage units (the 377/2s) for WLL and WCML services.
By the time Southampton is done they'll probably have got the /5s and a few more /2s back from Thameslink, which should give them easily enough dual-voltage units to run the service without touching any of the DC-only ones.

Plus the 377/6's will be dual voltage.

I appear to have drifted the thread a bit off topic, we need to get back to the main subject.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
According to the SWT Yahoo Group 458534 is due for delivery to SWT this Friday, 6 Sept. Hooray!!!

Yay that'd make sense for the November service date! So this time next year SWT will have 485/5s, 456s and an additional fleet of 5 car EMUs on their way. Wow
 

shedman

Member
Joined
14 Feb 2011
Messages
364
Drove past a driving vehicle on the M1 heading northbound Sunday morning at around 1100
 

Monty

Established Member
Joined
12 Jun 2012
Messages
2,370
The first unit is expected to be delivered to Wimbledon Park today, does anyone have the timings for the move? I'm on the Mainline today and it would be nice to get a cheeky photo. :)
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,124
I doubt the 458/0s will be going just yet. I thought most of the 458/5s would be in service before they went.

I think the original plan was to send the first pair of 458/0s away once the first 458/5s were in service, but this may well have changed due to the late running of the program.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
I doubt the 458/0s will be going just yet. I thought most of the 458/5s would be in service before they went.

How does that work then?
The 458/0s will be turned into 458/5s once most of the 6 460s have been converted to 458/5s, hardly "most of the 458/5s would be in service before they went" is it.
 

cjmillsnun

Established Member
Joined
13 Feb 2011
Messages
3,275
How does that work then?
The 458/0s will be turned into 458/5s once most of the 6 460s have been converted to 458/5s, hardly "most of the 458/5s would be in service before they went" is it.

OK badly worded, you're right I meant the 460 converted 458/5s rather then the 458/0 converted ones.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,124
I doubt the 458/0s will be going just yet. I thought most of the 458/5s would be in service before they went.

RAIL this month reports that 8001/2 will be off up North as soon as the first two 458/5s enter service, expected on October.
 

442Haz

Member
Joined
9 Sep 2013
Messages
62
they do have a certain charm about them, no denying it. The black should be extended to the whole upper cab though. And interesting to see where the unit numbers and dot matrix will go
 
Joined
28 Jun 2012
Messages
832
Location
Epsom Downs
they do have a certain charm about them, no denying it. The black should be extended to the whole upper cab though. And interesting to see where the unit numbers and dot matrix will go


The dot matrix is above the gangway where it is on a 458/0. The numbers should be going above the windows like a Desiro.

8004 will likely be one of the first two now as it had impact damage following a fatality a while back. It can't be coupled at one end, but repairing it and then chopping about with it would be a bit of a waste.
 
Status
Not open for further replies.

Top